【文章內(nèi)容簡介】
program…contd. –Metrics Management system –A demo / presentation at this point may be useful –Analyses of data ? Set up baselines ? Trend / statistical analyses 169。CyberQ Consulting Metrics FARs ? Here is some analyses that we conducted: –Concept of statistical control ? +/ 3 sigma ? +/ 1 sigma ? target driven limits –A few samples at this point will be useful 169。CyberQ Consulting Senior management ? How do we manage with numbers? ? Status reports are quantitative ? Look at control limits and act on the exceptions –Quality of products –Performance of projects –Process improvement opportunities 169。CyberQ Consulting PROCESS MATURITY EXERCISE There is no One Right answer to this one !!! The goals are discovery and discussion. Read through the problem statements and write down the level after the problem statement. 169。CyberQ Consulting 1. Software Projects do not consistently follow existing procedures for sizing, costing, scheduling, review and tracking. 2. Subcontractor management practices not documented or enforced 3. No required training for software