【正文】
與主要表面之間往往有相互位置要求。這樣保證定位穩(wěn)定、準(zhǔn)確,裝夾工件往往也比較方便。的凹臺(tái)采用銑削加工;(4)φ8的螺紋孔,可先由φ7的麻花鉆鉆孔,再有φ8的絲攻攻絲所得。②外圓表面經(jīng)過(guò)半精車(chē)后的表面作為精基準(zhǔn),加工軸頸上的孔,達(dá)到位置度要求。這稱(chēng)之為互為基準(zhǔn)原則。這稱(chēng)之為基準(zhǔn)重合原則。在實(shí)際應(yīng)用中有時(shí)可以兼顧這四條原則,而夾具裝夾則不能同時(shí)兼顧,這就要根據(jù)具體情況抓住主要矛盾,解決主要問(wèn)題。為保證定位準(zhǔn)確,夾緊可靠,要求選用的粗基準(zhǔn)盡可能平整、光潔和有足夠大的尺寸,不允許有鍛造飛邊、鑄造澆、冒口或其它缺陷。粗基準(zhǔn)的選擇將影響的加工面和不加工面的相互位置,或影響到加工余量的分配,并且第一道加工工序首先要遇到基準(zhǔn)選擇問(wèn)題,因此正確選擇粗基準(zhǔn)對(duì)保證產(chǎn)品質(zhì)量將有重要影響。鑄件尺寸公差等級(jí)CT機(jī)械加工余量等級(jí)RMAG。(2)在螺紋孔上锪直徑φ23mm、深4mm、角度60176。縣分述如下: 以φ25 mm為加工表面這一組包括:φ25mm 外圓加工、30mm短軸端面。零件的分析 題目所給定的零件是十字軸零件又稱(chēng)十字節(jié),即萬(wàn)向接頭,英文名稱(chēng)universal joint,如圖21。 process planning。然后,根據(jù)零件的性質(zhì)和零件圖上各端面的粗糙度確定毛坯的尺寸和械加工余量。通過(guò)計(jì)算確定了切削余量和基本工時(shí),并制定了機(jī)械加工工藝過(guò)程卡片。7.第19天~21天,完成圖紙和說(shuō)明書(shū)的輸出打印。3.第8~10天,完成夾具總體方案設(shè)計(jì)(畫(huà)出草圖,與指導(dǎo)教師溝通,在其同意的前提下,進(jìn)行課程設(shè)計(jì)的下一步)。 1張7.課程設(shè)計(jì)說(shuō)明書(shū),包括機(jī)械加工工藝規(guī)程的編制和機(jī)床夾具設(shè)計(jì)全部?jī)?nèi)容。裝配圖出來(lái)后,由指導(dǎo)教師為學(xué)生指定需繪制的零件圖,一般為夾具體)。2.第3~7天,完成零件的工藝性分析,確定毛坯的類(lèi)型、制造方法,編制機(jī)械加工工藝規(guī)程和所加工工序的機(jī)械加工工序卡片。6.第16~18天,整理并完成設(shè)計(jì)說(shuō)明書(shū)的編寫(xiě)。參閱有關(guān)技術(shù)手冊(cè),制定了機(jī)械加工工藝路線,確定了各工序尺寸和加工余量。首先我們要熟悉零件和了解其作用,它位于車(chē)床變速機(jī)構(gòu)中,主要起換檔作用。夾具分析AbstractThrough the analysis of the cross shaft parts, in order to meet the processing requirements, determine the form of cross shaft. Refer to the technical manual, establishes the machining processes, each process to determine the size and the machining allowance. Cutting margin and the basic working hours were determined through calculation, and establishes the machining process card. In order to provide basis for production planning, scheduling, the operation of the workers, improve labor productivity, guaranteed the processing quality, reduce labor intensity, according to processing needs a set of engineering design fixture.This design is the cross shaft machining process planning and process equipment design, including the parts drawing, blank drawing, assembly drawing of a, machining process with the card and process card. First of all we must familiar with the parts and understand its role, it is located in the lathe speed institutions, mainly from the shift effect. Then, according to the nature of parts and ponents in the face of the map on t