【正文】
廠區(qū)樞紐三大部分。設(shè)計(jì)按照一定的程序,根據(jù)相關(guān)的地形、地貌、地質(zhì)、水文等原始資料和大量的設(shè)計(jì)規(guī)范,運(yùn)用工程類比法、方案比較法和試算法,在同時(shí)滿足防沖、防淤及施工、技術(shù)方面要求的基礎(chǔ)上,以明渠恒定流理論作為隧洞、渠道水力設(shè)計(jì)的基本依據(jù),擬定幾個(gè) 可能的方案,經(jīng)過技術(shù)經(jīng)濟(jì)比較,選定經(jīng)濟(jì)、安全、美觀,便于施工的最優(yōu)設(shè)計(jì)方案。主要任務(wù)是根據(jù)已定的流量來選定隧洞和渠道的斷面尺寸、糙率、縱坡、水深。 關(guān)鍵詞 糙率;水力半徑;水頭損失 The Design of Diversion Tunnel and Channel of MaBian Power Station Abstract This article is about the design of diversion tunnel and channel of diversion type hydropower station. It includes two major parts of the section design and structural design mainly. Design according to certain procedure, according to such firsthand information as relevant topography, landform , geology , hydrology ,etc. and a large number of design specifications, use the analogy law of the project , scheme parative law and try algorithms, on the basis of meeting to defending washing, defending the silt, specification requirement。 1設(shè)計(jì)方案與評(píng)價(jià) 本設(shè)計(jì)分為兩大步驟:一、斷面設(shè)計(jì);二、結(jié)構(gòu)設(shè)計(jì) 斷面設(shè)計(jì)(水力計(jì)算) 計(jì)算公式的選定 本設(shè)計(jì)中隧洞與渠道的總長(zhǎng)達(dá) 2020 多米,可以把水流作為均勻流分析,則水力坡度 J 等于道底坡 i, 那么謝才公式 : RJCV ? 或 RJACAVQ ?? ( 1)可以寫為 : RiCV? 或 RiACAVQ ?? ( 2) ,采 用曼寧公式 : 611 RnC ?? ( 3) 把( 3)代入( 2)中得到: 32211 RAinQ ???? (4) 式中 Q—— 流量, m3/s; R—— 水力半徑, m; n—— 糙率,按規(guī)范選取; A—— 過水面積, A=b h, m2; i—— 隧洞或渠道底坡 根據(jù)要求, Q=, n為糙率,是衡量隧洞渠道壁面粗糙情況的綜合性系數(shù)。因?yàn)榱髁啃?,相?yīng)的水力半徑較大,糙率較大。 計(jì)算確定斷面尺寸 選定底坡 i 的取值 根據(jù)《小型水力發(fā)電站設(shè)計(jì)規(guī)范》(試行) GBJ71— 84,無壓引水隧洞底坡可選用 1‰~ 2‰的單一底坡。由于隧洞和渠道合計(jì)達(dá) 2020 多米長(zhǎng),使開挖方量大大增加,同時(shí)相應(yīng)的水力損失卻減小不多, 以內(nèi)的水頭不影響裝機(jī)容量,選取 i=1/500,減少開挖面積,也更加經(jīng)濟(jì)、美觀。 164 表 3 b、 h 的比較與選擇 b(m) h(m) e(m) △ h(m) S 總 (m2) S 凈 (m2) R(m) Q(m3/s) X V(m/s) 22% 15% 15% 15% 15% 15% 15% 17% 18% 19% 注: 表中 e 為凈空高, X 為凈空比 上表的計(jì)算是建立在底坡為 1/500,糙率為 基礎(chǔ)之上的