【正文】
s upright and foursquare.第二章 鋼筋混凝土框架、排架結(jié)構(gòu) Chapter 2 Reinforced Concrete Framework and Bent Frame Structure1工藝示范圖:Demonstration Pictures of Technology 汽機(jī)基座外觀 i. Appearance of frame columns for fixed ends of He Yuan Power Plant in Guangdong Province。 bolts holes are in rows and in lines。 ii. Symmetry arrangement for the formwork is regular。 settingout is the premise that ensures the external dimensions of foundation structures to satisfy the designing requirements, so there will be accidents if any problems occur。Principally controlled critical parts of the construction procedures: positionsetting amp。 settingout, dismantling amp。 therefore, close attention should be paid to control this in the process of construction: Dismantling amp。 iii. Adopt scaffolding tubes of uniform thickness for stuffing outside the formwork。 ii. The edge joints of bulkmass concrete formwork are regular, and the edge angle is upright amp。 ii. Appearance of trestle frame work of He Yuan Power Plant in Guangdong Province。 maintenance and polishing of corners after layingoff, rising of arch for steel truss, arrangements of bolts holes being straight and regular, deformation controlling and rectification in the process of assembly welding, and no welding of crossover tubes and pipes interfaces until settingout and cutting of horseshoe orifice.工藝示范圖: Technology Demonstation: 、鋼梁平整順直 、防腐美觀i. Increase wrapping where the conduit pipes pass through the steel retainer。 pleasing to the eye.第四章 砌筑工程 Chapter 4 Masonry Works施工工藝控制要點(diǎn)Controlling Essentials of Construction Technology砌筑工藝控制的要點(diǎn)是正確的掛線保證垂直度;合理的砌筑方式保證灰縫;構(gòu)造柱、圈梁、加筋帶的正確留設(shè)保證砌體整體剛度;門窗洞口的正確留設(shè)和封堵。 correct setting and sealingup of doors and windows’ holes.某工地砌筑掛線工藝settingout technology of masonry in some construction site,采用合適的砌磚方式 as per the requirements of drawings, adopt appropriate masonry manners. strictly control mortar joints and reserve masonry raft、圈梁、過梁、配筋帶嚴(yán)格按照?qǐng)D紙?jiān)O(shè)計(jì)及規(guī)范要求進(jìn)行施工。Technical essentials of plastering works: masonry works is the basis of wall quality, so it is requested to implement masonry works strictly as per the specifications。It is a must to implement ash cake, screed strip, assuring the wall surface even amp。ade pleasing to the eye。2工藝示范圖:Demonstation of Technology,垂直度控制好 i. dimension of windows opening is regular and control the verticality。 If the plate thermal insulating segments require having exhaust passage setting connected to the air, it should be done setting in the points of exhaust passage of mesh division joints for mortar screed coat. 卷材防水施工要點(diǎn)Essentials of Coiled Material Water Proof Constructiona)基層表面的浮漿、返堿、塵土、油污以及表面涂層等雜物,并使光滑的混凝土表面變成粗糙面,然后用清水沖洗至中性。There should be set extra ply for gutter and shuting, and the coiled stock ending points of gutter and shuting should be fixed and sealedup. As regards the joint points of gutter and upright wall of internal drainage for highlow stride, it is requested to adopt sealingup treatment that adjusts to deformation.3) 泛水處防水卷材應(yīng)采用滿粘法。如采用木條應(yīng)做成上寬下窄,下口寬20mm,木條高度與防水層厚度相同,木條外應(yīng)涂刷隔離劑。 roofing ventilation hole。Variety, specification and technical characteristics of blocks materials such as building stone face brick and free access floor should be in accordance with current related specifications and drawings requirements。所有板材加工完成后,按照排版設(shè)計(jì)圖將板材編號(hào),嚴(yán)格按照編號(hào)順序施工。 patterns and linked rooms, corridor and stairs’plates splicing to confirm plates specifications and slit width, and then repeatedly implement the analog posing design on the puter and draw the optimizational “typesetting design drawing”. After the written confirmation by supervisor owners, work for plates and abnormity plates required cutting as per the typesetting design drawing, assuring the corner after cutting fine and smooth. After all the plates are pleted, as per the typesetting design drawing, assign numbers to plates, and implement construction in accordance with the numbers’sequence. Controlling of Tiling Blocks基層處理、塊材浸水、找中、套方、分格、定位、彈線、布線、鋪貼、灌縫、擦縫均需按照現(xiàn)行規(guī)范標(biāo)準(zhǔn)控制,基層必須平整、濕潤(rùn),彈線必須準(zhǔn)確順直,布線必須拉緊,鋪貼必須密實(shí)平整,灌縫擦縫必須均勻及時(shí)。 the back, the left amp。鑲貼后的瓷磚要及時(shí)進(jìn)行保護(hù),表面要覆蓋橡膠皮帶、地板革等材料保護(hù)。There should be not less than two nos. posing plans with the purpose of good arrangement and reducing loss, and emphatically check whether the dimension of the room is regular or not.(2)在結(jié)構(gòu)施工前能確定面磚規(guī)格,排磚設(shè)計(jì)出現(xiàn)非整塊磚時(shí),可建議適當(dāng)變更墻體位置或門窗洞口位置及尺寸。非整磚寬度不宜小于整磚的三分之一。 if there is avoidless less than 1/2 subclause brick, it is requested to add the dimension of one subclause brick and one inblock brick, then average it, and then cut them into two more than 1/2 noninblock bricks and arrange in the internal corner and external corner in two sides, and moreover, the position should be symmetrical.(5)地磚要坡向地漏處,地面地漏位置應(yīng)放置在一整塊地磚中央或拼縫十字線上,地磚拼縫應(yīng)在整塊地磚的對(duì)角線上。Ground tile should be laid in the floor drain, and the position of floor drain should be placed in the center of one inblock ground tile or cross curve o