【正文】
ite, to ensure the project quality plying with the standard and requirement of design (4)、負責設計變更審批,對每一項設計變更均記錄簽字,并組織設計師及時進行修改、出圖并存檔。To submit the technical quality content from contract signed by supplier prior to evaluate by technical group.(3) 優(yōu)先選用質量、信義良好的合格分供方。Responsible for piling method statement for subunit engineering, method statement for seasonal work.(2).負責技術管理工作,施工圖紙管理,辦理施工圖紙技術洽商,保證工程嚴格按照圖紙和有關技術規(guī)范實施。協(xié)助技術人員工作,確保施工達到設計標準要求。Responsible for establishing and maintaining quality assurance and quality control plans and quality management system of the construction site, and he will report directly to the Chief Engineer. And he is also responsible for effective coordination among the client, independent laboratory and consultant(2)質量工程師必須熟悉圖紙及相關規(guī)范、標準等。Ensure that all quality requirements can be understand by site staffs.(8)對交付到現(xiàn)場的材料進行檢驗,確保符合合同要求和技術標準規(guī)范,推薦其放在適當?shù)牡攸c貯存。To cooperate with the technology department, responsible for review the materials required for the project.(3)根據(jù)施工進度計劃編制材料計劃,負責物資的加工、采購工作,保證建筑物資符合相應的技術標準和規(guī)范的規(guī)定,對建筑物資的質量負責。Have a daily technical quality disclosure to group leaders.(6)保證現(xiàn)場所有的工作都是按照審批的圖紙和施工方案在執(zhí)行。 windows, inspection and acceptance for interior floor, ground, decoration, inspection and acceptance for ceiling, inspection and acceptance for wall plaster, inspection and acceptance for painting, inspection and acceptance for stair balustrades, inspection and acceptance for curtain wall, inspection and acceptance for roofing, inspection and acceptance for unit construction.2.鋼結構檢查驗收計劃:原材料檢驗、過程加工質量檢驗、焊接質量檢驗、涂裝質量檢驗、預裝質量檢驗、鋼結構安裝質量檢驗。 wire ,cable protective pipe and cable trunking laying, cable terminal fabrication、wire connection and electric test, mon lighting fixture installation. special lighting installation,socket、switch、fan installation,Building lighting electricity missioning, spare and uninterruptable power output installation, diesel motor installation , uninterruptable power output anxiliarys installation, bare busbar, enclosed busbar, plugin busbar。B/ I: M(4)、凈化空調系統(tǒng):風管與配件制作;部件制作;風管系統(tǒng)安裝;空氣處理設備安裝;消聲設備制作與安裝;風管與設備防腐;風機安裝;風管與設備絕熱;高效過濾器安裝;系統(tǒng)調試房產論壇,裝修論壇,業(yè)主論壇, i w1 ^ Y(5)、制冷系統(tǒng):制冷機組安裝;制冷劑管道及配件安裝;制冷附屬設備安裝;管道及設備的防腐與絕熱;系統(tǒng)調試空調水系統(tǒng):管道冷熱(媒)水系統(tǒng)安裝;冷卻水系統(tǒng)安裝;冷凝水系統(tǒng)安裝;閥門及部件安裝;冷卻塔安裝;水泵及附屬設備安裝;管道與設備的防腐與絕熱;系統(tǒng)調試。 L5 c z% b! q新浪樂居論壇4 u6 T R4.Building electrical engineering acceptance inspection plan:Concealed work inspection item :power house roof lighting system concealed pipe welding and earthing connection, Smoke temperature detector module and alarm concealed pipe ,roof lightning arrester welding, terminal building lighting conduction welding safety ground electric control room :transformer and box substation installation。Classify and store all kinds of materials as required. Keep the storage when should be and others should be stacked neatly and wellmarked according to the site layout plan. Guarantee the onsite materials not to deteriorate. 五、施工檢查驗收計劃: Inspection and acceptance plan during construction1.土建部份檢驗計劃包括:土建原材料檢驗、基礎驗槽、鋼筋隱檢、模板預檢、混凝土外觀檢驗、基礎結構驗收、回填土檢驗、地上結構驗收、砌筑工程驗收、輕質隔墻驗收、抹灰工程驗收、裱糊分項驗收、室內防水驗收、屋面防水驗收、門窗工程驗收、室內樓地面驗收、吊頂驗收、 墻面抹灰驗收、油漆涂料驗收、樓梯欄桿及扶手驗收、幕墻驗收、屋面工程驗收、單位工程驗收。Cooperate with the person in charge of technical to solve any problems in drawing.(4)對本專業(yè)的施工質量負責。Get the supplier39。Guarantee promote working of quality planning, based on quality planning audit the project whether to defer to the process request to carry out the corresponding activity, whether to defer to the process request to produce the corresponding production, and audit the rationality to the work achievement39。To plete other works arranged by leaders:The responsibility for professional quality engineers(1)負責建立并維護施工現(xiàn)場的質量保證和質量控制計劃及質量管理體系,他將直接向總工進行匯報。To organize the meeting for technical coordination, participate in the related meeting organized by client and consultant. 各專業(yè)設計人員質量職責The quality responsibility of the professional designers(1)、參加圖紙會審,同時向施工單位和監(jiān)理單位進行技術交底。Responsible for the handing over and back visiting amp。To coordinate the technical problem between site construction and consultant engineer. Commercial group商務部門質量職責:Quality responsibility for mercial group(1) 配合技術部門對供貨商提供的產品和服務質量進行評審。 To full hold the information of the site jobs, starting work in according with the indication by pany leader. (2)、組織設計評審,合理計劃項目開展工作,及時完成施工圖繪制。 join the validation of materials entering . Quality Responsibilities: (1). Responsible for pleting the project quality planning, quality inspection and supervision 。質量職責:(1).負責完成項目質量策劃、質量檢查和監(jiān)督工作,對重點部位及工序實施全過程跟蹤檢查;(2).負責工程質量報驗工作;(3).負責檢驗批分項工程質量評定,并對評定等級或結果負責,參加質量驗收;(4).參加隱檢和預檢,嚴把質量關;(5).參加樣板工程和新技術鑒定;(6).參加質量例會或質量分析會,研究質量狀況及存在問題,并提出有效的預防措施;(7).對各專業(yè)組進行質量意識教育和過程監(jiān)控。主持制定項目的質量計劃,明確項目經(jīng)理部各部門及主要人員的質量職責; To manage the project quality system. In charge of formulating the project quality program, to clear assign the quality responsibility for all departments and key person.⑷. 組織編制施工組織設計、項目質量管理辦法等項目技術質量管理文件; To organize piling of the technical management documents, the documents including construction method statement and project quality management method etc.⑸. 嚴格執(zhí)行各項工程質量檢驗、驗收制度,督促、檢查工長和質量師做好施工質量檢查和評定,強化自檢、交接檢和專職檢查工作,確保完成合同質量目標; To strict perform all rules for inspection and quality specification, to supervise and inspect the foreman and quality auditor to plete the quality inspection and evaluation, strengthening the work in selfinspection and hand over inspection and profession inspection, to ensure the pletion of contract quality target.⑹. 組織重大質量分析會; To organize the meeting for analyzing the course of the serious quality problem.⑺. 組織質量事故處理方案的具體實施;To organize actually implementation according to the method treatment for quality accidence.(8). 組織工程交付,對工程承包全過程的成品保護負全部責任;To organize handing over the project, full responsibility to all product protection for finished project from beginning to end.(9). 按企業(yè)規(guī)定的權限,組織確定物資分供方,并對分