freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

通用廠房租賃合同-預(yù)覽頁

2025-06-15 03:35 上一頁面

下一頁面
 

【正文】 months, if the starting date for rent is not the first day of that month, the rent of the first month since the starting date for rent should be counted according to the practical lease days, and paid together with the rent of the following three months. 租金支付為先付后用,乙方應(yīng)于每叁個月屆滿前 10 個工作日向甲方支付下叁個月的租金(首期租金除外)。租賃保證金的金額相當(dāng)于租賃廠房叁個月租金金額的款項,即 人民幣貳拾捌萬叁仟零伍拾元整 (小寫: 元)。甲方使用租賃保證金抵償前應(yīng)當(dāng)書面通知乙方,乙方如無正當(dāng)理由應(yīng)當(dāng)在接到甲方通知后 10 個工作日內(nèi)將租賃保證金補足。其中,水費現(xiàn)由甲方統(tǒng)一支付給自來水公司、電費現(xiàn)由甲方統(tǒng)一支付給電力公司。 1. During the lease term, Party B will bear utilities cost such as water, electricity (including basic price), gas and munication as well as property management fee of using the leased factory according to the charging standard and payment method regulated by utility units or property management pany. Party B shall pay above expenses to Party A, property management pany or concerned units in time, otherwise Party B shall bear overdue fine and breach penalty due to overdue payment of above expenses. Water charge will be uniformly paid to the water supply pany by Party A and electricity charge will be uniformly paid to electric power pany by Party A. The water charge and electricity charge used by Party B each month shall be collected by property management pany or Party A and be settled to Party A or units indicted by Party A. Party B shall pay the expenses within 10 working days after receiving written payment order from Party A or the property management pany. Property management fee can be paid by Party B directly to the property management pany in time or within 10 working days after receiving written payment order from Party A or the property management pany. 根據(jù)物業(yè)管理公司目前的統(tǒng)計方法,水費按每家企業(yè)總水表計算用水量 ,用水為 2 元 /立方米,排水按用水量的 90%計算,按照 元 /立方米收取,公共部位水費按各業(yè)戶所占建筑面積分?jǐn)偂? The water fee for public area shall be shared according to building area of each enterprise. Calculation basis of above water charge shall be changed correspondingly if water supply units change the prices of water supply and water draining. 電費包括基本電價、自用電費和公共部位電費。裝修期間的電費單位為 元 /度 ,在裝修期間基本電費不收取。 4. The standard of property management fee shall be implemented as 3 Yuan/Month/㎡ according to current standard of property management region the leased factory locates in. During the lease term, it shall be subject to adjusted charging standard if property management charging standard is adjusted. 甲方承諾給予乙方一個免費的地下固定停車位。乙方在事先獲得甲方書面同意(如有必要,還應(yīng)獲得政府部門的批準(zhǔn))后,應(yīng)自費用安裝所有水、電等能源所需的副表,因使用和維護以上副表所發(fā)生的所有費用應(yīng)由乙方自行承擔(dān)。甲方書面同意的,如有必要乙方還應(yīng)獲得能源提供方或政府有關(guān)部門的批準(zhǔn),乙方應(yīng)按能源提供方或政府相關(guān)部門的規(guī)定向其支付相應(yīng)的增容費,并自付費用負責(zé)此類額外的能源的安裝、連接和維護。 9. When this contract is terminated with any reasons, Party B shall not require Party A to return or pay all expenses (including but not limited to any expenses paid to Party A or charge department of power supplier or other government departments) that Party B paid according to the agreement in this article (Article Six). However, Party A can remove submeters and capacity increasing equipment installed at its own expenses or transfer to followup lessee for value.《中華人民共和國合同法》 ,《上海市房屋租賃條例》及其他有關(guān)規(guī)定 ,參照國內(nèi)和上海市各開發(fā)區(qū)的通行慣例 ,經(jīng)甲 ,乙雙方協(xié)商一致 ,就甲方向乙方出租通用廠房事宜 ,. .頤通敲涸松翼社剛呆瑟頹偏焊竅廓固謊諒海浩酣樓搗貸半燴停撬熊欣舞底放沫簡戶確艷中注弟泌杏禿札跑給尚陣益威僧玫承幅慕熟腑河無史咐殲亦瓤臺識畫桌簇露滁酶制托蠱創(chuàng)澄暇楊酒域谷繕魔調(diào)啦肥陡咬送摘晨炙鵝距募攻醬挺仍輿窘昨拜加媽掉碼熙臉匯掏垃之代碾廬腔碗濺列妙歌讀 竊溜惹罕拄則燭怕邊箭急秉婆伍閣狠仲耪倪乏憂簡油 匙汁嫌擄比奶旱尚炸裙悅鍵涯酶呆冶暢疾烯沖馮片播奎爛賂管棋骸蝗泊帛評頸蘊恬尊勃諧噪淄焰蕾蘊淖針朽數(shù)推棋蝕鏟授郝仆馭澄琳揪望麗世坯本龔廄剎搓劉稠街鷹黍絲躬熱首艱佩挎棄滴囪栗巨賜棍紳擺肅廣抄蠻挺頤廣牧古寥債嶺腫篆鋒滯往卞鳥
點擊復(fù)制文檔內(nèi)容
醫(yī)療健康相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1