【正文】
ulated the amount of the order, on the first floor, ceiling, rear wall decorative part of the project calculated the amount of the order, and sets a fixed total cost of reviewing the results obtained is wrong. Budget calculation and preparation of construction plans, the obedience truth, not opinionated, to ensure quantity and price accurate and reasonable. By studying the construction drawings budgeting, allowing us to better respond to different project cost budget, and continuously improve the quality of budgeting, advantages and disadvantages of an integrated approach in different engineering conditions to select the most appropriate methodology. General civil engineering construction drawings budgeting mon quantity price method, monly used in decorative construction drawing budget integrated unit method. From the two basic construction drawing budget preparation methods, analyzes the advantages and disadvantages of both, integrated basic theoretical knowledge, cost formulas, etc., in the face of different projects to choose the best approach to budgeting.The design is based on a twostory building construction drawings, construction drawing budget report prepared in accordance with the procedures, pliance engineering calculation rules to Tianjin 2008 instructions for the preparation of a fixed basis, while preparing a project budget out of the book. In the preparation process, the author detailed calculations of the various units of engineering, each part of the project are defined in strict pliance with engineering calculation rules, and access to a large number of related books. Finally, the design results are summarized and analyzed, based on experiences throughout the design process, forming a design specification preparation of project budget book is the focus of this design, because the lack of experience in the engineering details of the deal, there are still many defects.Keywords: engineering。 experience.目 錄摘 要 iABSTRACT ii目 錄 iv1 緒論 1 設(shè)計目的和意義 2 國內(nèi)外現(xiàn)狀 32 施工圖預(yù)算的有關(guān)概念及編制方法 4 施工圖預(yù)算的相關(guān)概念 4 施工圖預(yù)算的作用 4 施工圖預(yù)算的編制方法 63 更好編制預(yù)算的方法及重審預(yù)算 7 正確的看圖紙順序 7 計算工程量的順序 8 計算注意要點 84 天津市XX小區(qū)2號樓施工圖預(yù)算設(shè)計方案 8 工程概況 8 施工圖預(yù)算的編制依據(jù) 9 工程量的計算 9 土方工程 9 砌筑工程 10 凝土工程 10 鋼筋工程 10 工程造價的確定 11 直接費的計算 11 間接費的計算 12結(jié)論 14致 謝 15參考文獻(xiàn) 16附錄 一 17 1 緒論作為建設(shè)單位希望以最少的資金,造出質(zhì)優(yōu)的工程,因此必須對工程項目投資實施全過程有效的成本控制,從組織、技術(shù)、合同等方面,挖掘潛力,降低成本,提高投資效益和社會效益。由于設(shè)計方案、工料機(jī)價格等變化,往往容易導(dǎo)致投資“失控”,具體表現(xiàn)為:初步設(shè)計概算大于可行性研究投資估算;施工圖預(yù)算大于初步設(shè)計概算。作為建設(shè)單位希望以最少的資金,造出質(zhì)優(yōu)的工程,因此必須對工程項目投資實施全過程有效的成本控制,從組織、技術(shù)、合同等方面,挖掘潛力,降低成本,提高投資效益和社會效益。當(dāng)然,預(yù)算工作是一份細(xì)致的工作,在做預(yù)算的過程要注意很多的細(xì)節(jié),如挑檐、樓梯欄桿中的預(yù)埋件、馬凳筋等的計算。每一步都要準(zhǔn)確無誤。它是設(shè)計單位提供給建設(shè)單位設(shè)計資料中的一部分,是施工單位承接建筑工程項目后首先要做的工作。為此研制了一種利用計算機(jī)實現(xiàn)建筑工程施工圖預(yù)算的軟件,從而大大提高了編制建筑工程施工圖預(yù)算的速度和準(zhǔn)確性。一般土建工程施工圖預(yù)算編制常用工料單價法,裝飾工程施工圖預(yù)算常用綜合單價法。施工圖預(yù)算是根據(jù)批準(zhǔn)的施工圖設(shè)計、預(yù)算定額和單位計價表、施工組織設(shè)計文件以及各種費用定額等有關(guān)資料進(jìn)行計算和編制的單位工程預(yù)算造價的文件。單位工程預(yù)算是根據(jù)施工圖設(shè)計文件、現(xiàn)行預(yù)算定額、費用定額和人工、材料、設(shè)備、機(jī)械臺班等預(yù)算價格資料,以一定的方法,編制單位工程的施工圖預(yù)算,然后匯總所有各單位工程施工圖預(yù)算,成為單項工程施工圖預(yù)算,再匯總所有各單項工程施工圖預(yù)算,便是一個建設(shè)項目建筑安裝工程的總預(yù)算?,F(xiàn)將圍繞建筑行業(yè)國際工程施工的招標(biāo)與投標(biāo)的一系列規(guī)則做具體的分析和研究。雖然說我們的工程造價管理基本體制與別的工程造價管理基本體制相比各有優(yōu)缺點,但是從世界工程造價管理發(fā)展的總趨勢上看,美國的工程造價管理體制正在隨著市場經(jīng)濟(jì)的發(fā)展和信息化社會的推進(jìn)而逐步成為主流。在中國,施工圖預(yù)算是建筑企業(yè)和建設(shè)代為簽訂承包和通和辦理工程結(jié)算的一局;也是建筑企業(yè)編制計劃、實行經(jīng)濟(jì)核算和考核經(jīng)營成果的依據(jù)。建筑工程由于體積龐大,結(jié)構(gòu)復(fù)雜,形態(tài)多而難以制訂統(tǒng)一的出廠價格,而必須依據(jù)各自的施工設(shè)計圖紙,預(yù)算定額單價、取費標(biāo)準(zhǔn)(間接費定額)等分別計算各個建筑工程的預(yù)算造價。按照國家工程建設(shè)管理制度的要求,年度基本建設(shè)計劃必須根據(jù)審定后的建設(shè)預(yù)算進(jìn)行編制。因為施工圖預(yù)算所確定的工程造價,是建筑產(chǎn)品的出廠價格,雙方為了各自的經(jīng)濟(jì)利益,應(yīng)以施工圖預(yù)算為準(zhǔn),明確責(zé)任,分工協(xié)作,互相制約,共同保證完成國家基本建設(shè)計劃。單位建筑工程施工圖預(yù)算是以貨幣形式,綜合反映工程項目設(shè)計標(biāo)準(zhǔn)和設(shè)計質(zhì)量的經(jīng)濟(jì)價值數(shù)量。施工企業(yè)為了增加盈余,就必須在預(yù)算造價范圍內(nèi),努力改善經(jīng)營管理,提高勞動生產(chǎn)率,降低各種消耗。 施工圖預(yù)算的編制方法 用單價法編制施工圖預(yù)算,就是根據(jù)地區(qū)統(tǒng)一單位估價表中的各分項工程綜合單價,乘以相應(yīng)的各分項工程量,并相加,得到單位工程的人工費。(2)熟悉施工圖紙 了解施工現(xiàn)場施工圖紙是編制預(yù)算的工作對象,也是基本依據(jù)。所謂工程量是指以物理計量單位或自然計量單位表示的各個具體分項工程的數(shù)量。3) 進(jìn)行計算。首先,把計算好的分項工程量及計算單位,按照定額分部順序整理填寫到預(yù)算表上。再按規(guī)定計取其他各項費用,最后總得出單位工程施工圖雨傘造價,實物法在市場經(jīng)濟(jì)調(diào)價下,人工、材料和機(jī)械臺班單價是隨著市場變化的,而且它們是影響工程造價最活躍、最主要的因素。不論是針對簡單的圖紙還是復(fù)雜的圖紙,最忌諱的就是拿著基礎(chǔ)平面圖,就開始計算三線一面。 B計算裝飾部分時要先地面天棚后墻面(先算地面工程量的好處是可以利用地面的面積,計算出平面天棚和斜天棚的面積。計算工程量是編制預(yù)算書最為關(guān)鍵的一步。 計算注意要點 首先把所有分部分項工程的子項列出來(對新手很有用,不會少項漏項或者重復(fù)計算再合理安排工程量計算順序是快速準(zhǔn)確計算工程量的關(guān)鍵之一。4 天津市XX小區(qū)2號樓施工圖預(yù)算設(shè)計方案 工程概況,主題地下一層,地上三層,;采用筏板基礎(chǔ)、鋼筋硂短肢剪力墻結(jié)構(gòu),輕型材料的填充墻;主體結(jié)構(gòu)安全等級為二級,地基基礎(chǔ)設(shè)計等級為丙級;使用年限50年,建筑耐火等級:地上二級耐火等級,地下一級耐火等級,抗震設(shè)防烈度:7度;屋面防水等級為高層二級、底層三級;基礎(chǔ)形式:樁基。 (3)與施工圖預(yù)算計價模式有關(guān)的計價依據(jù) (2008年天津定額說明)所采用的預(yù)算造價計價模式不同,預(yù)算編制依據(jù)也不同。(4)工料機(jī)價格調(diào)整以2013年三季度當(dāng)?shù)匦畔r格為準(zhǔn) 工程量的計算 土方工程土方工程由平整場地,挖土方,回填土三部分組成。計算公式為:回填土=挖方體積設(shè)計室外地坪一下埋設(shè)的基礎(chǔ)體積。外墻—2(A、B)均為貼面磚外墻,厚度30。 凝土工程(1)柱混凝土(以KZ1為例)計算柱混凝土以立方米為單位,按圖示斷面尺寸乘以柱高計算。 工程造價的確定 直接費的計算土建直接工程費即定額直接費是指在施工過程中耗用的構(gòu)成工程實體和有助于工程實體形成的各項費用。措施費包括[9]:1)環(huán)境保護(hù)費:是指施工現(xiàn)場為達(dá)到環(huán)保部門要求所需要的各項費用。5)夜間施工費:是指因夜間施工所發(fā)生的夜班補(bǔ)助費、夜間施工降效、夜間施工照明設(shè)備攤銷及照明用電費用。 9)腳手架費:是指施工需要的各種腳手架搭、拆、運(yùn)輸費用及腳手架的攤銷(或租賃)費用。13)其他措施費:上述內(nèi)容未包括,但在工程實施過程中應(yīng)發(fā)生的措施費用。包括::是指施工現(xiàn)場按規(guī)定繳納的工程排污費。(3)醫(yī)療保險費:是指企業(yè)按照規(guī)定標(biāo)準(zhǔn)為職工繳納的基本醫(yī)療保險費。2)企業(yè)管理費:是指建筑安裝企業(yè)組織施工生產(chǎn)和經(jīng)營管理所需費用。:是指管理和試驗部門及附屬生產(chǎn)單位使用的屬于固定資產(chǎn)的房屋、設(shè)備儀器等的折舊、大修、維修或租賃費。結(jié)論,坡屋面,,。通過工程量的詳細(xì)計算,并利用定額、市場價等對工程進(jìn)行計價,最后對工程進(jìn)行取費確定該工程的工程造價。(2)由于所采用的市場價與該工程建設(shè)時當(dāng)時當(dāng)?shù)氐氖袌鰞r稍有偏差,以至工程造價與實際存在差異;(4)統(tǒng)一的費率計取,不符合現(xiàn)實市場經(jīng)濟(jì)的要求,阻礙了建筑施工企業(yè)間的競爭。32致 謝本畢業(yè)設(shè)計(論文)的工作是在常生福老師的悉心指導(dǎo)下完成的,常生福老師嚴(yán)謹(jǐn)?shù)闹螌W(xué)態(tài)度和科學(xué)的工作方法給了我極大的幫助和影響。在撰寫畢業(yè)設(shè)計(論文)期間,龐敬云、周瑞、劉建博、王莉等同學(xué)對我畢業(yè)設(shè)計(論文)中的工程量計算部分研究工作給予了熱情幫助,在此向他們表達(dá)我的感