【正文】
ground works No Equipment Unit Qty. Application Remark 1 Excavator Set 1 Excavate earth 2 Bulldozer Set 1 Level the ground 3 Road roller Set 2 Compact the ground 15T, 25T 4 Concrete mixer Set 1 Concreting 5 Vacuum waterabsorption pump Set 1 Absorb water on the surface 6 Concrete finisher Set 1 Finish concrete layer 7 Frog rammer Set 2 Compact the floor 8 Generator Set 1 Temporary power supply 70KW 9 Wholestation instrument Set 1 Measurement Annex 3: List of main machines expected for civil construction No. Equipment Spec. Qty. Original place Manufacture year Rated power KW Productivity Application post Remark 1 AC electricwelding machine BXT400 1 Jianhu 20xx 21 Welding 2 DC electricwelding machine AX4300 1 Yangzhou 20xx 30 Welding 3 Disk saw YPJ2 1 Wuxi 20xx Wood processing 4 Manual electrical saw 1 Wuxi Purchased later Wood processing 5 Concrete rammer JZM350 1 Yangzhou 20xx Make mortar and partial concrete 6 Mortar mixer HJ200A 1 Yangzhou Purchased later Make mortar 7 Plate vibrator ZW5 1 Shanghai Purchased later Concreting 8 Vibration rod ZP35 2 Wuxi Purchased later Concreting amp。 Construction, Organization amp。 mixing 9 backhoe 1 20xx 1m3 Excavate earth 10 Frog rammer HM60 2 Wuxi 20xx Backfill 11 Submerge pump QY35 1 Shanghai 現(xiàn)購(gòu) Water pumping 12 13 14 15 16 Chapter III Construction deployment and general layout I. Construction deployment (1) Principle of construction deployment Facing tough petition of building market, all work in the engineering construction should adequately reflect the enterprise guideline and spirit of our pany, emphasizing on ―construction control, quality control and creation control‖ to anize and instruct the construction according to the specific characteristics of this project, which concretely implementing the following tasks: providing the most excellent project manager sector, assigning the construction team that works hard and is apt at overing various difficulties, adopting advanced technical management and wellequipped construction tools, sound and scientific construction schedule and construction scheme. All subsection and items of this project will not be subcontracted without exception. (2) Project development process In terms of our pany’s construction capability and the similar project constructed as before, we are determined and confident to plete the project with high quality on schedule, provide good service for the early application of client. The concrete construction deployment are as follows: 1. Construction process schedule (1) Plane construction section division: Owing to the so many specialties of this project, in order to control the construction quality, plan to divide into twoconstruction section as per the auxiliary building, indoor amp。 tri al runni ng of motor E ns ur e no ac c i d en t duri n g c on ti n uo us operati on M at eri al tes t , d es i g n tes t for pr op orti oni ng ra ti o o f c onc rete and mortar S a mpl ed by W ux i l ab or at ory wi th fi rs t qu al i fi c ati o n l ev el th at s h al l pr ov i d e c orrec t proporti oni ng rati o Annex: Plan of project start/ pletion and exit Work Description Days from defined handover date Remark Check contracted works According to design drawing s and contract 20 Completion Final work, missing works and repair Draft operation plan and operate works simultaneously 20 acceptance Completion acceptance documents Classify collected and kept documents and files 20 Selfcheck by all construction units According to related rules, assessment standards and contract provisions 15 Preparation Selfcheck anized by project manager Organize operation, technical, quality and preliminary estimation departments 20 Fill the notice for pletion acceptance After selfcheck confirms pliance with requirements and standards 20 Job Preliminary check by pany Supervision personnel anizes operation, technical, quality and preliminary estimation departments 15 Submit acceptance application report Submitted by pany to supervision unit 15 Party A: site acceptance Conducted by acceptance team under anization of supervision personnel 10 Party B: official acceptance Owner, designer, construction personnel, and quality supervision station participate in the acceptance under guidance of supervision engineers 10 Completion 1. Visual check As per related rules, assessment standards, contract requirements, design drawings 10 2. Measurement check As per related rules, assessment standards, contract requirements, design drawings 10 3. Document check Check if the listed are plete 10 4. Site acceptance conference 1) Project manager introduces selfcheck and pletion of project 10 Acceptance 2) Present pletion documents including pletion drawings and original documents and records 10 3) Supervision engineers notify main contents during supervision and give ments of pletion acceptance. 10 4) Owner requires construction unit to treat any problem found in the pletion acceptance within limited schedule. 10 5) QC department with owner and supervision engineers discuss whether project passes official acceptance on the preliminary meeting 10 6) On the review meeting supervision engineers release acceptance results and QC personnel gives quality rating of project 5 Party C: Acquire pletion acceptance certificate Certificate is valid only with signatures of legally authorized representatives 5 Handover Exit works Quickly remove rest construction materials, turnover materials, tools and temporary facilities 5 Repair wo