【正文】
eliver the contracted goods under the tackle of the vessel nominated by the buyer on any date notified by the buyer, within the time of shipment as stipulated in clause 8 of this contract. 1015 days prior to the date of shipment, the buyer shall inform the seller by cable or telex of the contract number, name of vessel, eta of vessel, quantity to be loaded and the name of shipping agent, so as to enable the seller to contact the shipping agent direct and arrange the shipment of the goods. the seller shall advise by cable or telex in time the buyer of the result thereof. should, for certain reasons, it bee necessary for the buyer to replace the named vessel with another one, or should the named vessel arrive at the port of shipment earlier or later than the date of arrival as previously notified to the seller, the buyer or its shipping agent shall advise the seller to this effect in due time. the seller shall also keep in close contact with the agent or the buyer. should the seller fail to load the goods on board or to deliver the goods under the tackle of the vessel booked by the buyer. within the time as notified by the buyer, after its arrival at the port of shipment the seller shall be fully liable to the buyer and responsible for all losses and expenses such as dead freight, demurrage. consequential losses incurred upon and/or suffered by the buyer. should the vessel be withdrawn or replaced or delayed eventually or the cargo be shutout etc., and the seller be not informed in good time to stop delivery of the cargo, the calculation of the loss in storage expenses and insurance premium thus sustained at the loading port shall be based on the loading date notified by the agent to the seller ( or based on the date of the arrival of the cargo at the loading port in case the cargo should arrive there later than the notified loading date)。 claims: in case the quality, quantity or weight of the goods be found not in conformity with those as stipulated in this contract upon reinspection by the china modity import and export inspection bureau within 60 days after pletion of the discharge of the goods at the port of destination or, if goods are shipped in containers, 60 days after the opening of such containers, the buyer shall have the right to request the seller to take back the goods or lodge claims against the seller for pensation for losses upon the strength of the inspection certificate issued by the said bureau, with the exception of those claims for which the insurers or owners of the carrying vessel are liable, all expenses including but not limited to inspection fees, interest, losses arising from the return of the goods or claims shall be borne by the seller. in such a case, the buyer may, if so requested, send a sample of the goods in question to the seller, provided that sampling and sending of such sample is feasible. 「章名」 22 damages: with the exception of late delivery or nondelivery due to “force majeure” causes, if the seller fails to make delivery of the goods in accordance with the terms and conditions, jointly or severally, of this contract, the seller shall be liable to the buyer and indemnify the buyer for all losses, damages, including but not limited to, purchase price and/or purchase price differentials, deadfreight, demurrage, and all consequential direct or indirect losses. the buyer shall nevertheless have the right to cancel in part or in whole of the contract without prejudice to the buyer‘s right to claim pensations. 「章名」 23 force majeure: neither the seller or the buyer shall be held responsible for late delivery or nondelivery owing to generally recognized “force majeure”causes. however in such a case, the seller shall immediately advise by cable or telex the buyer of the accident and airmail to the buyer within 15 days after the accident, a certificate of the accident issued by the petent government authority or the chamber of merce which is located at the place