freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

fidic課程設(shè)計(jì)word版(存儲(chǔ)版)

2025-07-17 14:19上一頁面

下一頁面
  

【正文】 this SubClause The Performance Security of a joint venture or consortium shall specify the name of the joint venture or consortium. Contractor39。s Documents shall be in accordance with the Specification and Drawings, shall be written in the language for munications defined in SubClause [Law and Language], and shall include additional information required by the Engineer to add to the, Drawings for coordination of each Party39。s Documents for this part in accordance with the procedures specified in the Contract。s endorsement of any invoices and certificates will include specific confirmation that pliance with the Safety Methodology is achieved‖ 14 New SubClause Management Meetings Insert new SubClause : The Engineer or the Contractor‘s Representative may require the other to attend a management meeting in order to review the arrangements for future work. Such meetings shall take place on a monthly basis. The Engineer shall record the business of management meetings and supply copies of the record to those attending the meeting and to the Employer, within two working days from the meeting. In the record, responsibilities for any actions to be taken shall be in accordance with the Contract. The agenda for such meetings shall cover a review of progress attained, a review of schedules and plants for future activities, the status of staffing, engineering, safety, equipment, material supply, payments, current and anticipated difficulties, interface with other Contractors, claims for extras, and other pertinent topics. Time and place of these meetings shall be mutually agreed taking into consideration the subject to be discussed. Clause 4 The Contractor SubClause Contractor39。s Duties and The Employer shall appoint the Engineer who shall carry out the duties assigned to Authority him in the Contract. The Engineer39。s Documents (if any), the Drawings and Variations and other munications given under the Contract. The Employer39。s General Obligations Cooperation Safety Procedures Quality Assurance Site Data Unforeseeable Physical Conditions Avoidance of the Interference Access Route Contractor‘s Equipment Employer‘s equipment and freeissue material Progress Report Fossils security of the site Fossils Works Diar CONSTRUCTION LOGBOOKS Operation and maintenance manuals 3 5. NOMINATED CONTRACTORS15 6. STAFF AND LABOUR16 Engagement of Staff and Labour Persons in the Service of Employer Health and safety Contractor39。 Clause [Determinations] to agree or determine these matters. However, if and to the extent that the Engineer39。s approval is required, then (for the purposes of the Contract) the Employer shall be deemed to have given approval. Except as otherwise stated in these Conditions: whenever carrying out duties or exercising authority, specified in or implied by the Contract, the Engineer shall be deemed to act for the Employer。s General The Contractor shall design (to the extent specified in the Contract), execute and plete the Works in accordance with the Contract and with the Engineer39。s designs。s Documents, Temporary Works, and such design of each item of Plant and Materials as is required for the item to be in accordance with the Contract, and (ii) shall not otherwise be responsible for the design or specification of the Permanent Works. The Contractor shall, whenever required by the Engineer, submit details of the arrangements and methods which the Contractor proposes to adopt for the execution of the Works. No significant alteration to these arrangements and methods shall be made without this having previously been notified to the Engineer. If the Contract specifies that the Contractor shall design any part of the Permanent Works, then unless otherwise stated in the Particular Conditions: If the Contract specifies that the Contractor shall design any part of the Permanent Works, then unless otherwise stated in the Particular Conditions: (a) the Contractor shall submit to the Engineer the Contractor39。s pliance with the provisions of the Contract and of the proposed and approved Safety Methodology, and he shall ensure certification of pliance. The Engineer39。 (alternatively, this obligation could be limited to major SubContractors, that is those providing more than x% of the Accepted Contract Amount – see SubClause [Subcontractors]) b) SubClause and/or SubClause : Specific approval of the Employer is required before instructing or approving any extension of the Time for Completion Page 3 of 18 c) SubClause : Specific approval of the Employer is required before instructing or approving the omission of any work d) SubClause [Subcontractors]: giving consent to a Subcontractor for works that should have been carried out by a different Subcontractor named in the Contract e) Other cases, provided that the Contractor has been informed in this respect and in writing by the Employer with 30 days notice prior to the entering into force of such new case. Insert at the end of this SubClause : Notwithstanding the obligation, as set out above, to obtain approval, if, in the opinion of the Engineer, an emergency occurs affecting the safety of life or of the Works or of adjoining property, he may, without relieving the Contractor of any of his duties and responsibilities under the Contract, instruct the Contractor to execute all such work or to do all such things as may, in the opinion of the Engineer, be necessary to abate or reduce the risk. The Contractor shall forthwith ply wit
點(diǎn)擊復(fù)制文檔內(nèi)容
畢業(yè)設(shè)計(jì)相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1