freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

超平地坪施工方案英漢雙語(留存版)

2024-12-27 09:31上一頁面

下一頁面
  

【正文】 用同一公司的商品混凝土; Concrete must be supplied by the same pany on the same construction site。 2 cm; 含氣量在 177。在要求超平工業(yè)地坪的今天,激光整平機尤為 重要。 Levelness FL: variations tested over the distance of 300cm. 2.測試方法及標(biāo)準(zhǔn) Test method - 使用設(shè)備: FloorPro 或 FMeter Equipment used: FloorPro or FMeter - 測試時間: 地坪拋光結(jié)束后 24 小時內(nèi) Test time requirement: the floor must be test within 72 hours after floor installation. - 提供測試結(jié)果資料。 Everything related must be affirmed carefully before concrete casting. Once something unexpected happened during construction and a prolonged time is needed, curing must be taken immediately to the acplished area in order to prevent foreign material mix in. 混凝土鋪注前需確認的事宜: Matters below must be taken into account before concrete casting: * 鋪筑時水平標(biāo)準(zhǔn)點的設(shè)置; Surveyor’s pole setup method. * 表面的清潔; Surface cleaness. * 混凝土鋪筑設(shè)備確保與否; Concrete screeding equipment. * 混凝土地坪的厚度; The thickness of RC layer. c. 混凝土鋪筑標(biāo)準(zhǔn): Concrete casting standard: 混凝土鋪筑時, 從開始到結(jié)束自始自終嚴(yán)格進行管理。超 平地坪施工方案 超平地坪施工方案 Construction Scheme for Flat Floor 一、施工程序框圖與施工步驟 Construction procedure frame and construction scheme 1. 地坪標(biāo)高確認: Confirm floor elevation 。 On site passages for concrete transport and equipments entrance. *日鋪筑面積; Casting areas per day. * 混凝土鋪筑量; Casting quantity of concrete. *運輸時間; Transport time of pumping truck. * 攪拌車數(shù)量; Numbers of pumping truck. * 鋪筑作業(yè)及人員編排; Casting work and workers arrangement. * 設(shè)定鋪筑區(qū)域; Arrange casting district. * 新老混凝土結(jié)合部位的處理; Joint treatments between the old and new concrete. * 鋪筑人員的結(jié)構(gòu); Frame of construction workers. 監(jiān)理人員審核鋪筑計劃時,應(yīng)對會影響混凝土鋪筑的各個因素及實施的可行性等一一審核; Every possible factor that could influence concrete casting and co
點擊復(fù)制文檔內(nèi)容
教學(xué)課件相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1