freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

工業(yè)工程外文翻譯--裝配線平衡問(wèn)題的求解方法淺析-全文預(yù)覽

  

【正文】 e heredity algorithm and the industrial engineering method these four solutions assembly line balance question typical method has separately made the brief analysis, has pointed out each algorithm good and bad points and the application situation. The assembly line balance question is a kind of typical separate bination optimization question, regarding is in particular stochastic, the multi goals assembly line balance question, uses the appropriate method in some kind of degree all to be able to obtain the satisfactory solution. While which solves using the optimized method, nearly all used the simulation technology, along with the puter technology development, carries on two times of developments in the present existing software package foundation, established the visible hypothesized simulation assembly system, realized the assembly line dynamical equilibrium effect, will be worth further studying and the discussion. At present, the assembly line balance question mostly concentrates in the discussion single scroll assembly line time balanced question, along with the fast changeable market and customer39。s trust and the wele, and is widely applied to each domain. Its production mainly is for overe the realistic modeling the difficulty, provides one kind of more effective policymaking tool Compares with the optimized method, the heuristic method merit mainly has: The logical model approaches to the reality, the flow chart establishment in the foundation which the policymaker experiences, therefore the heuristic method is concealing the multi goals plan。s tying conditions are the all lines and superior to turn a problem. The line programming is the superior to turn one of the important categories in the problem realm, making use of the line programming method to solve an ALB problem is in 60s in 20 centuries waited for someone by Bowman EH to put forward, its stipulation condition and target function establishment easy, but the operation measure very greatly, with actual the circumstance differ more and far. After some scholars39。 The minimum work station given to settle assembly line number, make the rhythm of assembly line minimum, to already exist of the production line carry on adjust excellent turn。 1 畢業(yè)設(shè)計(jì) (論文 )英文翻譯 學(xué)生姓名: 蔣偉偉 學(xué) 號(hào): 2203080128 所在學(xué)院: 經(jīng)濟(jì)與管理學(xué)院 專 業(yè): 工業(yè)工程 設(shè)計(jì) (論文 )題目: 好孩子推車(chē)事業(yè)部總裝線生產(chǎn)線優(yōu)化設(shè)計(jì) 指導(dǎo)教師: 蔣南云 2020 年 4 月 25 號(hào) 2 The Methods for Solving the Problem of Balancing an Assembly Line Currently, along with the market changing, some forerunners production mode got an extensive application in the manufacturing industry. How raise a whole efficiency of assemblin g the production line, reduce a work preface in the ware, and pursue to synchronize production is valued by more and more people. The production of manufacturing industry is most likely after carrying on subdividing to turn of have another a work preface flowing water to turn a continuous homework production line, at this time because of division of homework, the time of each work preface operates can39。s production efficiency of the car assembly line. The
點(diǎn)擊復(fù)制文檔內(nèi)容
畢業(yè)設(shè)計(jì)相關(guān)推薦
文庫(kù)吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1