【正文】
bols should be clear, check the connection of the ground circuit目測visual2電氣間隙爬電距離主電路各帶電部位與接地金屬構件之間的電氣間隙及爬電距離應不小于20mm。the live parts and metal frameworks.8外殼防護等級shell protection gradeIP30:用¢,施加10N外力,不能進入。機械電氣連鎖有效。DGCK,GGD2,GXL例行(出廠)檢驗報告DGCK, GGD2, GXL routine (factory) inspection reports項目名稱Project Name 編號NO. 產(chǎn)品名稱Product Name: 型號規(guī)格Model: 出廠編號serial number:序號No.試驗項目testing items標準要求standards測試設備testing device測試結果Testing results 備注remark1一般檢查General examination電器元件應經(jīng)過檢驗合格,有合格證明書。electrical ponents should be subject to inspection, with a certificate of pliance目測visual安裝的電器元件與設備表相符合。parts be manually operated five times, operation flexible, no clamping stagnation. Mechanical electrical chain effective.4通電操作power operation通電操作5次,電器元件動作正常、儀表指示準確,符合裝置的電氣設計要求。IP30: with 162。electrical distance and creepage distance between the parts the main circuit and metal ponents ground should be not less than 20mm. 0150mm鋼直尺straight steel ruler電氣間隙electrical distance≥10mm爬電間隙creepage distance≥3手動操作試驗互換性試驗interchangeable test a manual test 任一可移開部件在同一規(guī)格的兩個隔離室中各抽插5次,檢查互換情況,抽插應靈活。When the main electrical switch is on, between the live parts of different pole.主電路與控制電路之間。the live parts and metal frameworks.8外殼防護等級shell protection gradeIP30:用¢,施加10N外力,不能進入。機械電氣連鎖有效。PZ30 例 行(出廠)檢 驗 報 告PZ30 routine (factory) inspection reports