【正文】
(計(jì)劃);總進(jìn)度規(guī)劃(計(jì)劃);由多個(gè)相互關(guān)聯(lián)的不同計(jì)劃功能的進(jìn)度計(jì)劃組成的計(jì)劃系統(tǒng); 建設(shè)工程項(xiàng)目進(jìn)度計(jì)劃系統(tǒng)建設(shè)工程項(xiàng)目進(jìn)度計(jì)劃系統(tǒng)是由多個(gè)相互關(guān)聯(lián)的進(jìn)度計(jì)劃組成的系統(tǒng),它是項(xiàng)目進(jìn)度控制的依據(jù)。在國(guó)際上,設(shè)計(jì)進(jìn)度計(jì)劃主要是各設(shè)計(jì)階段的設(shè)計(jì)圖紙(包括有關(guān)的說明)的出圖計(jì)劃,在出圖計(jì)劃中標(biāo)明每張圖紙的出圖日期。在工程施工實(shí)踐中,必須樹立和堅(jiān)持一個(gè)最近本的工程管理原則,即在確保工程質(zhì)量的前提下,控制工程的進(jìn)度[5]。施工方是工程實(shí)施的一個(gè)重要參與方,許許多多的工程項(xiàng)目,特別是大型重點(diǎn)建設(shè)工程項(xiàng)目,工期要求十分緊迫,施工方的工程進(jìn)度壓力非常大。從編制項(xiàng)目計(jì)劃開始,經(jīng)過實(shí)施過程中的跟蹤檢查,收集有關(guān)計(jì)劃實(shí)際執(zhí)行的信息,比較和分析項(xiàng)目計(jì)劃與實(shí)際執(zhí)行情況之間的偏差,找出產(chǎn)生原因和解決辦法,確定調(diào)整措施,再修改原項(xiàng)目計(jì)劃,形成一個(gè)封閉的循環(huán)系統(tǒng)[4]。分析偏差的原因,采取相應(yīng)的措施,調(diào)整原來計(jì)劃,使兩者在新的起點(diǎn)上重合,繼續(xù)按其進(jìn)行施工活動(dòng),并且盡量發(fā)揮組織管理的作用,使實(shí)際工作按計(jì)劃進(jìn)行。在控制中既要沿用前人的理論知識(shí),又要借鑒同類工程進(jìn)度管理的經(jīng)驗(yàn)和成果,還要根據(jù)本工程特點(diǎn)對(duì)進(jìn)度進(jìn)行創(chuàng)造性的科學(xué)管理。 項(xiàng)目進(jìn)度控制的特點(diǎn)工程項(xiàng)目具有規(guī)模大、建設(shè)的一次性和結(jié)構(gòu)與技術(shù)復(fù)雜等特點(diǎn),無論是進(jìn)度編制,還是進(jìn)度控制,均有它的特殊性,主要表現(xiàn)在:。為此,利用動(dòng)態(tài)學(xué)的觀點(diǎn),建立了對(duì)質(zhì)量、成本和進(jìn)度整體動(dòng)態(tài)控制的理念和方法,這對(duì)于在實(shí)際工程中縮短工期、提高工程質(zhì)量、降低成本具有重要的理論意義和實(shí)用價(jià)值。大部分工程項(xiàng)目在建設(shè)初期,對(duì)工程的質(zhì)量和成本控制得比較嚴(yán),質(zhì)量目標(biāo)和成本目標(biāo)也基本能夠?qū)崿F(xiàn),但這兩個(gè)目標(biāo)的實(shí)現(xiàn)往往是以進(jìn)度目標(biāo)為代價(jià)的。文章主要就工程進(jìn)度管理的影響因素進(jìn)行了分析,并對(duì)影響因素提出了具體的管理措施。construction stage 。施工項(xiàng)目進(jìn)度控制與投資控制和質(zhì)量控制一樣,是項(xiàng)目施工申的重點(diǎn)控制之一。做好施工階段的進(jìn)度控制管理對(duì)確保施工單位履行合同、工程按期竣工發(fā)揮著至關(guān)重要的作用。 關(guān)鍵詞:項(xiàng)目進(jìn)度控制 施工階段 進(jìn)度計(jì)劃IConstruction engineering project schedule controlAbstractThe progress of the project management of engineering project management is a very important job, which can reflect the project implementation status. Do a good job in the construction phase of the progress control management to ensure the construction unit to perform the contract, the project pleted on time plays a vital role in. Progress control of construction project investment control and quality control, is one of key control project construction claim. It is to ensure that the construction project pleted on schedule, the reasonable arrangement of resources supply, save the cost of important measures. However, at present in the construction project management is difficult to simultaneously achieve the quality, cost and schedule three big targets, the article focuses on the project progress control, from the system point of view, bined with the actual detailed project schedule control of management process.Key words:project schedule control。做好施工階段的進(jìn)度控制管理對(duì)確保施工單位履行合同、工程按期竣工發(fā)揮著至關(guān)重要的作用。施工項(xiàng)目進(jìn)度控制是指在既定的工期內(nèi),編制出最優(yōu)的施工進(jìn)度計(jì)劃,在執(zhí)行該計(jì)劃的施工中,經(jīng)常檢查施工實(shí)際進(jìn)度情況,并將其與計(jì)劃進(jìn)度相比較,若出現(xiàn)偏差,便分析產(chǎn)生的原因和對(duì)工期的影響程度,找出必要的調(diào)整措施,修改原計(jì)劃,不斷地如此循環(huán),直至工程竣工驗(yàn)收。在項(xiàng)目竣工后,綜觀質(zhì)量、成本和進(jìn)度三大目標(biāo)的實(shí)現(xiàn),往往是工期延長(zhǎng),質(zhì)量下降和成本增加。使工程進(jìn)度在計(jì)劃執(zhí)行中不斷循環(huán)往復(fù),直至按設(shè)定的工期目標(biāo)(項(xiàng)目竣工)即按合同約定的工期如期完成,或在保證工程質(zhì)量和不增加工程造價(jià)的條件下提前完成[1]。因此在進(jìn)度控制中要根據(jù)進(jìn)度目標(biāo)和實(shí)際進(jìn)度,不斷調(diào)整進(jìn)度計(jì)劃,并采取一些必要的控制措施,排除影響進(jìn)度的障礙,確保進(jìn)度目標(biāo)的實(shí)現(xiàn)。而進(jìn)度控制更要復(fù)雜,它要管理整個(gè)計(jì)劃系統(tǒng),而決不僅限于控制項(xiàng)目實(shí)施過程中的施工計(jì)劃。每一階段進(jìn)度完成后都要對(duì)照計(jì)劃作出評(píng)價(jià),并根據(jù)評(píng)價(jià)結(jié)果作出下一階段工作進(jìn)度安排。由于建設(shè)項(xiàng)目的單一性和一次性的特點(diǎn),進(jìn)度控制也是一個(gè)不可逆轉(zhuǎn)的工作,因而風(fēng)險(xiǎn)較大。當(dāng)項(xiàng)目計(jì)劃進(jìn)入執(zhí)行狀態(tài)時(shí),實(shí)際進(jìn)度按照計(jì)劃進(jìn)度進(jìn)行時(shí),兩者相吻合:當(dāng)實(shí)際進(jìn)度與計(jì)劃進(jìn)度不一致時(shí),便產(chǎn)生超前