【正文】
Contract. Reception of the down payment is the mark of mencement of design work for the designer. If the down payment is not received, the designer is entitled to put off the time of mencement of design work, and postpone accordingly the time of delivery of documents. The Employer should pay charges for design to the Designer at the amount and date provided in this Contract. For each day of overdue payment, 2‰ of the overdue payment shall be paid as damages for overdue payment and the time for delivery by the Designer shall be extended accordingly. Where the delay of payment has exceeded 30 days, the Designer shall have the right to suspend the performance of the work at the next stage and give written notice to the Employer. In case the higher authority or petent department of design 12 approval would not approve the design documents or the engineering construction of this contract is suspended or stopped, the Employer should pay the payable charges for design. The employer requests the designer should deliver the design documents ahead of the time specified by the Contract, it shall need the approval of the designer, and shall not deviate gravely from the rational design period, and the employer shall pay for the crashing charge. The Employer should offer conveniences in aspects of working, living and traffic and necessary laborprotection equipments. The Employer shall be responsible for the national standard drawing, ministerial standard drawing and local standard drawings. The Employer shall bear the expenses for receiving foreign expert in charge of the engineering to the Designer39。 承擔(dān)本項(xiàng)目外國專家來設(shè)計(jì)人辦公室工作的接待費(fèi)(包括傳真、電話、復(fù)印、辦公等費(fèi)用)。逾期超過 30 天以上時(shí),設(shè)計(jì)人有權(quán)暫停履行下階段工作,并書面通知發(fā)包人.發(fā)包人的上級或設(shè)計(jì)審批部門對設(shè)計(jì)文件不審批或本合同項(xiàng)目停緩建,發(fā)包人均應(yīng)支付應(yīng)付的設(shè)計(jì)費(fèi)。 在合同履行期間,發(fā)包人要求終止或解除合同,設(shè)計(jì)人未開始設(shè)計(jì)工作的,不退還發(fā)包人已付的定金;已開始設(shè)計(jì)工作的,發(fā)包人應(yīng)根據(jù)設(shè)計(jì)人已進(jìn)行的實(shí)際工作量,不足一半時(shí),按該階段設(shè)計(jì)費(fèi)的一半支付;超過一半時(shí),按該階段設(shè)計(jì)費(fèi)的全部支付。發(fā)包人不得要求設(shè)計(jì)人違反國家有關(guān)標(biāo)準(zhǔn)進(jìn)行設(shè)計(jì)。 Article 7 Expenditure It is agreed between both parties that the design fee under this contract is calculated and charged according to the document (2020) Design Prices. The charging basis and method are in accordance with relevant national and local provisions, and will be determined by both parties through negotiation, if there is no relevant national or local provision. If the above expense is estimated design fee, both parties shall check the design fee as per the approved budgetary estimate of the preliminary design, after the examination and approval of preliminary design. During the construction of this project, if there is any adjustment in budgetary estimate, the design fee will also be adjusted correspondingly. 8 第八條 支付方式 本合同生效后三天內(nèi),發(fā)包人支付設(shè)計(jì)費(fèi)總額,計(jì) 16 萬元作為定金(合同結(jié)算時(shí),定金抵作設(shè)計(jì)費(fèi))。 Article 4 Name, Scale, Phase, Investment and design Content for the Contract Items (fill in based on industry characteristics) 10KV Star Mall Plaza 1 Substation New Construction Electric and 10KV inlet wire of the substation The substation is underground, with six 1,600KVA transformers and two 6 1,250KVA transformers inside. The 10KV power line is laid along the new cable roads of Quangong Substation and Ligong Substation respectively, toward the customer substation with cables. 第五條 發(fā)包人向設(shè)計(jì)人提交的有關(guān)資料、文件及時(shí)間 本工程供電方案 1 份 2020225 用電負(fù)荷資料 1 份 2020225 Article 5 Relevant materials, documents and time submitted to the designer by the employer Power supply scheme of this project 1 25 February, 2020 Electricity load data 1 25 February, 2020 第六條 設(shè)計(jì)人向發(fā)包人交付的設(shè)計(jì)文件、份數(shù)、地點(diǎn)及時(shí)間 設(shè)計(jì)圖紙 8 份 20200415 概算書 6 份 20200415 注:待發(fā)包人結(jié)清全部設(shè)計(jì)費(fèi)后,由設(shè)計(jì)人將設(shè)計(jì)文件交付沈陽供電公司客戶工程部 Article 6 Documents, number of copies, location and time submitted to the employer by the designer Design drawing 8 copies 15 April, 2020 Book of estimates 6 copies 15 April, 20