freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

(化工部)交工資料表格(全)(完整版)

2025-08-05 16:51上一頁面

下一頁面
  

【正文】 附注:Note蓋章Sealed審核人Examiner 年 月 日 Date報(bào)告人Reporter 年 月 日 Date證 號(hào)Certificate No. NDT證 號(hào)Certificate No. NDT表H118Tab.SCC CNCEC熱處理報(bào)告Heattreatment report項(xiàng)目:Project裝置:Unit工號(hào):Section管線號(hào)/設(shè)備位號(hào)Pipeline/Equipment location No.規(guī) 格Specification焊 縫 號(hào)Weld No.材 質(zhì)Material熱處理曲線Heattreament curveTemperature溫度(℃) 時(shí)間(h) Times硬度試驗(yàn)Hardness test部 位Test location硬度值Hardness value焊 縫Weld熱影響區(qū)Heateffect zone母 材Base material說明Interpretation技術(shù)負(fù)責(zé)人Technical person in charge操作人Operator(熱處理)(Heattreatment)(硬度試驗(yàn))(Hardness test)表H119Tab.SCC CNCEC超聲波測(cè)厚報(bào)告Supersonic pachometer report項(xiàng)目:Project裝置:Unit工號(hào):Section委托單位Truster受檢件名稱Name of test piece.試驗(yàn)編號(hào)Test No.儀器型號(hào)Instrument model執(zhí)行標(biāo)準(zhǔn)Standard for execution測(cè)點(diǎn)編號(hào)Test point No.設(shè)計(jì)厚度(mm)Design thickness實(shí)測(cè)厚度(mm)Test thickness測(cè)點(diǎn)編號(hào)Test point No.設(shè)計(jì)厚度(mm)Design thickness實(shí)測(cè)厚度(mm)Test thickness測(cè)點(diǎn)示意圖:Sketch for test points蓋章Sealed審核人Examiner 年 月 日 Date報(bào)告人Reporter 年 月 日 Date證 號(hào)Certificate No. NDT證 號(hào)Certificate No. NDT表H120Tab.SCC CNCEC光譜分析報(bào)告Spectrum analysis report項(xiàng)目:Project裝置:Unit工號(hào):Section委托單位Truster試驗(yàn)編號(hào)Test No.試驗(yàn)?zāi)康腡est aim試件名稱Name of specimen規(guī) 格Specification編號(hào)Code No.檢 驗(yàn) 結(jié) 果Test results評(píng)定意見Opinion for evaluation說明:Interpretation蓋章Sealed審核人Examiner 年 月 日 Date報(bào)告人Reporter 年 月 日 Date. 表H125 Tab. H125SCC CNCEC防腐蝕施工工序質(zhì)量控制表Quality control table for construction procedures ofanticorrosion work項(xiàng)目:Project裝置:Unit工號(hào):Section設(shè)備位號(hào)/管道系統(tǒng)Equipment locationNo./Pipeline system執(zhí)行標(biāo)準(zhǔn)Standard for execution檢 查 項(xiàng) 目Inspection item等級(jí)Grade簽字/日期Signature/Date施工單位Subcontractor總包單位Contractor監(jiān)理單位Managemen建設(shè)單位Owner設(shè)備、管道交接檢查Acceptance of equipment amp。The above work conforming to the requirement of design (code) may be concealed 年 月 日 Date建設(shè)單位Owner監(jiān)理單位Management總包單位Contractor 施工單位Subontractor 表H205Tab.SCC CNCEC 機(jī)器拆檢及組裝間隙測(cè)量記錄Clearance measurement record for disassem bling, inspecting and assembling of machine項(xiàng)目:Project裝置:Unit工號(hào):Section位號(hào)Location No.名稱Name執(zhí)行標(biāo)準(zhǔn)Standard for execution間隙測(cè)量部位Clearance measured location規(guī)定值(mm)Specified value拆前間隙(mm)Clearance before disassembing組裝后間隙(mm)Clearance after disassembing日期Date注:間隙測(cè)量部位另附圖(如果需要)。180186。 pipeline□C材料交接檢查Acceptance of material□C基層表面檢查Base course surface□CR配料比檢查Mixture ratio□C絕緣層檢查Insulation layer□CR防腐蝕面層檢查Anticorrosion finishing course□BR外觀檢查Visual inspection□C設(shè)備位號(hào)或管線號(hào)equipmentlocation No.or pipelineNo.基層表面Base course surface絕緣層Insulating layer防腐蝕面層Anticorrosionfinishing course備注Remarks處理方法Treatmentmethod結(jié)果Result名稱Name層數(shù)/厚度(mm)Number oflayer andthickness結(jié)果Result名稱Name層數(shù)/厚度(mm)Number oflayer andthickness結(jié)果Result技術(shù)負(fù)責(zé)人Technical person in charge質(zhì)量檢查員Inspector施工人Operator表H126Tab.SCC CNCEC防 腐 層電火花檢測(cè)報(bào)告Electric spark test report of anticorrosion layer項(xiàng)目:Project裝置:Unit工號(hào):Section委托單位Truster試驗(yàn)編號(hào)Test No..試驗(yàn)標(biāo)準(zhǔn)Standard for examination.檢件名稱Name of specimen防腐區(qū)段Anticorrosion section防腐等級(jí)Anticorrosion grade防腐厚度 mmAnticorrosion layer thickness規(guī)范(設(shè)計(jì))要求值Required value of code (design)KV/火花長(zhǎng)度Spark length檢 測(cè) 結(jié) 果Results of test檢測(cè)部位Test location檢測(cè)值Test value檢測(cè)部位Test location檢測(cè)值Test value檢測(cè)部位Test location檢測(cè)值Test value檢測(cè)部位簡(jiǎn)圖:Diagram of test location蓋章Sealed審核人Examiner 年 月 日 Date報(bào)告人Reporter試驗(yàn)人Tester 年 月 日 Date. 表H127
點(diǎn)擊復(fù)制文檔內(nèi)容
語文相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1