【正文】
_____日將保兌的,不可撤銷的,可轉(zhuǎn)讓可分割的即期信用證開到賣方。 Force Majeure: Either party shall not be held responsible for failure or delay to perform all or any part of this agreement due to flood, fire, earthquake, draught, war or any other events which could not be predicted, controlled, avoided or overe by the relative party. However, the party affected by the event of Force Majeure shall inform the other party of its occurrence in writing as soon as possible and thereafter send a certificate of the event issued by the relevant authorities to the other party within 15 days after its occurrence. 18 仲裁: 在履行協(xié)議過(guò)程中,如產(chǎn)生爭(zhēng)議,雙方應(yīng)友好協(xié)商