【正文】
chine to be provided before the containers )No stillages to be packed over 2 )Stillages to be packed with the appropriate number of hold down straps for the weight of the items and if possible, secured to the walls of the container to prevent any movement during )Electrical requirements: three phase wires for motors to have actives RED, BLUE amp。 WHITE, neutral BLACK and earth YELLOW WITH GREEN ensure that no 4 core cable is supplied for the antidrop Australia we cannot have 24V and 240V in the same cable so we need 2 core power cables for locks must be double )Instruction manual, mechanical and electrical drawings and packing lists(IN ENGLISH)to be provided as soon as plete by Hsiang Gu in order to not delay numbers will be marked on the signed items need to be packed and labeled )Hsiang Gu to provide 5% extra of all nuts, bolts and fixings, 5% extra chains and any other small item