【正文】
synchr onous backup sof twar e does not r espond t o t he r est of the dat a t o be modif ied. I n or der t o ensur e maxim um server except ion, saving some dat a, synchr onization of r eal tim e backup sof twar e should have high, t hat delay does not exceed 1 m inut e. Of fsit e backups t hat m ust be support ed across wor k segm ent s. I n accor dance wit h t he above r equir em ent s for development our dedicat ed backup soft war e. Af ter development, wing t hat opened in salt on high speed t est r esult s m eet t he design r equir ement sWit h t he passing of t ime, it is pr epar ing source Huan of Hubei indust r ial invest m ent pany lim it ed f actor y close t o t he planning of t he day looks like, planning hum an ideals gr adually int o an ent it y, spread out befor e us. Securit y plan ent ers t he deployed Stat e. Af t er list ening t o your business obj ect ive f or t he leader s of secur it y, I quickly people wit h loyalt y t o t he cause of secur it y, as well as pr evious securit y experience, bined wit h peer pioneer s of success stor ies or exper iences. Border secur it y on your business ideas and sugestions t o make as f olows: 1. 1 af t er car ef ul analysis of a bluepr int of t he ent erpr ise, t aking int o account your ent erpr ise f act ory boundary: x 234. 24M r ect angular sit e. 1. 2 scope f or such dachangqu, Ir em end t he solid bor der secur it y deploym ent, for a r ange of r easons, whet her we use inf r ared r adiation, elect ronic f ences, alar m had done t her e, wher e t he r esponse. Because t he f act ory could not spend a gr eat deal of manpower cost t o post hr ee st eps, f ive steps and a whist le. As we all know, under t he cur rent f or m of hum an r esources cost s m uch igher t han t he cost of all scient if ic and t echnological input . I n or der t o bet ter achieve t he goal of planner s, as well as f or Act ive solid bor der defense wor k. We r em end t hat you use inf r ar ed r adiat ion or linkage of elect ronic f ences wit h video secur it y deployment o achieve secur it y goals. 1. 3 in accordance wit h t he device on t he wall of t he pound pr opert ies and paramet ers t o a r easonable plan t o inst all t he inf r ar ed r adiat ion equipm ent or f ences and elect ronic equipment as well as video sur veilance equipment , t he specif ic needs of t he equipm ent and m at er ials quant it ies we wil det ail lat er . 1. 4 t he pr ogr am me accor ding t o your pany39。s sit e t o see and list en t o t he leader ship pr oposal, and in accor dance wit h t he actual needs of t he pr oj ect , wit h r ef erence t o t he r elevant int er national st andards and nat ional st andar ds, bined wit h t he experience accumulat ed by t he pany engaged in m ult iple pr oj ects, pr epare t he t echnology pac kage. I f t he cont ents or any ot her aspect of t he pr ogram me has not det ailed wher e we wel e your valuable m ent s. Second, t he design pr inciples of t he pr oject design f olows t echnology advanced, f unct ional, st able and cost saving pr inciples. And consider ing const ruction, m aint enance and operat ion, and f or fut ure developm ent , expansion, r econst ruction and ot her f act ors leave r oom f or expansion. Design elem ent s of t he syst em is t he systemat ic, int egr ated and pr ehensive。 design has t he scient if icit y, r easonabilt y and oper abilt y. I t s has f olowing pr inciples: 2. 1, and advanced and applicabilt y used cur r ently most advanced of sof t, and hardwar e and t he wor k t echnology, er r or s r at e low, pat ible sex st r ong, upgr ade easy, used m odule t ype st r uct ur e, expansion convenient , no r epeat const r uct ion invest m ent , syst em of t echnology per f or m ance and qualit y index should r eached int er nat ional leading level。 while, syst em of inst allat ion debugging, and sof t war e pr ogr am m ing and oper at ion using and should sim ple, easy m ast er , f or China condit ions and t his pr oj ect of f eat ur es. Set t he num ber of advanced t echnology in a t he syst em s, r ef lect s t he cur r ent level of t he lat est developm ent of put er and wor k t echnology, adapt ed t o t he r equir em ent s of t he t im es. While t he syst em is t he syst em used f or var ious m anagem ent levels, it s f unct ions ar e conf igur ed t o pr ovide t he user wit h f or t able, sa f e, f ast and convenient t o 3. 1, t he int elligent building design st andar ds ( GB/t 50314 2020) 3. 2, t he design st andar d f or int elligent building syst em s engineer ing ( DB32/191 1998) 3. 3, t he code f or engineer ing design of gener ic cabling syst em f or cit y r esident ial buildings ( CECS/119 200) , code f or design of buildings and cam pus cable syst ems engineering ( GB/T503112020) 3. 5, t he code f or elect rical design of civil buildings ( J GJ / T16 92) , t he code f or civil closed cir cuit m onit or ing TV system engineer ing t echnology ( GB/5019894) 3. 7, t he t ypes of system ear t hing and saf ety t echnical r equir em ent s ( GB1405093) 3. 8, of t he secur it y engineer ing pr ocedur es and r equir ements ( GA/T75 94) 3. 9, t he r ules of securit y engineer ing accept ance ( GA/T3082020) 3. 10, t he industr ial design of TV syst em code ( GBJ 115) 3. 11, t he Secur it y checks pr event ion syst em pass f or gr aphics s ymbol ( GA/7494) 3. 12, and f ir e linkage cont rol equipm ent General t echnology condit ions ( GB 168061997) f our, and syst em f unct ion and f eatur es in syst em bot h advanced, and pr actical, and m atur e, and r eliable, and do system open, and can ext ended sex good, bot h investm ent r easonable, and benef it s best of purpose, bor der securit y alar m syst em on sit e equipment f or concent r at ed monit or ed, and cont r ol and m anagem e