【正文】
humidity, the lab staff shall make records properly and note the environment conditions in the test report. 實(shí)驗(yàn)人員須按實(shí)驗(yàn)室規(guī)章制度做好實(shí)驗(yàn)室清潔工作。 The training of the test/calibration staff will be carried out per the “Training Control Procedure”. The implementation of new test program or operation procedure of new equipment will be put forward by the Engineering amp。 After pleting the tests, the lab may inform the delivery department to take back the test part. In case the delivery department does not take the test part back, the lab may retain it for 15 days for reinspection. After the retention period, the lab may dispose the test part, but during retention period, the test part must be properly preserved. 試件經(jīng)測試不合格則由實(shí)驗(yàn)室出具試驗(yàn)報(bào)告交送驗(yàn)部門,由送驗(yàn)部門按《不合格品控制程序》處置。 The calibration and test equipment shall be preserved, handled and stored in accordance with the “Inspection, Measuring and Test Equipment Control Procedure”. 測試控制 Test Control 由工程技術(shù)部編制各項(xiàng)試驗(yàn)規(guī)程,其內(nèi)容包括適用范圍、使用設(shè)備、試驗(yàn)流程、試驗(yàn)性能標(biāo)準(zhǔn)等,由工程技術(shù)部制定每臺(tái)測試設(shè)備的操作規(guī)程。 Technical Department is responsible to entrust an inspection anization accredited per ISO/IEC guideline 25, or recognized by the customer, or authorized by national technical supervising authority, to periodically calibrate the test equipment at site. The equipment may be entrusted to the original manufacturer if it has not been calibrated by the authorized inspection anization yet. 對于尚無國際 /國家基準(zhǔn)可追溯的非標(biāo)測試設(shè)備,可由工程技術(shù)部負(fù)責(zé)制訂相應(yīng)校準(zhǔn)規(guī)程,校準(zhǔn)規(guī)程須包括適用范圍、使用設(shè)備、追溯標(biāo)準(zhǔn)、校準(zhǔn)地點(diǎn)、校準(zhǔn)周期、校準(zhǔn)方法、驗(yàn)收準(zhǔn)則以及發(fā)現(xiàn)問題采取措施等,校準(zhǔn)規(guī)程編號(hào)、審批按 171。 Engineering Department is responsible for the routine management of the laboratory, and the maintenance, repair, calibration and test control of the lab equipment. 人力資源部負(fù)責(zé)組織實(shí)驗(yàn)室人員的培訓(xùn)。 The Technical amp。 For the test equipment beyond the pany calibration ability, the Engineering amp。 Follow the “Inspection, Measuring and Test Equipment Control Procedure” and set up the historic records for each test equipment, including calibration record, verification certificate, calibration specifications, etc. 校準(zhǔn)設(shè)備和測試設(shè)備需按 《 檢驗(yàn)、測量和試驗(yàn)設(shè)備控制程序 》 規(guī)定進(jìn)行預(yù)防、搬運(yùn)、儲(chǔ)存。 Conduct the test according to the requirements as stated in the “Test Request” and make original records properly. After pleting the test, it is requ