【正文】
(2) 一個(gè)標(biāo)有標(biāo)書信息的單獨(dú)信封應(yīng)該包括:i) A schedule of proposed subcontractors indicating a list of the major sections and appropriate value of the work for which the bidder proposes to use subcontractors, together with the names of the proposed subcontractors and statements of their capabilities and similar works executed。3)一份有名字的工程安排表,被提及的高科技和管理層的資質(zhì)和經(jīng)驗(yàn)應(yīng)在工程上簽字。5)一份詳細(xì)的投標(biāo)人計(jì)劃的工程名稱的質(zhì)量管理系統(tǒng),被提及的質(zhì)量管理事項(xiàng)的資質(zhì)和經(jīng)驗(yàn)。(b) be clearly marked as follows: “Bid for the 400 Bed Hospital at Suleimaniyeh Northern Iraq. Do not open before bid closing time and date.” In addition to the identification required above, the inner envelopes shall indicate the name and address of the bidder to enable the bid to be returned unopened in case it is declared late. If the outer envelope is not sealed and marked as above, the Employer will assume no responsibility for the misplacement or premature opening of the bid. If the outer envelope discloses the bidder39。 representatives who are present shall sign a register evidencing their attendance. Envelopes marked WITHDRAWAL and SUBSTITUTION shall be opened first and the name of the bidder shall be read out. Bids for which an acceptable notice of withdrawal has been submitted shall not be opened. The bidders39。 (b) is acpanied by the required securities。s rights or the bidder39。b) excluding Provisional Sums and the provision, if any, for Contingencies in the Summary Bill of Quantities, but including Daywork, where priced petitively。s The Employer reserves the right to accept or reject any Right to Accept any bid, and to annul the bidding process and reject Bid and to Reject all bids, at any time prior to award of contract, without any or all Bids thereby incurring any liability to the affected bidder orbidders or any obligation to inform the affected bidder or bidders of the grounds for the Employer39。 and d) making an allowance for varying times for pletion offered by bidders, if different from that specified in the Bidding Documents and in the manner decided by the Employer. The Employer reserves the right to accept or reject any variation, deviation, or alternative offer. Variations, deviations, alternative offers, and other factors that are in excess of the requirements of the bidding documents shall not be taken into account in bid evaluation. If the bid, which results in the lowest Evaluated Bid Price, is seriously unbalanced or front loaded in relation to the Engineer39。 or (c) whose rectification would affect unfairly the petitive position of other bidders presenting substantially responsive bids. If a bid is not substantially responsive, it will be rejected by the Employer, and may not subsequently be made responsive by correction or withdrawal of the nonconforming deviation or reservation. and Bids determined to be substantially responsive will be Errors checked by the Employer for any arithmetic errors. Errors will be corrected by the Employer as follows:(a) where there is a discrepancy between the amounts in figures and in words, the amount in words will govern。 and (d) provides any clarification and/or substantiation that the Employer may require to determine responsiveness pursuant to SubClause . A substantially responsive bid is one that conforms to all the terms, conditions, and specifications of the bidding documents without material deviation or reservation. A material deviation or reservation is one (a) which affects in any substantial way the scope, quality, or performance of the Works。s processing of bids or award decisions may result in the rejection of the bidder39。s modification, substitution, or withdrawal notice shall be prepared, sealed, marked, and delivered in accordance with the provisions specified for submission of bids, with the outer and inner envelopes additionally marked MODIFICATION or WITHDRAWAL, as appropriate. No bid may be modified by the bidder after the deadline for submission of bids, except in accordance with the provisions for correction of errors specified in the Instructions to Bidders. Withdrawal of a bid during the interval between the deadline for submission of bids and expiration of the specified period of bid validity may result in the forfeiture of the bid security.E. Bid Opening and Evaluation22. Bid Opening The Employer will open the bids, in the presence of bidders39。11. Bid Prices Unless stated otherwise in the bidding documents, the contract shall be for the whole Works as described in SubClause , based on the unit rates and prices in the Bill of Quantities submitted by the bidder. The bidder shall fill in rates and prices for all items of the Works described in the Bill of Quantities. Items against which no rate or price is entered by the bidder will not be paid for by the Employer when executed and shall be deemed covered by the rates for other items and prices in the Bill of Quantities. All obligations by the Contractor under the contract, shall be included in the rates and prices and the total Bid Price submitted by the bidder. Unless otherwise provided in the Contract, the rates and prices quoted by the bidder are deemed to be fixed rates and prices and shall not be subject to adjustment during the performance of the contract. 12. Currencies The currency of the bid shall be the US Dollar. of Bid Payment The Bid price and the unit rates and the prices shall be quoted by the bidder entirely in the currency of the bid specified above. 13. Bid Bids shall remain valid for the period stipulated in the Validity Bidding Documents. In exceptional circumstances, prior to expiry of the original bid validly period, the Employer may request that the bidders extend the period of validity for a specified additional period. The request and the responses thereto shall be made in writing. A bidder may