【正文】
d from the operating position at times of plant maintenance. 水平槽的上部側(cè)面有可移動的側(cè)板可保證鍋爐維修時把撈渣機拖出來。 Buyer : Guangdong Guohua Yeudian Taishan Electric Power Plant Project : Taishan Power Plant Phase I 3 x 600MW CBMH Project No. C6196 Contract No. 2020RCC/13069UK Document No. C6196/MM/1 Operating and Maintenance Instructions 7 Submerged Scraper Conveyor 刮板撈渣機 The top horizontal trough of the conveyor is water filled to a minimum depth of 2020mm. The water temperature is maintained at or below 60186。 7. FOLLOWING MAINTENANCE WORK, ENSURE THAT ALL GUARDS HAVE BEEN REPLACED AND NO TOOLS OR OTHER EQUIPMENT HAS BEEN LEFT IN THE CONFINES OF THE MOVING PARTS. 維修完,確保所有的門都被放回原處且沒有工具或其他設(shè)備遺留在移動部件中 Buyer : Guangdong Guohua Yeudian Taishan Electric Power Plant Project : Taishan Power Plant Phase I 3 x 600MW CBMH Project No. C6196 Contract No. 2020RCC/13069UK Document No. C6196/MM/1 Operating and Maintenance Instructions 6 EQUIPMENT DESCRIPTION 設(shè)備描述 Bottom Ash Well 渣井 Boiler Ash is discharged into the Submerged Scraper Conveyor (SSC) on a continuous basis via a refractory lined Bottom Ash Well. The Ash Well is a self supporting portal frame design plete with 2 off large bottom openings. 鍋爐底渣通過內(nèi)襯有耐火材料的渣井,連續(xù)的排放到撈渣機( SSC)上。二級刮板運行維護手冊 Buyer : Guangdong Guohua Yeudian Taishan Electric Power Plant Project : Taishan Power Plant Phase I 3 x 600MW CBMH Project No. C6196 Contract No. 2020RCC/13069UK Document No. C6196/MM/1 Operating and Maintenance Instructions 2 OPERATING AND MAINTENANCE INSTRUCTIONS 運行維護手冊 CONTENTS 內(nèi)容 Instruction Section 指導 章節(jié) Introduction介紹 ..................................................................1 Importance of the Manual手冊重要性 General Safety 通用安全 Equipment Description 設(shè)備描述 Design Parameters 設(shè)計參數(shù) SSC Water Requirement 撈渣機水要求 Functional Design Specification 功能設(shè)計參數(shù) ................2 Routine Maintenance 日常維護 .........................................3 Inspection Activities常規(guī)檢查 Movement of SSC to Parked Position移至檢修位置 Repair/Replacement Activities維修 /更換 Instrument List 儀表清單 ....................................................4 Valve List 閥門清單 .............................................................5 Proprietary Parts 附屬設(shè)備清單 ........................................6 Buyer : Guangdong Guohua Yeudian Taishan Electric Power Plant Project : Taishan Power Plant Phase I 3 x 600MW CBMH Project No. C6196 Contract No. 2020RCC/13069UK Document No. C6196/MM/1 Operating and Maintenance Instructions 3 SECTION 1 第一部分 INTRODUCTION 介紹 IMPORTANCE OF THE MANUAL 手冊的重要性 The manual shall be regarded as an essential part of the product. 本手冊最為產(chǎn)品的重要組成部分 The manual shall be kept for the life of the product. 本手冊應(yīng)終生保存 Ensure that any revision received is incorporated in this manual in the correct place and that the acpanying form is signed and returned. 應(yīng)確保任何修改版本和本手冊放在一 起,并妥善保管。 2. ONLY QUALIFIED AND COMPETENT PERSONNEL MUST CARRY OUT ANY MAINTENANCE OPERATION. 只有經(jīng)過培訓的有經(jīng)驗的技術(shù)人員才能維修設(shè)備。 The ash gates are operated using the local control panel and are powered by a hydraulic power pack mounted on the Ash Well platform. The control system opens and closes the gate in a stepwise sequence, each gate having an open and closed limit to confirm the gate location. 渣井關(guān)斷門用就地的控制盤來操作,由放置在渣井平臺上的液壓動力站來推動它。C。 The conveying chain is of the round link design and has a surface hardness of 800 HV minimum. The wear edges of the conveying flight bars are of abrasive resistant material and are designed to have a minimum of 16000 operating hours. Bearing service life is in the order of 40000 operating hours and the submerged bearings are suitable for operation between a temperature range of 20186。 A hydraulic power pack is installed at the base of the conveyor incline and is suitably designed to drive the conveyor at all times under all modes of operation. The maximum forward speed of the chain is m/min and SSC trough pletely full of ash. 液壓動力站安裝在斜升段的底部,合理設(shè)計以保證在各種工礦下工作。 The crusher is designed to acmodate the maximum tonnage rates of the SSC. The crusher drive is hydraulic and oil is supplied from the same hydraulic powerpack as the SSC. The crusher is mounted on rails for easy removal to the maintenance position. 碎渣機的設(shè)計來適應(yīng)撈渣機的最大排渣量。 A screw take up arrangement at the tail end effects the chain tensioning. 尾部螺旋升起的裝置有助于鏈條的張緊。ID ASH WELL RETRACTABLE DOORS 渣井關(guān)斷門 C6196003 BOTTOM ASH HANDLING SYSTEM – UNIT 3 底渣處理系統(tǒng) 3號機組 Pamp。渣井關(guān)斷門和撈渣機行走輪驅(qū)動僅由就地盤控制。通過最渣機的底渣被二級刮板運輸至渣倉。 Buyer : Guangdong Guohua Yeudian Taishan Electric Power Plant Project : Taishan Power Plant Phase I 3 x 600MW CBMH Project No. C6196 Contract No. 2020RCC/13069UK Document No. C6196/MM/1 Operating and Maintenance Instructions 19 For maintenance the SSC can be removed by locally controlled wheel drives. When enabled locally the SSC will be disabled and the operator can run the drives forward or reverse. During SSC removal ash gates will be closed to isolate the boiler and stop ash falling through to ground. A maintenance switch on the local ash gates local control panel will enable the ash gates to be operated when the SSC is removed. 維修時撈渣機通過就地控制的驅(qū)動被移出。 Periodically