【正文】
............................................................ 49 附錄 4 工程量計(jì)算 .............................................................. 錯(cuò)誤 !未定義書簽。 后澆帶的施工方案 ............................................... 23 ................................................................................................ 24 雨期施工 ....................................................... 26 冬期施工 ....................................................... 24 ............................................................................................ 27 施工進(jìn)度計(jì)劃編制說明 ........................................... 27 河北工程大學(xué)土木工程學(xué)院畢業(yè)設(shè)計(jì)說明書 2020 年 IV 工程量計(jì)算 ..................................................... 28 工程進(jìn)度計(jì)算 ................................................... 29 施工進(jìn)度圖 ..................................................... 30 ................................................................................................... 30 勞動(dòng)力計(jì)劃表 ................................................... 30 主要施工機(jī)具設(shè)備配置計(jì)劃 ....................................... 31 主要周轉(zhuǎn)材料配置計(jì)劃 ........................................... 32 ............................................................................................ 33 平面布置原則 ................................................... 33 起重機(jī)械的位置選擇 ............................................. 33 施工平面布置 ................................................... 33 施工平面布置圖 ................................................. 37 .................................................................................... 37 質(zhì)量目標(biāo) ....................................... 錯(cuò)誤 !未定義書簽。 .................................... 錯(cuò)誤 !未定義書簽。 關(guān)鍵詞: 施工組織 施工平面布置 施工方案 進(jìn)度計(jì)劃 河北工程大學(xué)土木工程學(xué)院畢業(yè)設(shè)計(jì)說明書 2020 年 II Abstract This project is one of Daming Country in Xingan area high level housingbuildings. Its’ building area and is as far as . Includes one floor’s underground structure and 10 floor’s superstructure and a layer of overhead layer, and uses the shear wall of structure. The design is based on the general construction anization design and construction and installation enterprises annual financial plan for construction technology, management anization is determined. Construction general layout, process equipment layout and supplementary investigation data, make the construction layout. With reference to construction manual, technology acceptance specifications and instructions, construction sequence, construction flow is determined, the construction scheme and technical measures of each subpart of the project. According to the engineering and construction quota arrangement of schedule and labor, equipment, material, ponent and semifinished products supply, rational division of the construction period, and on the road, the site use, hydropower energy guarantee arrangement and construction site facilities planning, construction anization design and construction, technology and economy, the front and rear, enterprise39。參照建筑總平面圖,工藝設(shè)備布置圖及補(bǔ)充勘察資料,做出施工平面布置。 畢業(yè)設(shè)計(jì)說明書 大名縣興安小區(qū) 2樓施工組織設(shè)計(jì) 河北工程大學(xué)土木工程學(xué)院 2020 年 5 月 29 日 河北工程大學(xué)土木工程學(xué)院畢業(yè)設(shè)計(jì)說明書 2020 年 I 摘要 本施工組織設(shè)計(jì)系大名縣興安小區(qū) 2樓施工組織設(shè)計(jì)。 并參考施工手冊(cè)、技術(shù)驗(yàn)收規(guī)范和上級(jí)指示等確定了施工順序、施工流向,擬定了各分部分項(xiàng)工程的施工方案及技術(shù)措施。s global activities and projects, to harmonize the relationship between the construction of various departments, units, and each stage of the project, the construction based on scientific and reasonable, so do people do their best, with high quality, low cost, high speed, to obtain the best economic benefits and social benefits. The construction anization design will be gradually introduced the engineering survey, the overall arrangement of construction, construction preparation work。 建筑 概況 ....................................... 錯(cuò)誤 !未定義書簽。 質(zhì)量保證體系 ................................................... 37 組織保證措施 ................................... 錯(cuò)誤 !未定義書簽。 附錄 5 工期計(jì)算 .................................................................. 錯(cuò)誤 !未定義書簽。而施工組織設(shè)計(jì)是由承包單位根據(jù)施工圖紙以及其他有關(guān)資料和現(xiàn)場(chǎng)施工條件編制,用以指導(dǎo)其施工全過程施工活動(dòng)的技術(shù)、組織和經(jīng)濟(jì)的綜合性文件。本建筑物總長(zhǎng)度 米,寬度 米,剪力墻結(jié)構(gòu),主樓地下一層(均為住戶儲(chǔ)藏室)、地上十一層(架空層一層、標(biāo)準(zhǔn)層十層),主體建筑高度 米,總建筑面積為 ,其中地下室面積為 ,架空層面積為 ,住宅面積,陽臺(tái)面積 。設(shè)計(jì)使用年限為 50 年。 河北工程大學(xué)土木工程學(xué)院畢業(yè)設(shè)計(jì)說明書 2020 年 2 施工條件 ( 1) 地理位置:該工程位于河北省邯鄲市 大名縣 。 本工程為 2020年 3月 1日 開工,資源充足供應(yīng),施工企業(yè)為邯鄲市邯三建筑工程有限公司,資質(zhì)等級(jí)為國(guó)家房屋建筑工程主項(xiàng)資質(zhì)施工總承包一級(jí)企業(yè) 。 施工組織機(jī)構(gòu) 表 21 項(xiàng)目部主要管理人員組成 職 務(wù) 姓 名 職 稱 備 注 河北工程大學(xué)土木工程學(xué)院畢業(yè)設(shè)計(jì)說明書 2020 年 3 項(xiàng)目經(jīng)理 工程師 技術(shù)負(fù)責(zé)人 助 工 生產(chǎn)管理組 土建工長(zhǎng) 助 工 土建工長(zhǎng) 助 工 安裝工長(zhǎng) (電 ) 助 工 安裝工長(zhǎng) (暖 ) 助 工 表 22 項(xiàng)目部主要管理人員組成 職 務(wù) 姓 名 職 稱 備 注 技術(shù)質(zhì)量組 施工技術(shù)員 工程師 施工技術(shù)員 助 工 質(zhì)檢員 助 工 質(zhì)檢員 助 工 試驗(yàn)員 助 工 材料組 組長(zhǎng) 助 工 材料員 助 工 設(shè)備員 助 工 安全組 安全檢查員 助 工 資料員 助 工 工程施工目標(biāo) ( 1)質(zhì)量控制目標(biāo): 質(zhì)量標(biāo)準(zhǔn) 定為 優(yōu)良,確保工程一次性驗(yàn)收合 格率達(dá)到 100%。 ( 3) 文明施工:市級(jí)安全文明工地。 ( 2)根據(jù)《質(zhì)量手冊(cè)》和《程序文件》要求,針對(duì)本工程特點(diǎn)進(jìn)行質(zhì)量策劃,編制工程質(zhì)量計(jì)劃,制定特殊工序、關(guān)鍵工序、重 點(diǎn)工序質(zhì)量控制措施。 ( 6)編制施工預(yù)算,提出主要材料用量計(jì)劃。 ( 4)組織施工機(jī)械進(jìn)場(chǎng)、安裝、調(diào)試,做好開工前準(zhǔn)備工作。 ( 3)抓緊與地方政府各有關(guān)部門接洽,疏通關(guān)系,辦理開工前各項(xiàng)手續(xù),保證施工順利進(jìn)行。 如下圖所示: 河北工程大學(xué)土木工程學(xué)院畢業(yè)設(shè)計(jì)說明書 2020 年 5 施工總進(jìn)度控制 施工計(jì)劃開工日期為 2020 年 3 月 1日,總工期 274 天,從施工準(zhǔn)備到基礎(chǔ)分部施工完成 60天,主體 結(jié)構(gòu)分部施工 89 天,裝修階段施工 60 天,結(jié)尾工作 10 天,施工總工期 270 天。 本工程沉降觀測(cè)采用精密水準(zhǔn)儀 Ni004進(jìn)行觀測(cè)。 激光垂準(zhǔn)儀 DZJ6 1 1/30000 垂直度測(cè)量 鋼尺 50m 2 經(jīng)計(jì)量局檢定合格 距離測(cè)量 線錘 4 垂直度測(cè)量 對(duì)講機(jī) 5km 2 通訊聯(lián)絡(luò) 鋼卷尺 5m 10 經(jīng)計(jì)量局檢定合格 距離丈量 圖 22 施工段的劃分 I 段 II 段