【正文】
rmally be tested per day and the expected range of defects to be found in each test. Before we begin collecting project data, we document the analysis procedures we plan to follow so everyone knows how the collected data will be used to generate reports. We always place our project requirements document under configuration control and then make sure that our plans and work products can be traced to this document. We routinely use a particular server as the repository for all of our controlled baseline product files, both current versions and archived copies of old versions. A management steering mittee regularly meets to review our progress in preparing and executing our process improvement action plan and to resolve any serious problems that are interfering with these efforts. As an integral part of our standard processes, we have included a set of