【正文】
ulated the amount of the order, on the first floor, ceiling, rear wall decorative part of the project calculated the amount of the order, and sets a fixed total cost of reviewing the results obtained is wrong. Budget calculation and preparation of construction plans, the obedience truth, not opinionated, to ensure quantity and price accurate and reasonable. By studying the construction drawings budgeting, allowing us to better respond to different project cost budget, and continuously improve the quality of budgeting, advantages and disadvantages of an integrated approach in different engineering conditions to select the most appropriate methodology. General civil engineering construction drawings budgeting mon quantity price method, monly used in decorative construction drawing budget integrated unit method. From the two basic construction drawing budget preparation methods, analyzes the advantages and disadvantages of both, integrated basic theoretical knowledge, cost formulas, etc., in the face of different projects to choose the best approach to budgeting.The design is based on a twostory building construction drawings, construction drawing budget report prepared in accordance with the procedures, pliance engineering calculation rules to Tianjin 2008 instructions for the preparation of a fixed basis, while preparing a project budget out of the book. In the preparation process, the author detailed calculations of the various units of engineering, each part of the project are defined in strict pliance with engineering calculation rules, and access to a large number of related books. Finally, the design results are summarized and analyzed, based on experiences throughout the design process, forming a design specification preparation of project budget book is the focus of this design, because the lack of experience in the engineering details of the deal, there are still many defects.Keywords: engineering。 experience.目 錄摘 要 iABSTRACT ii目 錄 iv1 緒論 1 設(shè)計(jì)目的和意義 2 國(guó)內(nèi)外現(xiàn)狀 32 施工圖預(yù)算的有關(guān)概念及編制方法 4 施工圖預(yù)算的相關(guān)概念 4 施工圖預(yù)算的作用 4 施工圖預(yù)算的編制方法 63 更好編制預(yù)算的方法及重審預(yù)算 7 正確的看圖紙順序 7 計(jì)算工程量的順序 8 計(jì)算注意要點(diǎn) 84 天津市XX小區(qū)2號(hào)樓施工圖預(yù)算設(shè)計(jì)方案 8 工程概況 8 施工圖預(yù)算的編制依據(jù) 9 工程量的計(jì)算 9 土方工程 9 砌筑工程 10 凝土工程 10 鋼筋工程 10 工程造價(jià)的確定 11 直接費(fèi)的計(jì)算 11 間接費(fèi)的計(jì)算 12結(jié)論 14致 謝 15參考文獻(xiàn) 16附錄 一 17 1 緒論作為建設(shè)單位希望以最少的資金,造出質(zhì)優(yōu)的工程,因此必須對(duì)工程項(xiàng)目投資實(shí)施全過(guò)程有效的成本控制,從組織、技術(shù)、合同等方面,挖掘潛力,降低成本,提高投資效益和社會(huì)效益。由于設(shè)計(jì)方案、工料機(jī)價(jià)格等變化,往往容易導(dǎo)致投資“失控”,具體表現(xiàn)為:初步設(shè)計(jì)概算大于可行性研究投資估算;施工圖預(yù)算大于初步設(shè)計(jì)概算。作為建設(shè)單位希望以最少的資金,造出質(zhì)優(yōu)的工程,因此必須對(duì)工程項(xiàng)目投資實(shí)施全過(guò)程有效的成本控制,從組織、技術(shù)、合同等方面,挖掘潛力,降低成本,提高投資效益和社會(huì)效益。當(dāng)然,預(yù)算工作是一份細(xì)致的工作,在做預(yù)算的過(guò)程要注意很多的細(xì)節(jié),如挑檐、樓梯欄桿中的預(yù)埋件、馬凳筋等的計(jì)算。每一步都要準(zhǔn)確無(wú)誤。它是設(shè)計(jì)單位提供給建設(shè)單位設(shè)計(jì)資料中的一部分,是施工單位承接建筑工程項(xiàng)目后首先要做的工作。為此研制了一種利用計(jì)算機(jī)實(shí)現(xiàn)建筑工程施工圖預(yù)算的軟件,從而大大提高了編制建筑工程施工圖預(yù)算的速度和準(zhǔn)確性。一般土建工程施工圖預(yù)算編制常用工料單價(jià)法,裝飾工程施工圖預(yù)算常用綜合單價(jià)法。施工圖預(yù)算是根據(jù)批準(zhǔn)的施工圖設(shè)計(jì)、預(yù)算定額和單位計(jì)價(jià)表、施工組織設(shè)計(jì)文件以及各種費(fèi)用定額等有關(guān)資料進(jìn)行計(jì)算和編制的單位工程預(yù)算造價(jià)的文件。單位工程預(yù)算是根據(jù)施工圖設(shè)計(jì)文件、現(xiàn)行預(yù)算定額、費(fèi)用定額和人工、材料、設(shè)備、機(jī)械臺(tái)班等預(yù)算價(jià)格資料,以一定的方法,編制單位工程的施工圖預(yù)算,然后匯總所有各單位工程施工圖預(yù)算,成為單項(xiàng)工程施工圖預(yù)算,再匯總所有各單項(xiàng)工程施工圖預(yù)算,便是一個(gè)建設(shè)項(xiàng)目建筑安裝工程的總預(yù)算?,F(xiàn)將圍繞建筑行業(yè)國(guó)際工程施工的招標(biāo)與投標(biāo)的一系列規(guī)則做具體的分析和研究。雖然說(shuō)我們的工程造價(jià)管理基本體制與別的工程造價(jià)管理基本體制相比各有優(yōu)缺點(diǎn),但是從世界工程造價(jià)管理發(fā)展的總趨勢(shì)上看,美國(guó)的工程造價(jià)管理體制正在隨著市場(chǎng)經(jīng)濟(jì)的發(fā)展和信息化社會(huì)的推進(jìn)而逐步成為主流。在中國(guó),施工圖預(yù)算是建筑企業(yè)和建設(shè)代為簽訂承包和通和辦理工程結(jié)算的一局;也是建筑企業(yè)編制計(jì)劃、實(shí)行經(jīng)濟(jì)核算和考核經(jīng)營(yíng)成果的依據(jù)。建筑工程由于體積龐大,結(jié)構(gòu)復(fù)雜,形態(tài)多而難以制訂統(tǒng)一的出廠價(jià)格,而必須依據(jù)各自的施工設(shè)計(jì)圖紙,預(yù)算定額單價(jià)、取費(fèi)標(biāo)準(zhǔn)(間接費(fèi)定額)等分別計(jì)算各個(gè)建筑工程的預(yù)算造價(jià)。按照國(guó)家工程建設(shè)管理制度的要求,年度基本建設(shè)計(jì)劃必須根據(jù)審定后的建設(shè)預(yù)算進(jìn)行編制。因?yàn)槭┕D預(yù)算所確定的工程造價(jià),是建筑產(chǎn)品的出廠價(jià)格,雙方為了各自的經(jīng)濟(jì)利益,應(yīng)以施工圖預(yù)算為準(zhǔn),明確責(zé)任,分工協(xié)作,互相制約,共同保證完成國(guó)家基本建設(shè)計(jì)劃。單位建筑工程施工圖預(yù)算是以貨幣形式,綜合反映工程項(xiàng)目設(shè)計(jì)標(biāo)準(zhǔn)和設(shè)計(jì)質(zhì)量的經(jīng)濟(jì)價(jià)值數(shù)量。施工企業(yè)為了增加盈余,就必須在預(yù)算造價(jià)范圍內(nèi),努力改善經(jīng)營(yíng)管理,提高勞動(dòng)生產(chǎn)率,降低各種消耗。 施工圖預(yù)算的編制方法 用單價(jià)法編制施工圖預(yù)算,就是根據(jù)地區(qū)統(tǒng)一單位估價(jià)表中的各分項(xiàng)工程綜合單價(jià),乘以相應(yīng)的各分項(xiàng)工程量,并相加,得到單位工程的人工費(fèi)。(2)熟悉施工圖紙 了解施工現(xiàn)場(chǎng)施工圖紙是編制預(yù)算的工作對(duì)象,也是基本依據(jù)。所謂工程量是指以物理計(jì)量單位或自然計(jì)量單位表示的各個(gè)具體分項(xiàng)工程的數(shù)量。3) 進(jìn)行計(jì)算。首先,把計(jì)算好的分項(xiàng)工程量及計(jì)算單位,按照定額分部順序整理填寫(xiě)到預(yù)算表上。再按規(guī)定計(jì)取其他各項(xiàng)費(fèi)用,最后總得出單位工程施工圖雨傘造價(jià),實(shí)物法在市場(chǎng)經(jīng)濟(jì)調(diào)價(jià)下,人工、材料和機(jī)械臺(tái)班單價(jià)是隨著市場(chǎng)變化的,而且它們是影響工程造價(jià)最活躍、最主要的因素。不論是針對(duì)簡(jiǎn)單的圖紙還是復(fù)雜的圖紙,最忌諱的就是拿著基礎(chǔ)平面圖,就開(kāi)始計(jì)算三線一面。 B計(jì)算裝飾部分時(shí)要先地面天棚后墻面(先算地面工程量的好處是可以利用地面的面積,計(jì)算出平面天棚和斜天棚的面積。計(jì)算工程量是編制預(yù)算書(shū)最為關(guān)鍵的一步。 計(jì)算注意要點(diǎn) 首先把所有分部分項(xiàng)工程的子項(xiàng)列出來(lái)(對(duì)新手很有用,不會(huì)少項(xiàng)漏項(xiàng)或者重復(fù)計(jì)算再合理安排工程量計(jì)算順序是快速準(zhǔn)確計(jì)算工程量的關(guān)鍵之一。4 天津市XX小區(qū)2號(hào)樓施工圖預(yù)算設(shè)計(jì)方案 工程概況,主題地下一層,地上三層,;采用筏板基礎(chǔ)、鋼筋硂短肢剪力墻結(jié)構(gòu),輕型材料的填充墻;主體結(jié)構(gòu)安全等級(jí)為二級(jí),地基基礎(chǔ)設(shè)計(jì)等級(jí)為丙級(jí);使用年限50年,建筑耐火等級(jí):地上二級(jí)耐火等級(jí),地下一級(jí)耐火等級(jí),抗震設(shè)防烈度:7度;屋面防水等級(jí)為高層二級(jí)、底層三級(jí);基礎(chǔ)形式:樁基。 (3)與施工圖預(yù)算計(jì)價(jià)模式有關(guān)的計(jì)價(jià)依據(jù) (2008年天津定額說(shuō)明)所采用的預(yù)算造價(jià)計(jì)價(jià)模式不同,預(yù)算編制依據(jù)也不同。(4)工料機(jī)價(jià)格調(diào)整以2013年三季度當(dāng)?shù)匦畔r(jià)格為準(zhǔn) 工程量的計(jì)算 土方工程土方工程由平整場(chǎng)地,挖土方,回填土三部分組成。計(jì)算公式為:回填土=挖方體積設(shè)計(jì)室外地坪一下埋設(shè)的基礎(chǔ)體積。外墻—2(A、B)均為貼面磚外墻,厚度30。 凝土工程(1)柱混凝土(以KZ1為例)計(jì)算柱混凝土以立方米為單位,按圖示斷面尺寸乘以柱高計(jì)算。 工程造價(jià)的確定 直接費(fèi)的計(jì)算土建直接工程費(fèi)即定額直接費(fèi)是指在施工過(guò)程中耗用的構(gòu)成工程實(shí)體和有助于工程實(shí)體形成的各項(xiàng)費(fèi)用。措施費(fèi)包括[9]:1)環(huán)境保護(hù)費(fèi):是指施工現(xiàn)場(chǎng)為達(dá)到環(huán)保部門(mén)要求所需要的各項(xiàng)費(fèi)用。5)夜間施工費(fèi):是指因夜間施工所發(fā)生的夜班補(bǔ)助費(fèi)、夜間施工降效、夜間施工照明設(shè)備攤銷(xiāo)及照明用電費(fèi)用。 9)腳手架費(fèi):是指施工需要的各種腳手架搭、拆、運(yùn)輸費(fèi)用及腳手架的攤銷(xiāo)(或租賃)費(fèi)用。13)其他措施費(fèi):上述內(nèi)容未包括,但在工程實(shí)施過(guò)程中應(yīng)發(fā)生的措施費(fèi)用。包括::是指施工現(xiàn)場(chǎng)按規(guī)定繳納的工程排污費(fèi)。(3)醫(yī)療保險(xiǎn)費(fèi):是指企業(yè)按照規(guī)定標(biāo)準(zhǔn)為職工繳納的基本醫(yī)療保險(xiǎn)費(fèi)。2)企業(yè)管理費(fèi):是指建筑安裝企業(yè)組織施工生產(chǎn)和經(jīng)營(yíng)管理所需費(fèi)用。:是指管理和試驗(yàn)部門(mén)及附屬生產(chǎn)單位使用的屬于固定資產(chǎn)的房屋、設(shè)備儀器等的折舊、大修、維修或租賃費(fèi)。結(jié)論,坡屋面,,。通過(guò)工程量的詳細(xì)計(jì)算,并利用定額、市場(chǎng)價(jià)等對(duì)工程進(jìn)行計(jì)價(jià),最后對(duì)工程進(jìn)行取費(fèi)確定該工程的工程造價(jià)。(2)由于所采用的市場(chǎng)價(jià)與該工程建設(shè)時(shí)當(dāng)時(shí)當(dāng)?shù)氐氖袌?chǎng)價(jià)稍有偏差,以至工程造價(jià)與實(shí)際存在差異;(4)統(tǒng)一的費(fèi)率計(jì)取,不符合現(xiàn)實(shí)市場(chǎng)經(jīng)濟(jì)的要求,阻礙了建筑施工企業(yè)間的競(jìng)爭(zhēng)。32致 謝本畢業(yè)設(shè)計(jì)(論文)的工作是在常生福老師的悉心指導(dǎo)下完成的,常生福老師嚴(yán)謹(jǐn)?shù)闹螌W(xué)態(tài)度和科學(xué)的工作方法給了我極大的幫助和影響。在撰寫(xiě)畢業(yè)設(shè)計(jì)(論文)期間,龐敬云、周瑞、劉建博、王莉等同學(xué)對(duì)我畢業(yè)設(shè)計(jì)(論文)中的工程量計(jì)算部分研究工作給予了熱情幫助,在此向他們表達(dá)我的感