【正文】
m,因此長(zhǎng)細(xì)比l=lh=,查表437A,j=,i風(fēng)荷載產(chǎn)生的水平力設(shè)計(jì)值:Hw =wkAW== NH =Hw+= += KN≤jAfc=102210= KN 連墻桿穩(wěn)定荷載能力夠。19,繩芯Ⅰ型鋼絲繩,查手冊(cè)表142選φ14,F(xiàn)g ——鋼絲繩鋼絲破斷拉力總和, φ14鋼絲繩公稱抗拉強(qiáng)度1400 N/mm2為125 KN。Xxxx工程外墻腳手架施工方案吊環(huán)拉結(jié)筋鋼絲繩十一、腳手架搭設(shè)示意圖腳手架墊板厚砼墊層排水溝夯實(shí)地基附圖一 腳手架基礎(chǔ)Xxxx工程外墻腳手架施工方案剪刀撐滿掛阻燃密目式安全網(wǎng)拉結(jié)筋短鋼管排柵立桿20045176。副組長(zhǎng):項(xiàng)目部技術(shù)負(fù)責(zé)人李英強(qiáng),負(fù)責(zé)腳手架工程的施工方案技術(shù)交底,進(jìn)行過程監(jiān)督,按規(guī)范標(biāo)準(zhǔn)組織驗(yàn)收。木腳手板應(yīng)采用杉木或松木制作,其材質(zhì)應(yīng)符合國家現(xiàn)行標(biāo)準(zhǔn)。根據(jù)搭設(shè)空間,選用適宜的腳手架鋼管長(zhǎng)度。 the scaffold build, it shall be harmonize the vertically and horizontally vertically pipe shall be fix the base with the rightangle fastener and less than horizontally pipe shall be fix under the vertically pipe tightly with the rightangle the vertical base is not on the same plane, it shall be extend from highness to lowness, and the gap shall be less than the vertical join each other, it must be use the butt joint fastener, but the 、縱向水平桿的構(gòu)造要求:Longitudinal horizontal bracing縱向水平桿宜設(shè)置在立桿內(nèi)側(cè),其長(zhǎng)度不宜小于3跨。當(dāng)腳手板的長(zhǎng)度小于2m時(shí),可采用兩根橫向水平桿支承,但應(yīng)將腳手板兩端與其可靠固定,嚴(yán)防傾翻。to the Xbracing distance shall be less than distance of Xbracing shall be use the lap 、扣件:Fastener扣件規(guī)格必須與鋼管外徑相同。拆除作業(yè)應(yīng)由上而下逐層進(jìn)行,嚴(yán)禁上下同時(shí)作業(yè)。搭拆腳手架時(shí),地面應(yīng)設(shè)圍欄和警戒標(biāo)志,并派專人看守,嚴(yán)禁非操作人員入內(nèi)。①新扣件具有生產(chǎn)許可證,法定檢測(cè)單位的測(cè)試報(bào)告和產(chǎn)品質(zhì)量合格證。腳手架底面標(biāo)高高于自然地坪50mm立桿基礎(chǔ)外側(cè)設(shè)置截面20cm20cm的排水溝??v向水平桿接長(zhǎng)采用對(duì)接扣件連接,交錯(cuò)布置,兩根相鄰縱向水平接頭設(shè)置相互錯(cuò)開不小于500mm,各接頭中心至最近主節(jié)點(diǎn)的距離不大于縱距的1/3。六、立桿每根立桿垂直穩(wěn)放在墊板上。立桿接長(zhǎng)除頂層步可采用搭接外,其余各層各步接頭必須用①、對(duì)接扣件連接。八、剪刀撐、安全網(wǎng)1、每道剪刀撐跨越立桿的根數(shù)6根(小于9m)。2、人行斜道寬度不宜小于1m,坡度宜采用1:3。十一、腳手架搭設(shè)質(zhì)量和安全要求腳手架的搭設(shè)應(yīng)將質(zhì)量要求和安全要求有機(jī)地統(tǒng)一起來,確保搭設(shè)過程以及以后的使用和拆除過程的安全與適用。5、架子工應(yīng)持有效的特種作業(yè)人員操作證上崗作業(yè)。雨、雪后上架作業(yè)應(yīng)注意防滑,并采取防滑措施。3、長(zhǎng)立桿、斜桿的拆除應(yīng)由二人配合進(jìn)行,不宜單獨(dú)作業(yè),下班時(shí)應(yīng)檢查是否牢固,必要時(shí)應(yīng)加設(shè)臨時(shí)固定支撐,防止意外。地下一層,地上十一層帶躍層,使用功能:住宅樓,由A區(qū),B區(qū),C區(qū)三個(gè)單體組成。在無剪力墻處,澆注頂板砼前滿鋪腳手板進(jìn)行防護(hù),澆注完拆除梁摸后,應(yīng)重新鋪板固定加以保護(hù)。10㎝。剪刀撐斜桿應(yīng)用旋轉(zhuǎn)扣件固定在與之相交的橫向水平桿的伸出端或立柱上,旋轉(zhuǎn)扣件中心線距端點(diǎn)的距離不應(yīng)大于15㎝,剪力撐接長(zhǎng)采用搭接接長(zhǎng),搭接長(zhǎng)度不小于100㎝,用3個(gè)扣件等距離布置,扣件扣在鋼管端頭處不小于10㎝,剪刀撐下端一定要落地。十二、腳手架的卸料平臺(tái)卸料平臺(tái)上面掛牌標(biāo)明控制荷載,要有荷載計(jì)算書,要有專門搭設(shè)方案,要嚴(yán)格按照施工方案施工。適用于工程中各方主體的相關(guān)人員使用,如工程資料員、監(jiān)理工程師以及工程文件整理、歸檔單位的工程竣工資料管理人員等。龐大的素材庫包含工業(yè)、民用、水電、路橋的綜合施工組織總設(shè)計(jì),以及各類結(jié)構(gòu)形式、各種高度的工業(yè)、民用、路橋、水電等單位工程的施工組織設(shè)計(jì),還提供了特種工程、建筑、安裝、乃至鋼結(jié)構(gòu)的施工組織設(shè)計(jì),幾乎囊括了編標(biāo)所需的所有內(nèi)容。任何購買過施工組織設(shè)計(jì)大全的用戶購買以上我公司任一款軟件均按8折優(yōu)惠!杭州嘉意德科技有限公司電話:057188980586*** 網(wǎng)址:。標(biāo)書制作與管理軟件:是一個(gè)集標(biāo)書制作與標(biāo)書管理功能于一身的招投標(biāo)軟件,用于快速編制各類標(biāo)書和施工組織設(shè)計(jì)。說明施工組織設(shè)計(jì)大全,全套5張光盤,由杭州嘉意德科技有限公司整理銷售。⒉兜網(wǎng)封閉用大眼安全網(wǎng)(平網(wǎng))將腳手架與建筑物之間封閉起來,每隔10米一道。安全網(wǎng)鋼絲繩斜桿橫桿鋼絲繩圖13層間網(wǎng)支搭示意圖 ⑵布置要求連墻桿在垂直間距不應(yīng)大于4米,水平間距不大于6米的位置上設(shè)置,設(shè)置時(shí)易靠近立節(jié)點(diǎn),距離不應(yīng)大于30㎝,必須從底部第一根縱向水平桿處開始設(shè)置,布設(shè)形式可以采用花排,也可采用并排,宜優(yōu)先采用花排,門窗洞口采用短向拉結(jié)鋼管長(zhǎng)度過門窗洞口邊緣250㎜以上。⒋構(gòu)造要求⑴立桿的間距、垂直度,允許搭設(shè)偏差177。拆摸后用鋼管穿過兩預(yù)留孔,上面滿鋪5cm厚腳手板。第五篇:腳手架搭設(shè)施工方案110腳手架搭設(shè)施工方案一、編制依據(jù):建筑施工安全施工標(biāo)準(zhǔn)JGJ59—99,建筑施工高處作業(yè)安全技術(shù)規(guī)范JGJ80—91,密目式安全網(wǎng)GB16909—1997,河北省建筑工程施工安全管理培訓(xùn)教材《高處作業(yè)腳手架》,》《建筑施工手冊(cè)(第二版)》,工程設(shè)計(jì)圖紙,《施工組織設(shè)計(jì)》。十二、拆除方案1、外架拆除前應(yīng)由單位工程負(fù)責(zé)人召集有關(guān)人員對(duì)架子工程進(jìn)行全面檢查與簽證確認(rèn),建筑物施工完畢,且不需要使用時(shí),腳手架方可拆除。大、小橫桿與立桿連接時(shí),也必須兩人配合。根據(jù)腳手架搭設(shè)高度、搭設(shè)場(chǎng)地土質(zhì)情況與現(xiàn)行國家標(biāo)準(zhǔn)(JBJ202)做好腳手架地基與基礎(chǔ)的施工要求,堅(jiān)實(shí)平整,不積水,砼硬化。2、用16mm2黃綠雙色銅芯線作引下線,途中用磁瓶,導(dǎo)線綁扎。7、腳手架外側(cè)必須用建設(shè)主管部門認(rèn)證的合格的密目式安全網(wǎng)封閉,且應(yīng)將安全網(wǎng)固定在腳手架外立桿里側(cè),應(yīng)用18#鉛絲張持嚴(yán)密。③宜優(yōu)先采用菱形布置,也可采用方形,矩形布置??窟吰律戏降牧U軸線到邊坡的距離不小于500mm。腳手片底層滿鋪,中間每隔三層,操作層的上下層頂層都必須滿鋪。連墻桿件設(shè)置為豎向每層、水平向?yàn)樗目纭C苣渴桨踩W(wǎng)必須有建設(shè)主管部門認(rèn)證的產(chǎn)品。鋼管上嚴(yán)禁打孔,鋼管在便用前先涂刷防銹漆。安全網(wǎng)應(yīng)按有關(guān)規(guī)定搭設(shè)和拆除。 scaffold must be check and use the scaffold, it must to it has abnormity, it must to must check the means of safety termly, and must be up to the mustard.(四)腳手架的拆除:Demolition the scaffold應(yīng)根據(jù)現(xiàn)場(chǎng)情況及業(yè)主要求,及時(shí)進(jìn)行腳手架的拆除工作。剪刀撐斜桿的接長(zhǎng)宜采用搭接。 central node must be set one transverse horizontal bracing and forbid two rightangle fastener of the central node shall be less than 150mm each transverse horizontal bracing of the other node on the operating lay which is not the central, shall be set base on needs, and the max distance shall be less than 1/2 of the 、腳手板的設(shè)置:Scaffold board laying作業(yè)層的腳手板應(yīng)鋪滿、鋪穩(wěn)。當(dāng)立桿基礎(chǔ)不在同一高度上時(shí),必須較高處的縱向桿向低處延長(zhǎng),與立桿固定,高低差不應(yīng)大于1m。當(dāng)腳手架基礎(chǔ)下有設(shè)備基礎(chǔ)、管溝時(shí),必須采取加固措施。腳手架采用的扣件,其材質(zhì)應(yīng)符合國家現(xiàn)行標(biāo)準(zhǔn)。文明施工目標(biāo):做到工完料盡場(chǎng)地清,達(dá)到“省級(jí)文明工地”的驗(yàn)收標(biāo)準(zhǔn)。㎜2 = KN所以,安全。+180。QP=(+)15= 腳手架的防護(hù)材料產(chǎn)生軸心壓力,查表440得: NQ2K`=,安全網(wǎng)自重:50= 則NQ2K=+= KN 根據(jù)裝修用途腳手架,兩層同時(shí)操作,施工均布荷載Qk=2=,查表4—41得施工荷載產(chǎn)生軸心壓力: NQ3k=根據(jù)公式(4—32),荷載產(chǎn)生軸心壓力標(biāo)準(zhǔn)值為229。(1)sw計(jì)算驗(yàn)算部位應(yīng)根據(jù)風(fēng)荷載產(chǎn)生彎曲壓應(yīng)力大小分析確定,故先計(jì)算風(fēng)荷載產(chǎn)生壓應(yīng)力sw Xxxx工程外墻腳手架施工方案立網(wǎng)封閉的擋風(fēng)系數(shù)及風(fēng)荷體型系數(shù)參照《建筑結(jié)構(gòu)荷載規(guī)范》近似按以下方法計(jì)算:x=(+)180。⑽、加強(qiáng)管理人員和施工人員的教育,提高自我保護(hù)意識(shí)和素質(zhì)。⑶、不按質(zhì)量要求搭設(shè),立桿偏斜,拉結(jié)點(diǎn)松弛,起不到有效拉結(jié)作用。Xxxx工程外墻腳手架施工方案對(duì)腳手架實(shí)際使用荷載進(jìn)行控制,包括腳手架上施工人數(shù)、材料堆放數(shù)量和位置以及多層同時(shí)作業(yè)時(shí)的控制。每班工人上架作業(yè)時(shí),應(yīng)先行檢查有無影響安全作業(yè)的問題存在,在排除和解決后方可開始作業(yè)。不準(zhǔn)在架板上堆放標(biāo)準(zhǔn)磚、砂漿和容器、施工設(shè)備等。⑵、所有連墻桿件應(yīng)隨腳手架逐層拆除,嚴(yán)禁先將連墻桿件整層或數(shù) Xxxx工程外墻腳手架施工方案層拆除后再拆除腳手架,分段拆除高差不應(yīng)大于2步,如高差大于2步,應(yīng)增設(shè)連墻件加固。安全網(wǎng)需經(jīng)檢驗(yàn)合格后方能用于本工程。隨時(shí)校正桿件的水平偏差和垂直偏差,保證腳手架質(zhì)量和整齊。五、一般規(guī)定在搭設(shè)之前,必須對(duì)進(jìn)場(chǎng)的腳手架桿配件進(jìn)行嚴(yán)格的檢查,禁止使用規(guī)格和質(zhì)量不合格的桿配件。1欄桿、腳手板欄桿和擋腳板應(yīng)搭設(shè)在外排立柱的內(nèi)側(cè),居中設(shè)置,擋腳板高度不應(yīng)小于180mm。安全擋板安全擋板設(shè)置在腳手架外側(cè),用鋼管由內(nèi)立柱到外立柱向外飄出2米,呈250角,面上鋪扎密篙竹加鋪安全網(wǎng),第一層搭設(shè)高度約15米,以上每15米搭設(shè)一層。剪刀撐應(yīng)沿架高連續(xù)布置。橋架的搭設(shè),中間用鋼管設(shè)水平桿一道,橋架排距寬度為70cm,內(nèi)立竿距墻面20cm,橋架兩邊大橫桿用鋼管,中間鋪設(shè)竹排。200179。第一篇:腳手架搭設(shè)施工方案Xxxx工程外墻腳手架施工方案目錄一、工程概況.......................................................................1二、腳手架的搭設(shè)方案.......................................................1三、腳手架搭設(shè)要點(diǎn)...........................................................4四、桿件搭設(shè)順序...............................................................5 五、一般規(guī)定.......................................................................5六、腳手架拆除...................................................................6七、腳手架的使用規(guī)定.......................................................7八、安全要求.......................................................................8九、文明施工及成品保護(hù).................................................10十、計(jì)算書.....................