【正文】
E. Name of Contract Equipment and Item No.。 D. Description of the special precautions for the Contract Equipment that requires special storage and transportation. Another duplicate copy of the said documents shall be airmailed to the transportation agent appointed by the Buyer as the basis of arranging inland transportation, loading and unloading of the Contract Equipment. The Seller shall be responsible for booking the shipping space and may choose any shipping pany from the following list: ______________. In case the shipping pany listed above cannot provide the vessel to meet the shipping requirement under the Contract, the Seller shall charter a vessel from a shipping pany with good reputation. The chartered vessel shall not exceed fifteen (15) years of service with a good record of carrying goods and shall be of any flag or nationality acceptable to the governments of two parties39。s confirmation can the Seller arrange the production of such Equipment. The Buyer shall confirm it by writings within _____ days after having received the said sketch, otherwise the Seller can start the fabrication. Within _____ months after the Effective Date of the Contract, the Seller shall submit to the Buyer the final delivery schedule in six (6) copies, which shall include the following items: Contract No., name and type of Contract Equipment, item No., specification, quantity, name of dangerous and/or inflammable goods and their IMCO No.(as per International Maritime Dangerous Goods Code), the approximate total gross and volume, unit/total price, the dimension (length, width, height and volume), port of Shipment and expected loading date, as well as the overall packing sketch of oversize and/or overweight Contract Equipment If any Contract Equipment contains dangerous and/or inflammable items the Seller shall submit an English description in six (6) copies indicating the name, characteristic, special handling and protective measures in case of accidents in respect of such items. The Seller shall instruct the shipping pany to indicate in the Bill of Lading the case No./container For the Contract Equipment that requires special storage, the Seller shall present English description in six (6) copies stating special precautions in inland transportation and storage. Each piece of Contract Equipment shall be shipped in plete set whenever possible. The special tool for Erection, materials and easily wornout parts shall be dispatched along with the main equipment concerned. In case any Contract Equipment is agreed to be shipped on deck, the Seller shall take special protective measures. Not later than _____ days before the readiness for each shipment, the Seller shall notify the Buyer by fax of the following contents: A. Contract No.。 C. Two (2) copies of sight draft. Payment after the Expiration of the Warranty Period of the Contract Plant _____Percent (_____%) of the contract price as specified in Article , , and ,(say ____________________only) shall be paid by the Buyer to the Seller within _____days after the following documents have been received and found in order: A. One (1) copy of the Certificate certifying the expiration of the Warranty Period of the Contract Plant issued by the Buyer。 E. One (1) original and five (5) duplicate copies of exworks quality certificate issued by the manufacturer。 E. Two (2) copies of sight draft. Payment for license, design, Technical Training and Technical Documentation ____Percent (_____ %) of the price for license, design, Technical Training and Technical Documentation as specified in Article , and (say ____________________only) shall be paid by the Buyer to the Seller upon delivery of the basic design package by the Seller and within_____days after the following documents have been received and found in order: A. One (1) original and three (3) duplicate copies of the airway bill marked REIGHT PREPAIDor receipt of registered airmail for the delivery of basic design package。s Bank and the Seller39。s request, provide the Buyer with spare parts for normal operation of the Contract Plant at favorable prices within_____years after the Acceptance of the Contract Plant. A separate agreement will be signed between the two Parties at that time. Chapter 3 Price The total Contract Price for Contract Equipment, license of patent and/or knowhow, design, Technical Documentation, Technical Service and Technical Training to be rendered by the Seller under the contract _________(say: __________only). The breakdown price for the Contract Plant: Price for Contract Equipment: A. Price for equipment。s Bank CIF Model Contract for Importation of Complete Plant Contract . Date of Signature: _____________. Place of Signature:_____________. This Contract is made and entered into through friendly negotiation by and between China ____________________Corporation, a corporation anized and existing under the laws of the People39。s Technical Personnel Appendix 5 The Contents of Technical Training and the Treatment for the Buyer39。s Bank. Erection means the installation of the equipment, spare parts and materials including placing and connecting the parts to their positions according to the design drawing, details of which are specified in Appendix 10. Test Runs means the test conducted respectively on the individual equipment and a series of equipment after Erection in order to check the mechanical performance of Contract Equipment, details of which are specified in Appendix 10. Commissioning means the initial production of the Contract Plant for the purpose ofcarrying out the Performance Test after the utilities being connected and the raw materials