【正文】
will be changed if the gross weight of the cargo is over 18,000kgs per 40’HQ.如果乙方已向保險(xiǎn)公司投保,甲方應(yīng)協(xié)助乙方提供必要的單據(jù)以便乙方向保險(xiǎn)公司索賠。Claim for delay :Part A should deliver the cargo to Part B’s consignee within 90 days (force majeure or unforeseeable risks, or the risks occurred because of the cargo’s speciality and the actions made by shipper or consignee will be exceptional, but Part A is required to show concerning evidence), otherwise the cargo is regarded as total loss. Part A should pay Part B USD450/CBM for pensation.Remark: The cargo will be transferred to Part A’s agent warehouse with charge of USD700 for crane fee and storage USD35/day if part B does not