freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

最新led建設(shè)方案(十三篇)(編輯修改稿)

2025-08-03 00:20 本頁面
 

【文章內(nèi)容簡介】 。雙方履行完合同規(guī)定的義務(wù)后,本合同即行終止。,雙方可簽訂補充協(xié)議,有關(guān)協(xié)議及雙方認可的來往電報、傳真、會議紀(jì)要等,均為本合同組成部分,與本合同具有同等法律效力。:發(fā)包人名稱: 設(shè)計人名稱:(蓋章) (蓋章)法定代表人:(簽字) 法定代表人:(簽字)委托代理人:(簽字) 委托代理人:(簽字)建設(shè)行政主管部門備案 鑒證意見:(蓋章) (蓋章)備案號: 經(jīng) 辦 人:備案日期: 年 月 日 鑒證日期: 年 月 日led建設(shè)方案篇六建設(shè)工程設(shè)計合同construction project design contract項目名稱:project name:項目建設(shè)地點:project location:合同編號:contract no.:設(shè)計證書等級:grade of design license:委托方:client:承接方:design firm:簽訂日期:signed on:委托方(甲方):client (party a):承接方(乙方):design firm (party b):甲方委托乙方承擔(dān)xx項目(一期)工程設(shè)計,經(jīng)雙方協(xié)商一致,簽訂本合同。party a entrusts party b to undertake the design for . this contract is made by the two parties after their mutual agreement.第一條本合同依據(jù)下列文件簽訂article1. this contract is made on the basis of the following documents:《中華人民共和國民法典》、《中華人民共和國建筑法》和《建設(shè)工程勘察設(shè)計市場管理規(guī)定》。 the contract law of the people’s republic of chin, the building regulations of the people’s republic of china and the developmental law of the people’s republic of china.。 relevant building amp。 design codes and regulations of the state and of the shanghai municipality.。 the approval documents that are required for this construction project.第二條本合同工程設(shè)計項目的名稱、地點、規(guī)模、投資、內(nèi)容及標(biāo)準(zhǔn)article2. the name, location, size, investment sum, function, design contents and standards::xx項目(一期) project name:: project location::總建筑面積約 平方米(其中地下面積約 平方米),高度 米。 project size: the total floor area is approximately ㎡(of which the floor area of the underground area is ㎡), the total height is m.:商業(yè)辦公綜合樓 project features amp。 remarks: a mercial cum office building plex:控制在 億元人民幣以下 project investment in total: controlled within million yuan rmb:紅線內(nèi)的建筑、結(jié)構(gòu)、機電、總體設(shè)計(包括3000㎡人防設(shè)計,不包括精裝修設(shè)計、園藝設(shè)計和藝術(shù)泛光照明等專業(yè)設(shè)計),施工圖設(shè)計約為70000㎡(不包括五層到七層的soho區(qū)域)。 design requirements and scope of work: the scope of work shall include master planning and building design that are located within the boundary line. for building design it shall prise of the architectural, structural amp。 m/e work. (including 3,000㎡of airraid shelter design, but excluding other specialists’ design, such as the luxurious interior design, landscaping design and facade flood lighting design). the total floor area during the working drawing stage is 70,000㎡(excluding the soho area, which is starting from the fifth floor level to the seventh floor level).第三條甲方向乙方提交的有關(guān)資料及文件(見下表)article3. relevant documents which shall be issued by party a to party b:序號s/n資料及文件名稱name of documents份數(shù)copies提交時間submission date備注remarks1政府批文government approval documents1全套full set2設(shè)計任務(wù)書design instructions13規(guī)劃紅線圖plan of property line14水、電、氣源落實情況說明design information of utilities (water, electricity amp。 gas supply etc.)15規(guī)劃設(shè)計要求requirements from the government16地址勘探報告soil investigation report17原打入樁的資料design information of as built pilings18概念方案concept design information1第四條乙方向甲方交付的設(shè)計文件(見下表)article4. design documents which shall be submitted by party b to party a (listed as follows):序號s/n設(shè)計文件名稱design documents階段phase份數(shù)copies提交時間submission date備注remarks1方案設(shè)計文件schematic design documents方案schematic1030天內(nèi)within 30 days2初步設(shè)計文件. documents擴初within 30 days3初步概算文件preliminary estimate擴初within 7 days4施工圖設(shè)計working drawings施工圖construction documents15樁位圖擴初批準(zhǔn)后15天the piling drawings will be submitted within 15 days after the . approval其余擴初批準(zhǔn)后60天the rest of the drawings will be submitted within 60 days after the . approval5光盤文件cd files 施工圖to be decided注:設(shè)計文件深度按照《建筑工程設(shè)計文件編制深度規(guī)定》(建設(shè)部20__年4月版)執(zhí)行。notes: the design documents shall be prepared in pliance with the regulations on detail requirements of design documents for construction project (issued by ministry of construction dated in april, 20__).第五條設(shè)計費用及支付方法article 5. design fee and the mode of payment: (含所有乙方應(yīng)繳納的稅費及其它政府規(guī)定應(yīng)由乙方交納的款項) party a shall pay the design fee of rmb yuan for this project to party b (this fee shall include taxes and all other duties that should be paid by party b as required by the government regulations).(見下表): the payment method is (listed as the following):序號s/n階段phase金額(元)amount (yuan)說明remarks1方案階段schematic design合同簽訂后30日內(nèi)30 days after contract is signed2擴初階段design development擴初批準(zhǔn)后30日內(nèi)30 days after . approval3施工圖階段construction document施工圖提交審圖后30日內(nèi)30 days after the . approval by the authority.4施工配合construction coordination總包施工合同簽訂后30日內(nèi)30 days after the main contractor has been awarded施工配合585,元工程開工后,按季度分五期支付,每次支付70,5 installment payment shall be made quarterly throughout the entire construction period. each installment amounting to 7, yuan5竣工驗收階段the pletion amp。 handing over stage竣工驗收后after the pletion and handing over of the project第六條雙方責(zé)任article6. responsibilities of both parties: responsibilities of party a:,在規(guī)定的時間內(nèi)向乙方提交資料及文件,并對其完整性、正確性及時限負責(zé)。甲方提交上述資料及文件超過規(guī)定期限15天以內(nèi),乙方按本合同第四條規(guī)定交付設(shè)計文件時間順延;超過規(guī)定期限15天以上時,乙方有權(quán)重新確定提交設(shè)計文件的時間。 according to the contents stated in article 3 of this contract, party a shall submit materials and documents to party b within the stipulated time as described and shall be responsible for the pleteness, correctness and validity of such materials and documents. in the event that party a has delayed the issuance of such materials and documents, but not exceeding 15 days from the stipulated time, party b could consequently postpone the submittal of the design documents as stipulated in article 4 of this contract. in case that party a has delayed the issuance of materials and documents for more than 15 days exceeding the stipulated time limit, party b shall have the right to determine the new date for submitting the design documents.、規(guī)模、條件,或?qū)μ峤毁Y料作重大修改,以致造成乙方設(shè)計需返工時,雙方除需另行協(xié)商簽訂補充合同、重新明確有關(guān)條款外,甲方應(yīng)按乙方所耗工作量向乙方支付返工費。 if party a s greatly the design project, scale, conditions which they have already entrusted to party b, or the materials provided by party a is wrong/inplete or party a makes major ations to the approved design and the information given, as a result of which, has caused party b to redo the design work, or has generated u
點擊復(fù)制文檔內(nèi)容
小學(xué)相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖片鄂ICP備17016276號-1