【正文】
發(fā)出的命令,并進(jìn)行相應(yīng)的參數(shù)設(shè)置或控制。接受監(jiān)控系統(tǒng)查詢,向系統(tǒng)傳送事件報(bào)告,向系統(tǒng)傳送自檢報(bào)告,修改時(shí)鐘及與監(jiān)控系統(tǒng)對(duì)時(shí),修改保護(hù)定值,接受監(jiān)控系統(tǒng)投退命令,接受監(jiān)控系統(tǒng)查詢定植并送出定植。 3) 微機(jī)保護(hù)由于具有自動(dòng)檢測(cè)和自診斷能力,能自動(dòng)檢測(cè)處硬件的故障和對(duì)輸入數(shù)據(jù)進(jìn)行校錯(cuò),使檢測(cè)監(jiān)視變得容易,從而使保護(hù)可靠性大大提高。 微機(jī)保護(hù)的硬件 系統(tǒng)包括以下三部分: 1) 數(shù)據(jù)采集系統(tǒng)(或稱模擬量輸入系統(tǒng)):包括電壓形成、采樣保持、多路開(kāi)關(guān)及數(shù)模轉(zhuǎn)換。 整定計(jì)算 躲外部短路可能產(chǎn)生的最大不平衡電流 大學(xué)畢業(yè)論文 13 dz k bp m a x 6I K I A? ? ? 電流互感器二次回路開(kāi)路時(shí)不誤動(dòng) d z k f m a x3 .9 2I K I A? ? ? 取較大者為整定值。 本設(shè)計(jì)課題中 10kv 母線承擔(dān)著為潘北礦所有用電設(shè) 備分配傳輸電能的作用,在整個(gè)礦的安全生產(chǎn)、生活中起著至關(guān)重要的作用。 1)動(dòng)穩(wěn)定校驗(yàn) iNK ? (3)ish = 滿足動(dòng)穩(wěn)定要求。 10kv 母線選型與校驗(yàn) 因?yàn)?10kv 出線有一級(jí)負(fù)荷,供電可靠性要求較高,同時(shí)負(fù)荷采用雙回線供電,所以為 了 滿足供電的可靠性和靈活性,選擇 單母線分段 的 接線形式。(3)I (低壓系統(tǒng) ) ( 8) 三項(xiàng)短路容量: (3)S = dS / *X? ( 9) (2)I = (3)I , (2)Ish = (3)ish , (2)Ish = (3)Ish 各母線短路電流列表 根據(jù)下圖和以上公式計(jì)算母線短路電流: 表 32 母線 三相 短路電流列表 短路計(jì)算點(diǎn) 三相短路電流 /KA 三相短路容量 /MVA (3)I 39。 短路電流 計(jì)算 短路電流的計(jì)算目的 為了保證電力系統(tǒng)安全運(yùn)行,擇電氣設(shè)備時(shí),要用 流過(guò)該 設(shè)備的最大短路電流進(jìn)行熱穩(wěn)定校驗(yàn)和動(dòng)穩(wěn)定校驗(yàn),以保證 電氣 設(shè)備在運(yùn)行中能夠經(jīng)受住突發(fā)短路引起的發(fā)熱和電 動(dòng)力的巨大沖擊。 為了方便供電線路的檢修 和 兩根 配電 線的切換 以保證供電的安全, 110kv 高壓 配電線采用外橋接線方式 向變電所供電。 大學(xué)畢業(yè)論文 4 表21 潘北礦變電所原負(fù)荷表 使用容量 Sj (kva) 4222.2 5850 2473.3 1833.3 1600 1866.6 8533.3 6857.1 33235.9 Qj (kvar) 1824 4668.3 1068.5 792 1056 1232 5632 4896 17447.8 Pj (kw) 3800 3510 2226 1650 1200 1400 6400 4800 24986 tanΦ 0.48 0.48 CosΦ 0.9 0.9 需用系數(shù) (Ox) 設(shè)備容量 工作容量 (KVA) 4000 3900 3000 2200 1600 2021 8000 6000 總?cè)萘?(KVA) 4000 3900 6000 2750 3200 2021 總臺(tái)數(shù) /工作 臺(tái)數(shù) 1/1 2/2 2/1 5/4 4/2 高壓電動(dòng)機(jī) 額定容量 (KVA) 4000 1700/2200 3000 550 800 型式 同步 直流 同步 同步 異步 電壓 (KV) 10 10 10 10 10 10 10 設(shè)備負(fù) 荷名稱 主井提升機(jī) 副井提升機(jī) 通風(fēng)機(jī) 壓風(fēng)機(jī) 瓦斯泵 制冷降溫系統(tǒng) 地面低壓負(fù)荷 井下高壓負(fù)荷 變電所總計(jì) 順 序 1 2 3 4 5 6 7 8 9 大學(xué)畢業(yè)論文 5 根據(jù)公式: Pj= OxPe Qj= PjtanΦ Sj= Pj/ CosΦ 其中 Pj、 Qj、 Sj 分別為該用電設(shè)備組的有功、無(wú)功和視在功率; Pe—— 該用電設(shè)備組的設(shè)備容量總和 (KW); Ox—— 需用 系數(shù); tanΦ—— 與運(yùn)行功率因數(shù)角相對(duì)應(yīng)的正切角; 分別計(jì)算出各 設(shè)備 的有功和無(wú)功功率及視在功 率的計(jì)算值填入表 21。 設(shè)計(jì)依據(jù) 負(fù)荷分析 : 一級(jí)負(fù)荷:中斷供電將造成人身傷亡或重大設(shè)計(jì)損壞,且難以挽回,帶來(lái)極大的政治、經(jīng)濟(jì)損失者屬于一級(jí)負(fù)荷。在二次側(cè)我們采用了繼電保護(hù)和微機(jī)保護(hù)兩種方式。改進(jìn)供電質(zhì)量,力求供電最為安全、可靠、方便、靈活,經(jīng)濟(jì)性好,變配電管理更為有效,從而改善供電質(zhì)量,提高服務(wù)水平,減少運(yùn)行費(fèi)用 ??梢?jiàn),變電站的設(shè)計(jì)是工業(yè)效率提高及國(guó)民經(jīng)濟(jì)發(fā)展的必然條件。將壓變電站通常遠(yuǎn)離發(fā)電廠而靠近負(fù)荷中心。若變電站系統(tǒng)中某一環(huán)節(jié)發(fā)生故障,系統(tǒng)保護(hù)環(huán)節(jié)將動(dòng)作。 本設(shè)計(jì) 首先根據(jù)任務(wù)書(shū)上所給系統(tǒng)與線路及所有負(fù)荷的參數(shù),分析負(fù)荷發(fā)展趨勢(shì)。 關(guān)鍵詞:電力系統(tǒng),短路電流,繼電保護(hù) 大學(xué)畢業(yè)論文 II DESIGN OF RELAY PROTECTION SYSTEM OF 10KV QENERATRIX STATION ABSTRACT Substation is an important part of the power system, which directly affect the entire power system security and economic operation of power plants and users to link the middle part, play a role in transformation and distribution of electricity. Main Electrical wiring is a major part of power plant substation, electrical main wiring a direct bearing on the formulation of the plant (the) selection of electrical equipment, power distribution equipment layout, relay protection and automatic device established that it is part of the electrical substation investment in the size of the decisive factor. The design of the first book based on the task to the system and all load and line parameters, analysis of load trends. From the load growth illustrates the need for Jian Zhan, and then to the summary of the proposed substation and the outlet direction of consideration and analysis of information through the load, security, economic and reliability considerations, determine the 110kV, 10kV and the station main electricity cable, and then through the load calculation to determine the scope and power of the main transformer station number, size and model, but also identified the 110kV overhead lines, 10kV bus, highvoltage isolation switch, high voltage switchboard, reactive power pensation devices, electrical Main Equipment Selection and validation. Finally, based on the maximum continuous operating current and shortcircuit calculation results, and make 10kv bus relay protection design and setting and achieving puter monitor. KEYWORDS: power system, shortcircuit current, relay protection 大學(xué)畢業(yè)論文 i 目錄 摘要 ............................................................................................................................................. I ABSTRACT .............................................................................................................................. II 緒論 ...................................................................................................................................... 1 概述 ............................................................................................................................... 1 選題意義 ....................................................................................................................... 1 國(guó)內(nèi)外發(fā)展 10KV供電概況 ...................................................................................... 1 課題擬采用的方案和技術(shù)路線 .................................................................................. 2 設(shè)計(jì)任務(wù)及原始資料 .......................................................................................................... 3 設(shè)計(jì)任務(wù) ....................................................................................................................... 3 原始資料 ....................................................................................................................... 3 ................................................................................................................... 3