【正文】
effected through the Buyer39。s Bank Appendix 12 The Specimen of Irrevocable Letter of Guarantee Issued by the Seller39。____________________ port as Port of Unloading. Destination Airport refers to____________________ , PRC. Job Site means the place where the Contract Plant is located, namely____________,________________ city,________________ Province, PRC. Site Representative means the representative nominated respectively by each Party, who is in charge of all the matters with respect to the contractual obligations of the respective Party on the Job Site. Technical Documentation means the technical indices, specifications, drawings and documents related to Design, Inspection, Erection, Test Runs, Commissioning, Performance Test, operation and maintenance of Contract Plant, details of which are specified in Appendix 2, 3, 8 and 9. Technical Service means the technical instruction, assistance and supervision rendered by the Seller to the Buyer with respect to Erection, Test Runs, Commissioning, Performance Test, operation, maintenance and other work related to the Contract Plant, details of which are specified in Appendix 4. Technical Training means the training rendered by the Seller to the Buyer with respect to Erection, Test Runs, Commissioning, Performance Test, operation, maintenance and other work related to the Contract Plant, details of which are specified in Appendix 5. Inspection Authorities refers to the local inspection branch of State Administration for EntryExit Inspection and Quarantine of PRC located at/near the Port of Unloading and/or the Job Site. Warranty Period means a period starting from the date of acceptance, during which the Seller warrants the proper and stable operation of the Contract Plant and is responsible for eliminating any defects with respect to the Contract Plant, detail of which are specified in Appendix 3. Effective Date of the Contract means the date when the contract is approved by petent authorities of the respective Party39。 C. Five (5) copies of proforma invoice covering the Contract Price。 I. One (1) copy of fax advising the Buyer of the shipment immediately after it is made. Payment after the Acceptance of the Contract Plant _____Percent (_____%) of the price as specified in Article , , and , (say____________________only) shall be paid by the Buyer to the Seller within_____days after the following documents have been received and found in order: A. One (1) copy of the Acceptance Certificate of the Contract Plant signed by the Site Representatives of two Parties。 G. Name, weight, IMCO No. (as per International Maritime Dangerous Goods Code) of the dangerous and/or inflammable goods. In the meantime the Seller shall airmail the following documents in six (6) duplicate copies to the Buyer: A. The details list of the shipment covering Contract No., item No., name of the Contract Equipment, specification, type, quantity, unit/total price, unit weight, unit/total volume, the overall dimensions of each package (length x width x height), total number of packages and Port of Shipment. B. Overall packing sketch for each large piece exceeding twenty (20) metric tons in weight or 12 x x 3 meters in measurement。 G. Gross/Net weight。 C. Total volume。 G. One (1) original and five (5) duplicate copies of certificate of origin issued by relevant authorities or agency of the manufacture39。s and/or manufacture39。 Banks, refer to_____________, as Buyer39。s Bank。s country or a statement of relevant authorities/agency certifying that no export license is required。s country。 D. Total gross weight/total number of packages。 H. Measurement (length X width X height in cm). Should the Contract Equipment weight 2 or more than 2 metric tons, the weight, gravity and hoisting position shall be marked in English and with international trade transportation practice marks illustrative marks on the four adjacent sides of each case so as to facilitate and loading, unloading and handling. In accordance with the characteristics and different requirements in loading, unloading and shipping different equipment, the package shall be conspicuously mar。 F. Name, total gross weight and measurements of each piece exceeding twenty (20) metric tons in weight or 12 x x 3 meters in measurement。s fax showing that the carrying vessel has been approved by the Buyer。s Bank in favor of the Buyer covering__________(say__________only), specimen of which is specified in Appendix 11。s Bank. Erection means the installation of the equipment, spare parts and materials including placing and connecting the parts to their positions according to the design drawing, details of which are specified in Appendix 10. Test Runs means the test conducted respectively on the individual equipment and a series of equipment after Erection in order to check the mechanical performance of Contract Equipment, details of which are specified in Appendix 10. Commissioning means the initial production of the Contract Plant for the purpose ofcarrying out the Performance Test after the utilities being connected and the raw materials being put into the Contract Plant, details of which are specified in Appendix 10. Performance Test means the tests conducted pursuant to Appendix 10, in order to identify whether the Contract Plant and the Contract Product have achieved the technical performance and guarantee indices specified in Appendix 3. Acceptance means the Buyer accepts the Contract Plant after it reaches the technical performance and guarantee indices specified in Appendix 3. 1. 12 Port of Shipment and Unloading refers to____________________ port, as Port of Shipment。s Bank CIF M