freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

調(diào)試方案commissioning(中英文雙語版)_圖文-wenkub

2023-06-15 23:39:01 本頁面
 

【正文】 ation and management of missioning of HVAC works, missioning of electrical works, missioning of plumbing as well as missioning of fire fighting works.本工程系調(diào)試工作主要包括通風(fēng)空調(diào)工程調(diào)試、電氣工程調(diào)試、給排水及消防工程調(diào)試實(shí)施及管理工作。1. Commissioning indispensable conditions are shown in the table . installation and wiring of power equipment are pleted。各種燈具接線完成,各種開關(guān)面板接線完畢??照{(diào)水系統(tǒng)設(shè)備供電穩(wěn)定,系統(tǒng)沖洗合格;系統(tǒng)水壓滿足要求,閥門啟閉正常。Table Responsibilities of main personnel for project missioning 項(xiàng)目調(diào)試主要人員職責(zé)No.序號(hào)Post職務(wù)Acting personnel擔(dān)任人員Responsibilities職責(zé)1Team leader組長Project manager項(xiàng)目經(jīng)理Be responsible for establishment of missioning organization, preparation of resources used in missioning, establishment and implementation of missioning working system, coordination between MEP and other subcontractor at the stage of joint missioning.負(fù)責(zé)調(diào)試機(jī)構(gòu)的建立,調(diào)試需用資源的配備;負(fù)責(zé)調(diào)試工作制度的建立實(shí)施,聯(lián)動(dòng)調(diào)試階段機(jī)電與其他分包間的協(xié)調(diào)。 3Group leader of all disciplines專業(yè)小組長Professional engineer of missioning調(diào)試專業(yè)工程師Be responsible for pilation of missioning method statement and standard operation procedures for this area。 implement the missioning schedule of the area, organizing to collate missioning materials and issuing missioning report. 負(fù)責(zé)本區(qū)域調(diào)試方案和作業(yè)指導(dǎo)書的編制;本專業(yè)本區(qū)域調(diào)試工作的安全、施工技術(shù)交底;負(fù)責(zé)本專業(yè)本區(qū)域調(diào)試過程中發(fā)現(xiàn)疑難問題的解決方案;負(fù)責(zé)本專業(yè)本區(qū)域調(diào)試所使用的儀器、儀表的安全和可靠性;負(fù)責(zé)本專業(yè)本區(qū)域調(diào)試進(jìn)度計(jì)劃的落實(shí),組織整理調(diào)試資料并出具調(diào)試報(bào)告。3. Commissioning process is shown in the figure . 2Project of HVAC system空調(diào)通風(fēng)系統(tǒng)工程Singlemachine missioning of air conditioning equipment (fan, air conditioning unit, water pump, FCU) and smoke control unit。Deviations of total blast capacity and water flow of air conditioning unit meet requirements of the specification。Flow and pressure of water supply and firefighting water system meet use requirements. Smooth drainage, nonleakage, installation of water pump and valve ply with requirements.給水、消防水系統(tǒng)流量及壓力等滿足使用要求,排水順暢、無滲漏,水泵、水閥安裝符合要求。 4)measure ratio of resistance of metallic shield layer and conductor resistance。 2)breakingclosing test。 2)check wiring group and polarity。 secondary circuit in the power supply loop in the cabinet by using 1000V or 500V tramegger。 whether the connection of wire, cable, guide line and terminal is solid or not.2)用萬用表檢查柜箱內(nèi)空氣開關(guān),其開關(guān)分、合閘是否正常;檢查一次、二次線路接線符合設(shè)計(jì)要求;電線、電纜、導(dǎo)線和端子連接是否緊固;3)Shall calibrate precision of amperemeter or voltmeter on the switchboard.3)應(yīng)對(duì)配電盤上電流表或電壓表進(jìn)行精度校驗(yàn)。 if it is normal through check, the motor shall be operated for two hours with no load。 check whether rotating direction is consistent with the direction marked on the enclosure or not. After the fan operates stably, measure starting current, operation current, vibration, revolving speed, noise and bearing temperature of the fan。 System missioning 系統(tǒng)調(diào)試1. Commissioning of electrical system work電氣系統(tǒng)工程的調(diào)試(1)Commissioning process of electrical system work(1)電氣系統(tǒng)工程調(diào)試流程Figure Commissioning process of electrical system work 電氣系統(tǒng)工程調(diào)試流程(2)Commissioning contents of electric transformation and distribution system (2)變配電系統(tǒng)調(diào)試內(nèi)容:1)Sanitation clearing: clear sundries on site away, clean all equipment.1)衛(wèi)生清理:清理現(xiàn)場雜物,將所有設(shè)備打掃干凈。 whether there is not blockage phenomenon or not。⑤所有配電柜中的臨時(shí)電源應(yīng)全部拆除,并恢復(fù)其原設(shè)計(jì)線路;⑥Insulation of all equipment and circuits plies with requirements of the specification。 if any damage, it shall be supplemented or replaced with electrical elements with the same model in time。(3)Commissioning of power/lighting system(3)動(dòng)力/照明系統(tǒng)的調(diào)試Commissioning contents are shown in the table .。(2)All power/lighting switchboards adopt temporary power supply to conduct closing and opening test for main switch and separating switch of the switchboard, check whether closing and opening of all switchboard switches are normal or not.(2)所有動(dòng)力/照明配電盤,采用臨時(shí)電源對(duì)配電盤總開關(guān)、分開關(guān)進(jìn)行分合閘試驗(yàn),檢查各配電盤開關(guān)分合是否正常。4Commissioning records調(diào)試記錄Make missioning records when missioning.在調(diào)試的同時(shí)作好調(diào)試記錄。Electromagnetic pulse prevention (overvoltage protection)防電磁脈沖(過電壓保護(hù))2Grounding system接地系統(tǒng)Medium voltage and low voltage power supply grounding system中壓、低壓供電接地系統(tǒng)Neutral ground system of generator發(fā)電機(jī)中性點(diǎn)接地系統(tǒng)Grounding system of tele and puter equipment電信及計(jì)算機(jī)設(shè)備接地系統(tǒng)Weak current system grounding弱電系統(tǒng)接地3Equipotential connection等電位連接Various transformer substation room, auxiliary room of equipment, metal pipe and metal matter各變配電房、設(shè)備機(jī)房輔助用房、金屬管道及金屬物(1)Calibration of wire resistance。2)Commissioning contents are shown in the table .2)。3Loop check回路檢查Connect and open single loop, test situation of power on and munication of every loop.分次逐一連接開通單條回路,測(cè)試每個(gè)回路的通電、通訊情況。7Power supply conversion test電源轉(zhuǎn)換試驗(yàn)Cut off emergency switchboard one by one, whether the switchboard has been transferred into emergency working state within 5s.逐個(gè)切斷應(yīng)急配電盤,該配電盤是否在5s內(nèi)轉(zhuǎn)入應(yīng)急工作狀態(tài)。11Fault detection故障檢測(cè)Check whether acousticoptic failure signal of emergency lighting controller and display at failure part are normal or not.檢查應(yīng)急照明控制器聲光故障信號(hào)及故障部位顯示是否正常。Figure Commissioning process of HVAC system 空調(diào)通風(fēng)系統(tǒng)調(diào)試流程(2)Commissioning method of HVAC system is shown in the table .(2)。3Preliminary measurement of blast capacity of air inlet.風(fēng)口風(fēng)量的初測(cè)Measurement of air inlet of air diffuser adopts air hood, measurement of grating air inlet and twist outlet adopts hotbulb anemograph or impeller anemograph.散流器風(fēng)口測(cè)量用風(fēng)量罩,格柵風(fēng)口、旋流風(fēng)口測(cè)量用熱球風(fēng)速儀或葉輪風(fēng)速儀。15%。Commissioning of pressurization air supply system of staircase樓梯間加壓送風(fēng)系統(tǒng)的調(diào)試Total blast capacity meets design requirements, start pressurized fan, and positive pressure value of the staircase shall ply with provisions of design and fire control. Positive pressure value shall guarantee pressure from corridor, front room and stair is distributed increasingly.總風(fēng)量滿足設(shè)計(jì)要求,開啟加壓風(fēng)機(jī),樓梯間的正壓值應(yīng)符合設(shè)計(jì)與消防的規(guī)定。Table Number of test points of temperature and humidity test 濕、溫度測(cè)點(diǎn)數(shù)Fluctuation scope波動(dòng)范圍Indoor area ≦50m2室內(nèi)面積 ≤50m2Increase by every 2050m2每增加2050m2Δt=177。10%RH5Increase by 35增加352)Noi
點(diǎn)擊復(fù)制文檔內(nèi)容
公司管理相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖片鄂ICP備17016276號(hào)-1