【正文】
Tab. SCC CNCEC絕熱施工工序質(zhì)量控制表Quality control table forconstruction procedures of heatinsulation項(xiàng)目:Project裝置:Unit工號(hào):Section機(jī)械位號(hào)/管道系統(tǒng)Machine equipmentNo./Pipeline system執(zhí)行標(biāo)準(zhǔn)Standard for execution檢 查 項(xiàng) 目Inspection item等級(jí)Grade簽字/日期Signature/Date施工單位Subcontractor總包單位Contractor監(jiān)理單位Managemen建設(shè)單位Owner機(jī)械、管道交接檢查Acceptance of machine amp。Note: Clearance measured location has diagram attached ( if necessary )檢查員Inspector施工人Operator表H206Tab.SCC CNCEC 電機(jī)空氣間隙測(cè)量記錄Air gap measurement record for motor項(xiàng)目:Project裝置:Unit工號(hào):Section位號(hào)Location No.名稱(chēng)Name執(zhí)行標(biāo)準(zhǔn)Standard for execution按定子上標(biāo)定的一點(diǎn)盤(pán)車(chē)檢查空氣間隙 單位:(mm)Inspection of air gap at specified point on the stator by idle rotating Unit部 位Location1234567891011121314151617181920實(shí)測(cè)值Measured value按轉(zhuǎn)子上標(biāo)定的一點(diǎn)盤(pán)車(chē)檢查空氣間隙 單位:(mm)Inspection of air gap at specified point on the rotor by idle rotating Unit部 位Location12345678910實(shí)測(cè)值Measured value總包單位Contrator representative檢查員Inspector施工人Operator表H207Tab.SCC CNCEC 機(jī)組對(duì)中記錄Alignment record for machine set項(xiàng)目:Project裝置:Unit工號(hào):Section位號(hào)Location No.名稱(chēng)Name執(zhí)行標(biāo)準(zhǔn)Standard for execution聯(lián)軸器布置簡(jiǎn)圖:Diagram of coupler location對(duì)中情況:Alignment a1 b1 a4 a2 b4 b2 a3 b3 單位:(mm) Unit徑向 軸向Radial Axial聯(lián)軸器編號(hào)Coupler No.徑向Radial軸向Axial端面間隙Clearance at end百分表固定位置Fixed position of dial indicator允許偏差Tolerancea1a2a3a4允許偏差Toleranceb1b2b3b4規(guī)定值Stipulated value實(shí)測(cè)值Measured value備注:Remarks監(jiān)理單位Management施工單位Subcontractor建設(shè)單位Owner 總包單位Contractor 表H209Tab.SCC CNCEC機(jī)器試運(yùn)轉(zhuǎn)報(bào)告Testrun report for machine項(xiàng)目:Project裝置:Unit工號(hào):Section位 號(hào)Location No.名 稱(chēng):Name部于 位Location試車(chē)類(lèi)別Type of testrun日 期Date執(zhí)行標(biāo)準(zhǔn)Standard for execution時(shí)間Time轉(zhuǎn)速Speedr/min介質(zhì)Medium潤(rùn)滑油Lubricant軸承溫度Bearing temp. (℃)軸振動(dòng)Shaft vibration(mm)軸位移Shaft displacement(mm)備注Remarks溫度Temp.(℃)壓力Pressure(Mpa)溫度Temp.(℃)壓力Pressure(Mpa)前Front后Rear進(jìn)In出Out進(jìn)In出Out進(jìn)In出Out進(jìn)In出Out試運(yùn)轉(zhuǎn)結(jié)果Result of testrun監(jiān)理單位Management施工單位Subcontractor建設(shè)單位Owner 總包單位Contractor 表H210Tab.SCC CNCEC大型軸流風(fēng)機(jī)安裝工序質(zhì)量控制表Quality control table for installingprocedures of large axial flow blower項(xiàng)目:Project裝置:Unit工號(hào):Section位 號(hào)Location No.傳動(dòng)方式Mode of transmission名 稱(chēng):Name執(zhí)行標(biāo)準(zhǔn)Standard for execution檢查項(xiàng)目Inspection item等級(jí)Grage簽字/日期Signature/Date施工單位Subcontractor總包單位Contractor監(jiān)理單位Managemen建設(shè)單位Owner機(jī)器及附件接收Acceptance of machine and accessoriesC基礎(chǔ)驗(yàn)收Check of foundationC機(jī)器安裝Installation of machineCR驅(qū)動(dòng)機(jī)對(duì)中Alignment of driverC灌漿前檢查Inspection before groutingA。 pipeline□材料交接檢查Acceptance of material□基層表面檢查Base course surface□絕熱層檢查Heatinsulation layer□防潮層檢查Dampproof course□保護(hù)層檢查Protective course□機(jī)械位號(hào)或管線(xiàn)號(hào)Machine equipment or pipeline No.基層表面Base course surface絕熱層Insulating layer防潮層Dampproof course保護(hù)外殼Pretective course備注Remark處理方法Treatment method結(jié)果Result名稱(chēng)Name厚度(mm)Thickness結(jié)果Result名稱(chēng)Name厚度(mm)Thickness結(jié)果Result名稱(chēng)Name厚度(mm)Thickness結(jié)果Result技術(shù)負(fù)責(zé)人Technical person in charge質(zhì)量檢查員Inspector施工人Operator. 表H201Tab.SCC CNCEC機(jī) 泵安裝工序質(zhì)量控制表Quality control table for machineand pump installing procedure項(xiàng)目:Project裝置:Unit工號(hào):Section位 號(hào)Location No,名 稱(chēng)Name工作介質(zhì)Medium驅(qū)動(dòng)機(jī)類(lèi)型Type of driver傳動(dòng)方式Transmission mode執(zhí)行標(biāo)準(zhǔn)Standard for execution檢 查 項(xiàng) 目Inspection item等級(jí)Grade簽字/日期Signature/Date施工單位Subcontractor總包單位Contractor監(jiān)理單位Managemen建設(shè)單位Owner機(jī)器及附件接收 Acceptance of machine accessoriesC基礎(chǔ)復(fù)查 Check of foundationC機(jī)泵安裝 Installation of machine and pumpCR灌漿前檢查 Inspection before groutingA拆洗及回裝 Disassembling ,cleaning and reassemblingC(CR)聯(lián)軸節(jié)對(duì)中 Centering of couplersB傳動(dòng)裝置檢查 Transmission gearC潤(rùn)滑油系統(tǒng)檢查、注油Lubrication system inspection and oilingC冷卻、密封系統(tǒng)檢查 Cooling and sealing systemC試運(yùn)轉(zhuǎn) Test runAR找 正 偏 差A(yù)lignment deviation對(duì) 中 偏 差Centering deviation位 置Location允 差Tolerance0186。 equipment amp