【正文】
8800直接從拖車上卸貨及吊裝。● 將卸車用鋼梁及鞍座放置到支撐垛上;● Put unload on the supporting buttress by the girder and bicycle saddle。● Build the supporting buttress in advance。 Safety pricipal take charge of supplying HSE practice scheme and supervising HSE management implementation.供應(yīng)負(fù)責(zé)人根據(jù)工程需要及時保質(zhì)保量供應(yīng)器材,組織到貨設(shè)備驗收。 Technology principal take charge of writing the suspending scheme, telling the technology intentions, attending in tackling key technology problem and risk evaluating and affirming checking before suspending.質(zhì)量負(fù)責(zé)人負(fù)責(zé)審查、確認(rèn)特殊作業(yè)人員上崗資格,參加到貨設(shè)備的檢查和驗收,組織設(shè)備基礎(chǔ)驗收、檢查確認(rèn)施工質(zhì)量。1. 組織管理體系:Organization management system 現(xiàn)場吊裝組織機構(gòu)Suspending organization on site 吊裝總指揮技術(shù)供應(yīng)質(zhì)量安全吊裝顧問組抬尾指揮主吊指揮起重班機械操作員測量人員其他工種設(shè)備鉚工班現(xiàn)場吊裝指揮 Suspending advisor team Chief mander of suspending Technology supply facility quality safety Suspending mander on site Main suspending mander lifting trail mander Lifting team machine operator other types workerRivet worker team measure worker 主要人員職責(zé) Duties for important personnel吊裝總指揮對大件設(shè)備吊裝工作的總體運行進行協(xié)調(diào)控制,提供資源保證,簽發(fā)吊裝令。 Quality pricipal charge in examination and affirm the special worker mooount guard with certification, he also attend in checking and accept the received facilities, organize to check and accept the facilities basic, check and affirm the construction quality.設(shè)備負(fù)責(zé)人負(fù)責(zé)對進場施工設(shè)備的狀況進行核實確認(rèn)。 Supply pricipal purvey equipments with quality and quantity in time according to the project requirement, and organize to check and accept the received facilities. 2.運輸路線: (運輸公司編制)Transportation route: (workout by transport pany)3.運輸車輛的性能特點(運輸公司編制) Functions and features of vehicles (workout by transport pany)4.卸車位置及方位 Unloading places and orientation 、吊裝順序(詳見大型設(shè)備吊裝運行計劃) Unloading and suspending orders of heavy facilities (see running plan of suspending heavy facilities) 設(shè)備擺放所占的道路及時間: Road and time occupied by putting the facilities:1)10路:擺放T400T4003安裝平臺、保溫、管線 03年10月15日11月6日;2月1日2月9日 NO 10 Road: put T4001 during October 15 to November 6, 2003?!?油壓板車進入指定位置;● Enter the oil pressure plank machine to the appointed place。● 降下油壓板車,將設(shè)備落到卸車鞍座上;● Down the oil pressure plank and let the facilities on the unload’s bicycle saddle。 Consider the logical relationship of entering onsite and suspending time for facilities sufficiently, try best to use CC8800 to unload and suspend directly from the trailer.2) 大型設(shè)備根據(jù)合同由運輸方直接運輸至現(xiàn)場指定位置。每個支撐面積9平方米(每個支撐垛下面鋪設(shè)δ30~40mm鋼板)?!?According to the conditions supplied to Shanghai medicament industry academy of design, perform the places and directions of main suspending and trail hole. 其它設(shè)備Other facilities抬尾吊耳在正上方Suspending trail hole in the median above place按現(xiàn)場平面圖位置擺放Put as the ichnography place on site方向按現(xiàn)場平面圖位置擺放。 Excellent lifting of super lifting 600t and the most semidiameter is 25meter.6. 吊車組裝位置和移動位置以及各吊裝作業(yè)位置: Coordinate of the CC8800 pedrail suspending station車位序號Crane Station No.E坐標(biāo)Cooperate EN坐標(biāo)Cooperate N所吊設(shè)備位號Lifted equipment No.13433T4003 T4001 236443432T2001 T2003 E2001A/B336703351R3001 R3002 E3004/3006/3007E4003A/B/C E3009A/B7. 吊車站位及移動對場地的要求: Requirements for lifting site by crane standing position and moving: 影響吊車占車及行走的設(shè)備基礎(chǔ)及施工時間要求: Requirements for facilities basic and construction time of influencing crane by being occupied and moved: 1) 吊車站位1: 裝置北界區(qū)外管廊、P4013A/B/C、P4016;基礎(chǔ)03年11月24日后施工。 Construct the basic from November 24, 2003. 3) 吊車站位3: Z600X60P601P6016A/B;基礎(chǔ)04年2月20日后施工。 The underground pipeline influenced by the crane station will construct after exit of crane, the North: November 24, 2003?!洞笮驮O(shè)備吊裝工程施工工藝標(biāo)準(zhǔn)》SHJ 51590; Technics Standards for Construction of Suspending and installing heavy facilities, SHJ51590 ——《石油化工施工安全技術(shù)規(guī)程》SH 35051999; Safety technology regulations for construction of Petrochemichal, SH35051999;——《建筑地基基礎(chǔ)規(guī)范選編》中國建筑工業(yè)出版社1993年版; Chapters from architecture groundwork basic regulations, China architecture industry publishing pany, 1993 edition——《起重工操作規(guī)程》SYB411280;Operation regulations for craneman, SYB411280;2) SECCO IPMT提供的設(shè)備規(guī)格表(4月23日)及相關(guān)圖紙,詳見設(shè)備表; Specification form and related drawings of facilities supplied by SECCO IPMT (April,23), see equipments table for details;3) 上海項目工程部提供的50萬噸/年乙苯/苯乙烯裝置安裝工程施工投標(biāo)文件; Tender documents, construction of 500,000t/y installation for Ethylbeneze amp。 Capability form of 1250ton pedrail crane Model DEMAG CC8800. 總體吊裝方案 Wholel suspending scheme 工程概況Project general1) 場地條件Site conditions上海賽科50萬噸/年乙苯/苯乙烯裝置屬于新建項目,整個裝置作業(yè)面開闊。Styrene Plant is a part of new projects, the whole installation site is wide and its boundary is 180 m*120 m, so the environment is better for suspending heavy facilities. Otherwise, roads inside installation site construction is in accordance with facilities entering factory, 1250ton pedrail Model DEMAG CC8800 moving route and requirements of ground bearing for suspending.2) 工程特點 Project characteristics上海賽科50萬噸/年乙苯/苯乙烯裝置吊裝工程大型設(shè)備較多,分布面廣。 The highest facility, also the heaviest in all facilities, is EB/SM separator. (35T4001) about 3) 大型設(shè)備一覽表 Form of heavy facilities 序號Ref NO設(shè)備位號Facility number設(shè)備名稱Name 設(shè)備規(guī)格 (mm)Standard 設(shè)備重量(Kg)Weight備注Remark1D3001乙苯/蒸汽分離罐Steam separate tank for Ethylbeneze f7000180。29973268000Drawing No:571A22017R3002第二脫氫反應(yīng)器The second dehydrongen reactorf