freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

上海某乙烯裂解裝置工程安裝施工方案-預(yù)覽頁

2025-06-29 22:31 上一頁面

下一頁面
 

【正文】 用電安全技術(shù)規(guī)程(JGJ4688)Safety and Technical Regulation of Power Supply Usage on Construction Site (JGJ4688)第二章 工程概況Chapter Two: General Situation General Situation of the Project本工程地處上海某化工園區(qū)內(nèi),由上海某石化有限公司投資興建的上海乙烯裂解裝置工程。樓地面設(shè)計做法:設(shè)計主要有防滑地磚樓地面、耐磨砼樓面。頂棚設(shè)計做法:主要有涂料頂棚、石膏板吊頂。Geological Situation: This project’s geological structure is arranged as: first layer is dredger fill, second layer is sandy silt, third layer is silty clay, fourth layer is clay and fifth layer is clay. In general, there is one layer of mixed fill with loose construction and plicated position in the ground. 基礎(chǔ)設(shè)計:采用樁承臺基礎(chǔ),樁基采用混凝土預(yù)制樁,基礎(chǔ)為獨立基礎(chǔ)、條形基礎(chǔ)、平臺基礎(chǔ)、設(shè)備基礎(chǔ),基礎(chǔ)砼等級C30。This project has large quantities of chemical equipment foundation, and requires a close cooperative and coordinated relation between the civil works and industrial equipment installation, where these two ones will be influenced and restricted with each other in construction procedures. During the construction, lots of embedded parts used for equipment installation to be prepared and its requirements of accuracy is higher. ,因此現(xiàn)場施工必須嚴(yán)格遵守業(yè)主方的管理方式進行管理。這需要業(yè)主、設(shè)計單位、設(shè)備供應(yīng)商、各專業(yè)施工單位協(xié)作提前解決圖紙技術(shù)問題,方可保證整個工程施工的順利進行。To ensure the quality of unit work achieve “You Liang” (excellent) degree.3.3工期目標(biāo) Scheduled Construction Period確保工程總工期目標(biāo):595個日歷天。The site “housekeeping” for this project will meet the high standard of “housekeeping” of Shanghai Municipality. The construction site shall be kept clean and tidy. Attention should be paid for the environment protection on site.第四章 施工部署Chapter Four: Construction Arrangement Establishment of Organization Mechanism我局將本工程列為“窗口工程”,以優(yōu)秀的項目經(jīng)理而成立的項目經(jīng)理部,選派先優(yōu)秀的項目管理人員進駐現(xiàn)場,按項目法進行項目施工。Earthworks: Two excavators to be used for excavation, two construction methods like single pit excavation and strip excavation to be adopted.鋼筋工程:豎向粗鋼筋主要采用電渣壓力焊連接方式;水平方向粗鋼筋主要采用閃光對焊連接方式。Form works: The posite metal forms to be applied for the foundation。According to the characteristics of the whole works, this project is divided into three construction stages. Construction Procedures按照設(shè)計圖紙共分為9個區(qū)域,而且主要以設(shè)備基礎(chǔ)為主,另外為3個變電站、2個雨水集水井和預(yù)制管架。 area 7, 8 and 9 are formed as one construction stage.施工測量 挖土施工 樁位驗收并交接 設(shè)備基礎(chǔ)、雨水分流集水井施工 回填土施工 變電站施工 預(yù)制管架吊裝 場地地坪施工Survey excavation pile position acceptance test and handing over equipment foundation storm water division sump backfill substation of Main Construction Machinery,砂漿攪拌采用一臺砂漿攪拌機;鋼筋、木工機械各配置一套。 one rebar bender and wood processing machine shall be provided respectively. For more details, see attached construction machinery list.Labor Organization and Site Staff Allocation Organization of Labor項目經(jīng)理部將成立專門的勞動力檔案管理系統(tǒng),制定各施工階段勞動力的需求計劃。Prior to construction, the construction team approved by the Owner shall be organized to enter the site to execute the works.,項目管理部組織各級工程人員進行工程情況及主要技術(shù)安全交底,特別是重點對其進行安全防火的宣傳教育,并制定相應(yīng)制度,要求他們遵照執(zhí)行。The general contractor shall, together with the Owner, Supervision Company and all Specialist Companies, work out the general working schedule, the Owner or the Subcontractor’s equipment supplying schedule or construction time schedule.,總包單位將主要完成以下技術(shù)準(zhǔn)備工作:Prior to construction, the general contractor shall mainly plete the following technical preparations: 圖紙會審工作。The technical, managerial staff and main chief personnel from all construction groups should be available on site, the design drawings and construction technology explanation meetings should be held step by –step. Material Preparation,立即著手工程物資準(zhǔn)備工作,制定工程物資需求計劃,并對各物資供應(yīng)商進行市場調(diào)研和確認(rèn),選擇信譽好、質(zhì)量優(yōu)、服務(wù)佳的物資供應(yīng)商并與其簽定采購合同,并按工程需要組織物資進入施工現(xiàn)場。Our pany’s machinery section shall be responsible for supplying or providing the construction machinery or equipment used for this project. Site Preparation,在施工管理區(qū)搭設(shè)現(xiàn)場管理人員和工人的辦公用房,在辦公用房內(nèi)安排活動休息用房。The site preparation shall be made and pleted within 10 days after the mencement of the works.第六章 施工總平面布置Chapter Six: Construction General Plan Layout General Plan Layout施工總平面布置遵照結(jié)構(gòu)經(jīng)濟合理、滿足施工要求、符合工程所在地市政、環(huán)保要求的原則,營造良好的生產(chǎn)工作環(huán)境,同時考慮配合設(shè)備安裝等其它專業(yè)施工進行平面布置。According to the design drawing, the ground to be paved with 300mm crushed stone in the future, while for the construction road, it to be made with 300mm crushed stone beside the foundation cap. Water consumption for construction 本工程業(yè)主提供管網(wǎng)接入口為Φ50管,現(xiàn)場施工用水管網(wǎng)采用直徑25的鍍鋅管埋地布置,埋深500毫米,布置路線本著沿道路周邊布置,現(xiàn)場養(yǎng)護點、砂漿攪拌機、管理人員辦公區(qū)設(shè)置水龍頭。根據(jù)工程需要隨時進場。The steel mesh fencing to be provided for construction area and office. Management of Construction General Plan Layout施工總平面管理將依據(jù)各施工階段的具體情況作動態(tài)管理,主要含以下方面:According to different construction stage’s situation, the dynamic control to be applied for the management of construction general plan layout. The details is as follows:,及時組織機械的進退場工作。Keep the site cleaning, safety devices and firefighting equipment should be provided and erected properly. The effective control should be strengthened for these installations.。The project management department shall manage the construction of the works according to the project regulations, exercise six basic functions of planning, organizing, directing, coordinating and controlling or supervising. The construction team with experience of undertaking similar works shall be selected to execute the works. 3.建立生產(chǎn)例會制度,每星期召開23次工程例會,圍繞工程的施工進度、工程質(zhì)量、生產(chǎn)安全等內(nèi)容檢查上一次例會以來的計劃執(zhí)行情況。The construction management plan to be optimized and executed to help the works pleting on schedule with good quality and safety.加強對項目施工的綜合管理,尤其是對施工組織、技術(shù)質(zhì)量安全、工程物資的調(diào)配等環(huán)節(jié)進行優(yōu)化管理。Work out monthly progress plan and weekly progress plan to ensue the construction schedule in different construction stages to be pleted on time.特殊施工階段實施24小時連續(xù)作業(yè),工人工作實行三班制。Based on the control point of absolute elevation on site provided by the Owner, three control points of elevation to be establ
點擊復(fù)制文檔內(nèi)容
環(huán)評公示相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1