【正文】
g Operation with Mobile Crane ? HSE 培訓標準 CDB0000HESPCDSC20000000200HES Training Standard ? 《個人防護用品管理標準》 CDB0000HESPCDSC20000000800Management Standard for Individual Protective Article? 《工具箱會議標準》 CDB0000HESPCDSC20000000900Standard for Toolbox Meeting ? 雪佛龍 《作業(yè)許可管理標準》Chevron’s Management Standard for Work Permit ? 《設備管理辦法(試行)》 CDB0000HESPCDSC20000002100Equipment Management Method (Pilot Edition)? 《事故管理程序》 CDB0000HESPCDSC20000001400 Accident Management Procedure? 《質量檢驗計劃》 CDB0000QACPCDSC20000003200Quality Inspection Plan. 相關設計文件及規(guī)范 Related Design Documents and Specifications? 有效版本施工圖、說明書和 CDB 重要的設計文件。施工組織設計/ 方案審查意見Review Comments on Construction Organization Design/Method Statement承包單位 Contractor: 四川石油天然氣建設工程有限責任公司(SPC)監(jiān)理單位 Supervision Company: 四川華成油氣工程建設監(jiān)理有限公司( SPCS)合同號 Contract No.: CW682719 編號 No.: CDB0000TECPLNSC20000010000工程項目名稱 Engineering Project Name:川東北高含硫氣田宣漢開縣區(qū)塊氣田工程內部集輸工程Internal Gathering System of Chuandongbei HighSulfur Gas Field Xuanhan/Kai Block Gas Field Project方案描述 Description of MS:站內露空管道系統安裝方案Method Statement for Installation of Exposed Pipeline in Well Pad and Gathering Station編制依據 Compilation Basis:相關標準、施工圖等Relevant standards and construction drawings, etc.編制總說明 Compilation Instruction:指導內輸各井站露空管道系統預制、安裝Instruct prefabrication and installation of exposed pipeline in Well Pad and Gathering Station承包商報審意見 Comment for Approval from Contractor:承包單位 Contractor(章 seal): 項目負責人 Project Leader: 日 期 Date: 審查意見 Review Comment:項目監(jiān)理機構Project Supervision OrganizationCDB 專業(yè)工程師CDB Disciplined EngineerCDB QA 工程師CDB QA EngineerCDB HES 現場經理CDB HES Site ManagerCDB 現場施工經理CDB Site Construction Manager簽字 Sign 簽字 Sign 簽字 Sign 簽字 Sign 簽字 Sign 日期 Date 日期 Date 日期 Date 日期 Date 日期 Date CDB0000TECPLNSC20000010000川東北高含硫氣田宣漢開縣區(qū)塊氣田工程內部集輸工程Internal Gathering System of Chuandongbei HighSulfur Gas Field Xuanhan/Kai Block Gas Field Project 站內露空管道系統安裝方案Method Statement for Installation of Exposed Pipeline in Well Pad and Gathering Station川慶油建公司川東北高含硫氣田工程施工項目部SPC Chuandongbei Highsulfur Gas Field Project Construction Department版次Rev. 安全 SAFETY 日期 DATE編制 COMPILED 日期 DATE審核 REVIEWED 日期 DATEK03批準 APPROVED 日期 DATE站內露空管道系統安裝方案Method Statement for Installation of Exposed Pipeline in Well Pad and Gathering Station目 錄 Contents1. 工作范圍 SCOPE OF WORK...................................................................................................................................1. 簡介 BRIEF INTRODUCTION.................................................................................................................................12. 相關活動和方案 RELATED ACTIVITIES amp。Effective construction drawings, specifications and CDB important design documents.? 《石油天然氣建設工程施工質量驗收規(guī)范 站內工藝管道工程》(SY42032022)Code for quality acceptance of oil and gas construction engineering Station procedure pipeline project (SY42032022)? 《石油天然氣站內工藝管道工程施工及驗收規(guī)范》(SY04022022)Standard for Construction and Acceptance of Oil and Natural Gas Station Procedure Pipeline Project SY04022022? 《石油天然氣站內工藝管道工程施工規(guī)范》 (GB505402022)Code for Construction of Pipe Process in Oil and Gas Transmission Pipeline Station (GB505402022)? 《高酸性氣田集輸站場及凈化裝置設備與管道安裝工程施工及驗收規(guī)范》QSY XN20222022Code for Construction and Acceptance of Gathering Transportation Facilities, Purification Unit Equipments and Pipeline Installation of Highsour Gas Field Project QSY XN20222022? 《高酸性氣田集輸場站和凈化裝置工程質量驗收標準》QSY XN20222022Standard for Quality Acceptance of Gathering Transportation Facilities and Purification Unit Engineering Project of Highsour Gas Field QSY XN20222022? 《給排水管道工程施工及驗收規(guī)范》 (GB502682022) Code for Construction and Acceptance of Water Supply Pipelines GB502682022? 《現場設備、工業(yè)管道焊接工程施工及驗收規(guī)范》(GB5023698)Code for Construction and Acceptance of Field Equipment, Industrial Pipe Welding Engineering GB5023698.? 《工業(yè)金屬管道工程施工及驗收規(guī)范》(GB502352022)Code for Construction and Acceptance of Industrial Metallic Piping GB502352022.? 《工業(yè)設備及管道絕熱工程施工規(guī)范》 (GB501262022)Code for construction of industrial equipment and pipeline insulation engineering GB5012620223. 健康、安全與環(huán)境 HEALTH, SAFETY amp。Lift plan will be prepared in accordance with Sec. in Safe Work Specification Manual. Lift operation should consider whether the standing position of cranes and transportation vehicles will impact traffic safety based on site condition.? 動火作業(yè)點設監(jiān)護人、配備消防器材、設置遮擋電焊弧光措施、周圍無易燃易爆物品。Warning sign, tag board will be set up at work area。Any transportation vehicle entering or exiting construction location should have vehicle guardian, especially when backing or unloading.? 確保在實施前所有的相關活動和方案都已獲批準,否則應立即停止。急救箱內包含的內容應符合川東北項目要求。并且按照所有人員在進場施工前都必須經過入場訓且合格。材料報審合格后才能使用。Check HIC and SSC reports of pipe fitting of each heat number, and check heat treatment report of each pipe fitting.管件外觀和幾何形狀尺寸檢查按照不同廠家到貨數量的 10%進行抽查,且不得少于 3 件,若有不合格,應全部檢查。All open ends shall be blanked properly using plastic endcaps, plastic sheets or plywood covers to prevent entry of foreign material and damage to bevel ends, threads and flange faces during transporation and storage.? 所有管道預制件都應標注所屬裝置及管道編號。Onepiece mechanical processor (one time of forming for cut off and bevel)and pipe cutting machine will be applied for mechanical cutting.C 切割后的管段,對沒有標識的,應對應原管段標識進行移植。磨工應佩戴面罩和手套等附加 PPE。Limited pipe prefabrication will be performed by Constractor in temporary fabrication facilities on construction site。After acceptance, acceptance inspection record should be done for equipment and piping ponent. 所有設備、材料、管道組成件等進場物資首先進行外觀質量、規(guī)格參數檢查、做好標識,