【正文】
2)零填及挖方路段在零填及挖方路段的基礎(chǔ)處理時,如果路槽范圍及路槽以下是普通土或松土?xí)r,處理深度不應(yīng)僅限于上路槽,對于下路槽(路槽頂面以下30~80cm范圍)也必須處理,其壓實度應(yīng)與上路槽相同。采用水泥混凝土路攤鋪機(jī)進(jìn)行施工是提高混凝土板的均勻性、密性、保證其質(zhì)量的最有利辦法之一。,保證混凝土質(zhì)量加強(qiáng)施工管理是確保混凝土質(zhì)量的重要途徑之一。其次是混凝土拌和時控制施工配合比,各種材料計量必須準(zhǔn)確。這種處理方法是將已開裂的混凝土板全部清除,保留橫向連接鋼筋。但采用這種方法處理,費用較大。Cement Concrete Pavement On The Prevention Of Vertical Cracks 1 Preface Cement concrete pavement cracks a variety of forms. There is prima facie net crack, horizontal cracks, vertical cracks and so on. Life on the road most affected among the longitudinal cracks. Such cracks are usually the central line of the lane, in the event that a few or dozens of pieces of concrete slab for cracking, and cracks throughout the thickness。 the stability of poor letter of appointment. Therefore, dead load on the road and the role of motor vehicles under the dynamic load, basic first vertical cracks. Cement Concrete Pavement strength Cement Concrete Pavement can not be sufficient if the arrival of the ability to engage in bending, then the role of load in the car, the inevitable destruction of produce, such as longitudinal cracking. Cement Concrete Pavement with low intensity, there are two major reasons, one degree less than concrete Taiwan design value。 Vertical cracks in cement concrete pavement may be the deal with all of local processing and handling methods. Before processing, the cracks must be generated to investigate the cause analysis, to determine what causes and then determine what approach to use. All processing This approach is to crack the concrete slab has been cleared of all to retain the horizontal connecting bars. If there is damage to the grassroots level appropriate to deal with, and then repoured with the original surface of the concrete slab, such as strength. If that is the basis of cracking due to the road surface caused by cracking, it should be in the new fullcast concrete slab added to a wide range of singlelayer or doublereinforced, reinforced the general specifications of the steel used Φ10 made to 20 * 20cm spacing . This method is suitable for a variety of reasons arising from the road surface cracking. The use of this approach, the cost of the larger. Partial treatment Local processing is in the cracks on both sides of the range of not less than 50cm cutting a groove, deep groove thickness of ~ times the slot on both sides must be neat, should be cut cutting machine. Clean bottom, laying in the bottom Φ10mm reinforced with banding of 10 * 10cm steel net, and then poured with the same intensity of the original concrete pavement pebbles concrete, moisture transport