【正文】
ABSTRACT This design book consists of three parts: the general part, the special part and the translation part. The general part is the eastern peak mine 1800000 tons Nii ventilation safety design. It consists of five chapters: an overview of Ida mining area and geological features, Ida fe, the mining method and the zone of roadway layout, mine and mine safety technology measure. Dongfeng mine is located in Shanxi Province, Gaoping City, mine total area is 17 square kilometers, mine the main coal seam No. 3coal seam, the average thickness is , angle averaged 4 degrees, mine industrial reserves125900000 tons, recoverable reserves is 98520xx0tons, mine of normal water inflow is200 3/mh, the maximum inflow is300 3/mh, 3/minm mine absolute gas emission rate, relative gas emission rate 3/mt, so it is a low gas mine. Dongfeng mine Nii designed annual production capacity of 1800000 t/a, length of service . Working system of three eight. Coal mine mining method for long wall fully mechanized top coal caving mining. Explore the way for the inclined shaft with single level development, a level of +660m. Mine layout of a working face production, an excavation working face, the annual production capacity of 1800000t/a. Face length is 150 m. Coal transportation mode for continuous tape transport。礦井通風(fēng)方法為抽出式通風(fēng),風(fēng)井布置方式為兩翼對(duì)角式。開(kāi)拓方式為斜井單水平開(kāi)拓,水平標(biāo)高為 +660m。 玉溪礦位于山西省高平市,礦井總面積是 17 平方千米,礦井主采煤層是 3號(hào)煤層,平均厚度是 , 傾角平均 4 度,礦井的工業(yè)儲(chǔ)量是 12590 萬(wàn)噸,可采儲(chǔ)量是 9852 萬(wàn)噸,礦井的正常涌水量是 200 3/mh,最大涌水量是 300 3/mh,礦井絕對(duì)瓦斯涌出量 3/minm ,相對(duì)瓦斯涌出量 3/mt,所以它是一個(gè)低瓦斯礦井。 翻譯部分: 題目為 “ Model development and analysis” 翻譯 要求: 譯文字?jǐn)?shù)不少于 3000 字,語(yǔ)句通順、完整,語(yǔ)義準(zhǔn)確 。 一般設(shè)計(jì)部分: 題目為 玉溪 礦 180 萬(wàn) t/a 新井通風(fēng)安全設(shè)計(jì)。主要內(nèi)容包括礦區(qū)概述及井田地質(zhì)特征,井田開(kāi)拓,采煤方法及帶區(qū)巷道布置,礦井通風(fēng),礦井安全技術(shù)措施部分。 院長(zhǎng)簽字: 指導(dǎo)教師簽字: 中國(guó)礦業(yè)大學(xué)畢業(yè) 設(shè)計(jì) 指導(dǎo)教師評(píng)閱書 指導(dǎo)教師評(píng)語(yǔ) ( ① 基礎(chǔ)理論及基本技能的掌握; ② 獨(dú)立解決實(shí)際問(wèn)題的能力; ③ 研究?jī)?nèi)容的 理論依據(jù)和技術(shù)方法; ④ 取得的主要成果及創(chuàng)新點(diǎn); ⑤ 工作態(tài)度及工作量; ⑥ 總體評(píng)價(jià)及建議成績(jī); ⑦ 存在問(wèn)題; ⑧ 是否同意答辯等): 成 績(jī): 指導(dǎo)教師簽字: 年 月 日 中國(guó)礦業(yè)大學(xué)畢業(yè) 設(shè)計(jì) 評(píng)閱教師評(píng)閱書 評(píng)閱教師評(píng)語(yǔ) ( ① 選題的意義; ② 基礎(chǔ)理論及基本技能的掌握; ③ 綜合運(yùn)用所學(xué)知識(shí)解決實(shí)際問(wèn)題的能力; ④ 工作量的大小; ⑤ 取得的主要成果及創(chuàng)新點(diǎn); ⑥ 寫作的規(guī)范程度; ⑦ 總體評(píng)價(jià)及建議成績(jī); ⑧ 存在問(wèn)題; ⑨ 是否同意答辯等 ): 成 績(jī): 評(píng)閱教師簽字: 年 月 日 中國(guó)礦業(yè)大學(xué)畢業(yè) 設(shè)計(jì) 評(píng)閱教師評(píng)閱書 評(píng)閱教師評(píng)語(yǔ) ( ① 選題的意義; ② 基礎(chǔ)理論及基本技能的掌握; ③ 綜合運(yùn)用所學(xué)知識(shí)解決實(shí)際問(wèn)題的能力; ④ 工作量的大??; ⑤ 取得的主要成果及創(chuàng)新點(diǎn); ⑥ 寫作的規(guī)范程度; ⑦ 總體評(píng)價(jià)及建議成績(jī); ⑧ 存在問(wèn)題; ⑨ 是否同意答辯等 ): 成 績(jī): 評(píng)閱教師簽字: 年 月 日 中國(guó)礦業(yè)大學(xué)畢業(yè) 設(shè)計(jì) 答辯及綜合成績(jī) 答 辯 情 況 提 出 問(wèn) 題 回 答 問(wèn) 題 正 確 基本 正確 有一般性錯(cuò)誤 有原則性錯(cuò)誤 沒(méi)有 回答 答辯委員會(huì)評(píng)語(yǔ)及建議成績(jī): 答辯委員會(huì)主任簽字: 年 月 日 學(xué)院領(lǐng)導(dǎo)小組綜合評(píng)定成績(jī): 學(xué)院領(lǐng)導(dǎo)小組負(fù)責(zé)人: 年 月 日 摘 要 本設(shè)計(jì)包括三個(gè)部分:一般部分、專題部分和翻譯部分。 玉溪礦新井設(shè)計(jì)年生產(chǎn)能力為 180 萬(wàn) t/a,服務(wù)年限為 。礦井布置一個(gè)工作面生產(chǎn),一個(gè)掘進(jìn)工作面,年生產(chǎn)能力為 180 萬(wàn) t/a。 專題部分主要 是對(duì)煤與瓦斯突出的預(yù)防與治理進(jìn)行分析 。 auxiliary transport adopts stepless rope continuous tractor transport personnel, material and gangue. Mine ventilation way out for ventilation, ventilation shaft arrangement for the two wings of diagonal. The projects section is mainly to coal and gas outburst prevention and control are analyzed. Through the analysis of coal and gas outburst and the level of division, mainly in the research and the basis of summarizing predecessors39。 Coal mining method。 大巷運(yùn)輸設(shè)備的選擇 ................................................................. 錯(cuò)誤 !未定義書簽。 帶區(qū)煤層特征 ........................................................................... 錯(cuò)誤 !未定義書簽。 煤層的主要地質(zhì)構(gòu)造 .............................................................. 錯(cuò)誤 !未定義書簽。 確定帶區(qū)區(qū)段平巷、區(qū)段集中巷之間聯(lián)絡(luò)巷道形式,位置和布置方式 錯(cuò)誤 !未定義書簽。 帶區(qū)內(nèi)各種巷道掘進(jìn)方法 ....................................................... 錯(cuò)誤 !未定義書簽。 回采巷道布置 .......................................................................................................... 34 4 礦井通風(fēng) ...................................................................................................................................... 36 礦井通風(fēng)系統(tǒng)選擇 ........................................................................................................... 36 礦井通風(fēng)系統(tǒng)的設(shè)計(jì)原則及考慮因素 ................................................................... 36 礦井概況 ................................................................................................................... 36 帶區(qū)通風(fēng) ........................................................................................................................... 42 帶區(qū)通 風(fēng)總體要求 ................................................................................................... 42 帶區(qū)通風(fēng)的基本要求 ............................................................................................... 42 工作面通風(fēng)方式 ....................................................................................................... 43 掘進(jìn)通風(fēng) ........................................................................................................................... 45 掘進(jìn)通風(fēng)方法 ......................................................................................................... 45 掘進(jìn)面需風(fēng)量計(jì)算 ................................................................................................. 46 掘進(jìn)面的設(shè)計(jì) ......................................................................................................... 48 礦井需風(fēng)量 ....................................................................................................................... 50 礦井需風(fēng)量計(jì)算的標(biāo)準(zhǔn)及原則