【正文】
neer the “Project Material AsReceived Inspection Form” (see attached A4). 6. 2 提交報(bào)審表時(shí) 應(yīng)該提供設(shè)備出廠合格證及技術(shù)說明書、質(zhì)量檢驗(yàn)證明、有關(guān)圖紙和技術(shù)資料。 The supervision engineer shall w itness the site sampling of materials, semiproducts and structures and fittings used by the project. RESPONSIBILITIES 職責(zé) 監(jiān)理工程師負(fù)責(zé)本程序的實(shí)施 材料設(shè)備進(jìn)場(chǎng)檢驗(yàn)程序 Page 4 of 8 Supervision engineer shall be responsible for the implementation of this procedure. 核驗(yàn)原材料、設(shè)備出廠合格證 Check the exw ork certificate of conformance for raw materials and equipment. 核驗(yàn)材料、設(shè)備檢驗(yàn)或試驗(yàn)報(bào)告 Check material and equipment inspection or test reports. 組織復(fù)驗(yàn)或見證取樣試驗(yàn) Organize for reinspection or w itness sampling tests 確認(rèn)材料、設(shè)備合格后簽署報(bào)審表 Sign the inspection application form after confirming that the materials and equipment are qualified. REQUIREMENTS 材料檢驗(yàn)要求 凡運(yùn)到施工現(xiàn)場(chǎng)的材料包括半成品、構(gòu)配件,進(jìn)入施工現(xiàn)場(chǎng)前應(yīng)向 XXX區(qū)域監(jiān)理部提交《工程物資進(jìn)場(chǎng)報(bào)驗(yàn)表》,見附表 A9。滿足中國(guó)政府對(duì)工程建設(shè)強(qiáng)制性標(biāo)準(zhǔn)條文、施工驗(yàn)收規(guī)范、工程質(zhì)量驗(yàn)收統(tǒng)一標(biāo)準(zhǔn)以 及項(xiàng)目設(shè)計(jì)文件的要求。 The product exwork certificate of conformance and technical instructions (original) and inspection or test reports (original) for materials which are requested to be inspected shall be provided at the same time w ith the submital of inspection application form. These original copies shall be kept by EPC contractor or construction contractor, and those submitted to XXX should be originals or copies w ith aditional stamps by the original manufacturer. EPC 承包商或 C承包商應(yīng)確保任何進(jìn)入施工現(xiàn)場(chǎng)的材料、設(shè)備滿足相應(yīng)的質(zhì)量標(biāo)準(zhǔn),為此承包商有責(zé)任提交能說明其滿足質(zhì)量標(biāo)準(zhǔn)的任何技術(shù)文件和檢驗(yàn)或試驗(yàn)報(bào)告。 After the equipment enters the cosntruction site, the XXX engineer shall anize the contractor to carry out related inspections, within specified timing, which shall be attended by supplier representative. The inspection and acceptance shall be conducted as per equipment list and technical instructions, related quality control documetns provided by the supplier. When the inspection shows a positive result, the acceptance personnel shall sign the acceptance sheet. 材料設(shè)備進(jìn)場(chǎng)檢驗(yàn)程序 Page 6 of 8 6. 4 若供貨方質(zhì)量控制資料有誤,或?qū)嵨锱c清單不符,或?qū)|(zhì)量資料的正確性有懷疑,或設(shè)計(jì)文件及驗(yàn)收規(guī)程規(guī)定的必須復(fù)驗(yàn)合格后才可安裝的設(shè)備,應(yīng) 由有關(guān)權(quán)威部門進(jìn)行復(fù)驗(yàn)