【文章內(nèi)容簡(jiǎn)介】
strength (minimum 25 N/mm2) with a minimum pull off strength of N/mm2.混凝土基面必須密實(shí)和有足夠的抗壓強(qiáng)度(最小25 N/mm2), N/mm2。Substrate needs to be dry, moisture content ≤4%. Test method: Sika174。Tramex meter or CM measurement. A waterproofing layer must be installed under the concrete base,or vapor going up will result in epoxy layer bubbling and delamination. 2 mm Sikafloor 81 EpoCem system need to be applied as a moisture barrier.基層須干燥,含水率≤4%,測(cè)試方法:Sika174。Tramex儀或CM測(cè)量法?;炷粱鶎酉马氃O(shè)置防水層,否則存在水汽上升導(dǎo)致環(huán)氧層起泡、脫落風(fēng)險(xiǎn)。建議施工2mm Sikalfoor 81 EpoCem系統(tǒng)作為防潮層。The substrate must be clean and free of all contaminants such as dirt, oil, grease, coatings and surface treatments, etc.基面必須清潔、無(wú)任何污染物,如:灰塵、油、油脂、涂層和表面處理等。Measure Application Conditions 施工條件測(cè)量Substrate Temperature: +10℃ min. / +30℃ max.基面溫度:最低+10℃/最高+30℃Ambient Temperature +10℃ min. / +30℃ max.環(huán)境溫度:最低+10℃/最高+30℃Relative Air Humidity: 80% . max.相對(duì)空氣濕度:最高80%相對(duì)濕度Dew Point: The substrate and uncured floor must be at least 3℃ above dew point to reduce the risk of condensation or blooming on the floor finish.露點(diǎn):基面和未固化的地面溫度必須至少高于露點(diǎn)3℃,以防水汽凝結(jié)形成斑點(diǎn)。Substrate Preparation 基面處理reclean the floor surface, degrease agent will be used where necessary.清潔地表,必要時(shí)使用清潔劑;Carry out surface preparation by using shot blasting machine (dust free self enclosed steel shot blasting unit) and hand tools to remove