【正文】
cked with a 6 mm thick steel plate surface. Of the project in the device template in detail to take appropriate technical measures, such as installing expansion joints, and take measures to ensure that the wall section size. The set of joints: the project expansion joint width of 30 cm long. 4 1TI, polystyrene boardreplacement templates, the totaling polystyrene board 235 1TI. Management to solve the problem of the maneuver, taken through the wall bolt convergencescrew are threaded on both sides, prewelded on the screw gasket, and then the gasketwelding on the expansion joints at the device template longitudinal ribs and fixed,until afterthe hoisting of the wall inside and outside the template, and then screw from the side to wear and reinforcement. Form removal, loose side of the nut, the rotation demolition of a screw, both lunch and effort. To ensure that the measures taken by the section size of the wall: spot 12 mm in the darkcolumn stirrups on the wall or on the degree of reinforcement steel bar, steel bar length than the wall thickness of 2 mm, arranged that way for: vertical roots from the air 15~ 20 cm (ie,the first stirrup at), at the top in the top of a stirrup at the direction of each template extentsimply welding 3 only at both ends and middle parts). In this way, had been strengthened toensure that the shear wall geometry. Archival material to collect and collate the material collected from the following aspects: Familiar with the material, organize the directory. Please fill out carefully and plete content. Collect timely and accurate, with any necessary written notice. To ensure that materials to be local control represent the bulk and use of the site and fill out the correct. To establish a good material to collect accounting, easy to find and use. Materials served to owners and supervision units, upon request, to withstand the receipt, in case after the other party not recognized. In the finishing process of the material, if there is no corresponding form of rules, there should be appropriate the materials of this project. As the key elements of the onsite technical management of construction enterprises, theconstruction site of a visa to a corresponding manner, methods and techniques. Based on past experience and the status of the construction market, onsite visa should payattention to the following aspects: Be familiar with and control of the project contract, standard, fixed, and construction drawings. Before the visa, the first after the calculation of the cost, ready to practice visa cost dollarsto take. Fixed in the corresponding subpurpose local, signed a set package price, and to preventfuture trouble for the future pletion of settlement. Large amount when the visa, or touch on the cost to adjust the larger visa, to bedismembered, elegant artistry signed. Management of nonstandard units of the establishment of refusing to sign and acknowledge the situation, establish the service of documents accounting and frank way tothink of ways to deal with. As the construction site of the te