freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

電氣工程與其自動化專業(yè)110kv區(qū)域變電站電氣部分設(shè)計論文(留存版)

2025-08-11 15:36上一頁面

下一頁面
  

【正文】 小結(jié)中型配電裝置的所有電器都安裝在同一水平面內(nèi)并裝在一定高度的基礎(chǔ)上,母線所在水平稍高于電器所在水平面,構(gòu)架高10m。便于檢修和安裝對于各種型式的配電裝置,都要妥善考慮檢修和安裝條件。 避雷器選型表安裝地點型號110kVYH5W—108/28135kVYH5W—51/13410kVYH5WZ—17/45 小結(jié)主控制樓:屋內(nèi)配電裝置鋼筋焊接組成接地網(wǎng),并可靠接地。查設(shè)備手冊表選擇LGJ185/45鋼芯鋁絞線,在最高允許溫度+70度的長期載流量為552 A,滿足最大工作電流的要求。電流互感器選型表安裝地點型號110kVLVQB—11035kVLVQB—3510kVLMZ—12/1500/5電壓互感器的選擇:電壓互感器的選擇應(yīng)滿足繼電保護、自動裝置和測量儀表的要求,對于:320kV配電裝置,宜采用油絕緣結(jié)構(gòu),也可采用樹脂澆注絕緣結(jié)構(gòu)的電磁式電壓互感器。 10S熱穩(wěn)定電流: kA表51 斷路器、隔離開關(guān)參數(shù)表器件/型號安裝地點參數(shù)額定電壓Ue(KV)額定電流Ie(KA)動穩(wěn)定電流Idw(kA)熱穩(wěn)定電流 (kA)斷路器LW14—110110 KV110200080,3秒ZW3512635KV16006325,4秒ZN63A12/10KV10125080,4秒隔離開關(guān)GW7110110KV側(cè)1106005514,5秒GW1435(D)35 KV側(cè)3512504016,2秒GW8110主變中性點110400,10秒 互感器的選擇電流互感器的選擇:110kV側(cè)電流互感器Igmax==*110=(A)Ue=110 KV選?。篖VQB—110,300/5,電流互感器參數(shù):1秒熱穩(wěn)定電流:40KA,動穩(wěn)定電流:100KA動穩(wěn)定校驗:ich=(kA) <100 kA動穩(wěn)定校驗合格。表52 ZW2335C型斷路器參數(shù)計算數(shù)據(jù)ZW2335CU(KV)35Ue(KV)Igmax(A)104Ie(A)1600I//(KA)Ir(KA)25ich(KA)idw(KA)63I2∞tdz*Ir2t252*4動穩(wěn)定校驗:Igmax=104(A)<Ieich=(kA) <Idw=100 kA動穩(wěn)定校驗合格。S)Q承受=*3 (kA2為了保證電氣裝置的可靠性和經(jīng)濟性,必須正確地選擇電氣設(shè)備和載流導體。 主變電抗計算SFSZ7—31500/110的技術(shù)參數(shù)∴X12* =( Ud1%/100)*(Sj/SB) =() *(100/40)= 短路電流計算的步驟目前在電力變電站建設(shè)工程設(shè)計中,計算短路電流的方法通常是采用實用曲線法,其步驟如下:選擇要計算短路電流的短路點位置;按選好的設(shè)計接線方式畫出等值電路圖網(wǎng)絡(luò)圖;1)在網(wǎng)絡(luò)圖中,首選去掉系統(tǒng)中所有負荷之路,線路電容,各元件電阻;2)選取基準容量 和基準電壓Ub(一般取各級的平均電壓);3)將各元件電抗換算為同一基準值的標么電抗;4)由上面的推斷繪出等值網(wǎng)絡(luò)圖;對網(wǎng)絡(luò)進行化簡,把供電系統(tǒng)看為無限大系統(tǒng),不考慮短路電流周期分量的衰減求出電流對短路點的電抗標幺值,即轉(zhuǎn)移電抗;求其計算電抗;由運算曲線查出短路電流的標么值;計算有名值和短路容量;計算短路電流的沖擊值;1)對網(wǎng)絡(luò)進行化簡,把供電系統(tǒng)看為無限大系統(tǒng),不考慮短路電流周期分量的衰減求出電流對短路點的電抗標幺值,并計算短路電流標幺值、有名值。2)當母線或母線隔離開關(guān)發(fā)生故障或檢修時;各回路必須在檢修或故障消除前的全部時間內(nèi)停止工作;.3)出線開關(guān)檢修時,該回路停止工作。 2)在610kV配電裝置中,出線回路數(shù)不超過5回時,一般采用單母線接線方式,出線回路數(shù)在6回及以上時,采用單母分段接線,當短路電流較大,出線回路較多,功率較大,出線需要帶電抗器時,可采用雙母線接線。根據(jù)容量選擇站用電變壓器如下:型號:SL7—125/10;容量為:125(kVA)連接組別號:Yn,yn0 調(diào)壓范圍為:高壓:177。4)調(diào)壓方式的選擇:普通型的變壓器調(diào)壓范圍小,僅為177。 設(shè)計原則和基本要求 設(shè)計按照國家標準要求和有關(guān)設(shè)計技術(shù)規(guī)程進行,要求對用戶供電可靠、保證電能質(zhì)量、接線簡單清晰、操作方便、運行靈活、投資少、運行費用低,.并且具有可擴建的方便性。關(guān)鍵詞 電氣主接線設(shè)計;短路電流計算;電氣設(shè)備選擇;設(shè)計圖紙AbstractPower system substation as an important part of the entire power system directly affects the safety and economic operation. To be designed in this paper is a stepdown substation substation in the system plays the role of aggregation and distribution of electric energy, charged with the factory to the region, the important task of rural electrification. The pletion of the substation will not only strengthen the local power grid network structure, but also for the local industrial and agricultural production provides enough power, so that the regional power grid so as to achieve safe, reliable and economic operation purposes.The paper 110kv substation once part of the electrical design, the first original data through the analysis and selection based on total load of the substation main transformer, the main wiring under both economical and reliable, flexible operation requirements, select the main connection of two programs to be selected A technical parison, out of poor program to determine the main electrical substation connection program.Second, the shortcircuit current calculation, obtained from the threephase short circuit calculation occurs when shortcircuit the voltage level of the bus, its steadystate current and the impact of shortcircuit current value. According to the results and the voltage level of voltage and maximum continuous operating current of the main electrical equipment selection and validation (including circuit breaker, disconnecting switch, current transformer, voltage transformer, etc.).Finally, the main draw of the electrical wiring diagram, electrical general layout map, lightning protection and other related design layout plan drawings. Keywords Electrical main wiring design。畢業(yè)設(shè)計(論文)工作進度計劃::收集資料,形成論文總體框架,完成中期審查。 評閱教師簽名 年 月 日答辯小組評語:答辯小組組長簽名 年 月 日中 文 摘 要 變電站作為電力系統(tǒng)中的重要組成部分,直接影響整個電力系統(tǒng)的安全與經(jīng)濟運行。110kV出線無電源。35kV進出線共2回,兩回進線連接著35kV電源,輸送容量各為35000KVA。一般變電站裝設(shè)一臺站用變壓器,對于樞紐變電站、裝有兩臺以上主變壓器的變電站中應(yīng)裝設(shè)兩臺容量相等的站用變壓器,互為備用,如果能從變電站外引入一個可靠的低壓備用電源時,也可裝設(shè)一臺站用變壓器。 2)靈活性 電氣主接線不但在正常運行情況下能根據(jù)調(diào)度的要求靈活的改變運行方式,達到調(diào)度的目的,而且在各種事故或設(shè)備檢修時,能盡快的退出設(shè)備、切除故障,使停電時間最短、影響范圍最小,并在檢修設(shè)備時能保證檢修人員的安全。有匯流母線的主接線形式包括單母線和雙母線接線。圖33 單母線接線 35KV側(cè)主接線方案 A方案:單母線接線B方案:單母線分段接線圖34 單母線分段接線分析:A方案的主要優(yōu)缺點: 1)接線簡單、清晰、設(shè)備少、投資小、運行操作方便且利于擴建,但可靠性和靈活性較差。二、短路電流計算的一般規(guī)定驗算導體和電器動穩(wěn)定、熱穩(wěn)定以及電器開斷電流所用的短路電流,應(yīng)按工程的設(shè)計規(guī)劃容量計算,并考慮電力系統(tǒng)的遠景發(fā)展規(guī)劃(一般為本期工程建成后5~10年)。 短路電流計算結(jié)果短路點基準電壓VaV(KV)穩(wěn)態(tài)短路電流有名值I″KA短路電流沖擊值ich(KA)短路全電流最大有效值Ich(KA)短路容量S″( MVA)F1115980
點擊復制文檔內(nèi)容
環(huán)評公示相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1