【正文】
ine for the leading cadres, does not cover all Party members. Based on the above situation, need to the criterion of a clean and honest administration and rule the two is likely to be more relevant regulations first amendment. By revising, really put the authority of Party discipline, the seriousness in the party tree and call up the majority of Party members and cadres of the party constitution of party passes party consciousness. (II) two party regulations revision process the Central Committee of the Communist Party of China attaches great importance to two regulations revision . Xi Jinping, general books recorded in the Fifth Plenary Session of the eighth session of the Central Commission for Discipline Inspection, on the revised regulations made clear instructions. According to the central deployment, the Central Commission for Discipline Inspection from 2022 24under six months begin study two regulations revision. The Standing Committee of the Central Commission for Discipline Inspection 4 review revised. Comrade Wang Qishan 14 times held a special meeting to study two regulations revision, amendment clarifies the direction, major issues of principle, path and target, respectively held a forum will listen to part of the province (area) secretary of the Party mittee, Secretary of the Discipline Inspection Commission, part of the central ministries and state ans Department The first party mittee is mainly responsible for people, views of experts and scholars and grassroots party anizations and Party members. Approved by the Central Committee of the Communist Party of China, on 7 September 2022, the general office of the Central Committee of the Party issued a notice to solicit the provinces (autonomous regions, municipalities) Party, the central ministries and missions, state ministries and missions of the Party (party), the General Political Department of the military, every 3 people anization of Party of two regulations revision opinion. Central Commission for Discipline Inspection of extensive solicitation of opinions, careful 25study, attracting, formed a revised sent reviewers. In October 8 and October 12, Central Committee Political Bureau Standing Committee and the Political Bureau of the Central Committee After consideration of the two regulations revised draft. On October 18, the Central Committee of the Communist Party of China formally issued two regulations. Can say, two laws amendment concentrated the wisdom of the whole party, embodies the party. Second, code and Regulations revision of the basic principles of two party regulations revision work and implement the party39。 the second is concisely positive advocated by the lack of prohibited provisions excessive, no autonomy requirements。 follow the correct direction, grasp the limited goals, adhere to the party39。 rule around the party discipline, disciplinary ruler requirements, listed as negative list, focusing on vertical gauge, draw the party anizations and Party members do not touch the bottom line . Here, the main from four square face two party rules of interpretation: the first part introduces two party Revised regulations the necessity and the revision process。 監(jiān)理部針對混凝土施工、養(yǎng)護、維護和照管等過程所發(fā)布的有關混凝土專業(yè)的指示、通知和批復等文件均應作為本細則的補充。分部(分項)工程質量等級評定為“優(yōu)良” ,其單元工程優(yōu)良率必須大于或等于 50%;⑵ 施工承包單位和監(jiān)理單位在施工過程中對施工質量進行檢測和抽樣試驗資料所反映的工程總體質量;⑶ 對隱蔽工程特殊分項工程驗收的質量評價;⑷ 聯(lián)合驗收組現(xiàn)場檢查驗收的質量評價。完成以上工作后提請監(jiān)理部組織驗收。入倉混凝土質量主要由監(jiān)理檢驗試驗室通過對澆筑單元混凝土配合比審簽、機口混凝土料檢查,以及取樣成型試驗后評定。⑶ 混凝土單元工程質量評定內容和評定時間按施工工序,分基礎面或混凝土施工縫面處理、模板安裝、鋼筋制安、預埋件系統(tǒng)(止水片、伸縮縫材料、排水設施、冷卻及接縫灌漿管路、鐵件、接地系統(tǒng)敷設及內部觀測儀器) 、混凝土澆筑和混凝土表面質量六大工序,依據(jù)每個工序質量標準檢驗。② 在六大工序質量全部達到合格的基礎上,若混凝土澆筑、鋼筋、表面(外觀)質量三項達到優(yōu)良,其余三項中一項或一項以上達到優(yōu)良,則該混凝土單元工程即評為優(yōu)良,否則評為合格。對工程施工承包合同文件技術規(guī)范有特殊要求的,按其要求或規(guī)定的標準執(zhí)行。 混凝土工程質量事故對于施工中發(fā)生的質量事故,監(jiān)理部應督促施工單位立即查明其范圍、數(shù)量、性質、原因等,并以質量事故報告單形式,及時向監(jiān)理部報告,經監(jiān)理部批準后,方可進行處理。⑷ 鉆孔孔位平面尺寸誤差不大于177。檢查方法分為壓水檢查、抽水檢查、鉆孔取芯及芯樣試驗、物探檢查等。 混凝土密實性檢查⑴ 混凝土密實性檢查主要以鉆孔檢查為主,物探檢查為輔。在準備的部位濕潤以后,應用干凈純水泥漿在該區(qū)域涂刷一遍,然后按監(jiān)理工程師要求的預縮砂漿或混凝土進行回填修補。(2) 混凝土表面缺陷處理① 凸出于規(guī)定表面的不平整表面應當用鑿子、鑿石錘找平,用砂輪打磨光滑。檢查項目包括表面外露鋼筋頭、管件頭,表面蜂窩、麻面、氣泡密集區(qū),錯臺、掛簾,表面缺損,非受力鋼筋外露,小孔洞、單個氣泡、表面裂縫等項內容。養(yǎng)護材料及養(yǎng)護方法需得到監(jiān)理機構的批準后方可使用。⑵ 混凝土溫控要求① 蝸殼混凝土溫控要求夏季施工時,混凝土澆筑溫度不超過 20℃,最高溫渡不大于 43℃;冬季施工,在混凝土澆筑溫度能夠低于 18℃的情況下,可以采用自然入倉的混凝土澆筑,最高溫升溫渡 41℃;如以上最高溫度控制難以滿足,應輔以通水冷卻等措施。以保證混凝土澆筑質量為前提,盡量減少停倉帶來的不利影響。④ 混凝土澆筑過程中發(fā)生下述情況之一時,現(xiàn)場旁站監(jiān)理應立即指令暫停下料,在向施工方說明建議停倉原因后要求其做好停倉前的各項準備工作。? 未經監(jiān)理同意不按照倉面設計施工;? 澆筑倉內出現(xiàn)積水而不能及時排除;? 遇基巖滲水未及時采取措施進行引、排處理;? 露天部位施工遇大暴雨、或中雨天氣不能及時排除積水;? 振搗能力小于入倉強度;? 受損予埋件未修復;? 澆筑部位出現(xiàn)骨料分離未及時處理;? 臺階法施工時臺階不清晰,臺階過窄甚至出現(xiàn)滾澆;? 一般性模板跑模;? 遇其它可能影響工程質量或安全的情況。h、對于止水片周圍振搗棒不便進去的地方,要求施工隊組織工人用鋼釬進行人工振搗;頂拱澆筑時,人員無法進入的地方,要求長柄振搗器,伸入倉內進行振搗。若能重塑者(重塑標準:用振搗器振搗 30s,周圍 10cm 范圍內能泛漿且不留孔洞者) ,仍可繼續(xù)澆筑混凝土,如自己不能判斷是否初凝,須向當班項目監(jiān)理工程師匯報。b、進入倉內的混凝土隨澆隨平倉,不得堆積,不得以振搗器平倉代替振搗,平倉后應按順序依次振搗。b、檢查入倉混凝土的外觀質量,并按規(guī)定抽測入倉溫度,若發(fā)現(xiàn)混凝土質量不符合要求(如坍落度偏大或偏小、混凝土泌水嚴重、溫度超標等) ,應及時與拌和樓監(jiān)理取得聯(lián)系,要求進行調整,不合格料嚴禁入倉。當上述問題已經檢查落實,符合開倉條件時,方可允許混凝土入倉。在混凝土澆筑整個過程中,旁站監(jiān)理工程師應做的工作包括混凝土澆筑前的檢查、混凝土入倉的檢查、混凝土澆筑過程的檢查和質量記錄。單元工程具備安裝條件后及時通知監(jiān)測單位進行安裝調試,合格后簽署“安裝合格證明” ,一式兩份,交土建施工單位一份,作為監(jiān)理開倉的必查資料,防止觀測儀器漏安。 排水設施安裝排水設施安裝主要檢查材料是否滿足設計要求;材料加工是否滿足設計要求的形式尺寸、是否進行必要的防腐處理;排水管安裝是否牢固、排水管(口)孔位偏差、傾斜度偏差和深度偏差是否滿足要求;安裝完成后進行通水檢查,主要檢查管材、焊接處及接頭處是否有滲、漏水現(xiàn)象,管路是否通暢;驗收合格后簽署《排水設施安裝質量評定表》附表7。⑼ 為防止止水(漿)片(帶)兩側模板產生不同變形,止水(漿)片(帶)的圍柃采用“賫” (或“∧” )形連接,使模板圍柃面為整體結構。⑹ 止水銅片的凹槽部位須用瀝青麻絲填實,充填材料宜先預制,安裝時應嚴格保證凹槽部位與伸縮縫位置一致,騎縫布置。⑷ 紫銅片和塑料片宜采用由廠家注塑定型產品,接頭應采用栓接法(塑料片包紫銅片),栓接長度不小于 35cm。不允許有拉筋、鋼筋或其它鋼結構與止水相碰接。 預埋件系統(tǒng)工序質量控制 埋件系統(tǒng)包括止水安裝、伸縮縫材料安裝、排水設施安裝、冷卻及接縫灌漿管路安裝、鐵件安裝、內部觀測儀器安裝、接地系統(tǒng)敷設,在單元工程驗收過程中,存在上述工序的,進行質量檢查和評定,發(fā)生的工序經匯總后作為預埋件系統(tǒng)工序進行統(tǒng)一質量評定,簽署《預埋件工序質量評定表》附表 12。⑺ 出線豎井、壓力管道等豎井部位應采用整體滑升模板。襯板應為質量優(yōu)良、表面平整的五夾板。⑷ 尾水閘墩、各類廊道頂拱、巖錨梁等應采用定型鋼模板,廊道側墻應采用大型鋼模板。驗收合格后簽署《混凝土模板工序質量評定表》附表面 4。當施工單位提出套筒連接接頭驗收,并提交驗收單后,應對現(xiàn)場進行套筒外觀檢查,若外觀不合格,則要求施工單位繼續(xù)處理,直至合格;當外觀檢查合格后,應取一組套筒連接接頭進行試驗,試驗合格,則該批套筒連接接頭合格;試驗時只要有 1 個套筒連接接頭被拉裂或拉斷或