【正文】
《微山縣歡城鎮(zhèn)采煤塌陷地復(fù)墾項(xiàng)目》規(guī)劃報(bào)告 0微山縣歡城鎮(zhèn)采煤塌陷地復(fù)墾項(xiàng)目規(guī)劃設(shè)計(jì)報(bào)告(二)County Huan urban reclamation project Mining SubsidenceWeishan planning and design report 設(shè)計(jì):*** 學(xué)號(hào):***** 學(xué)院:************指導(dǎo)老師:***2022 年 3 月《微山縣歡城鎮(zhèn)采煤塌陷地復(fù)墾項(xiàng)目》規(guī)劃報(bào)告 1摘 要微山縣位于濟(jì)寧市城區(qū)南部,由于煤 炭 資 源 的 大 規(guī) 模 開 采 , 地 面 塌 陷 范 圍 不 斷擴(kuò) 大 ,土地塌陷不僅毀壞了農(nóng)田,破壞了交通、通訊設(shè)施,并且改變了河流排水溝渠的流勢(shì)梯度,降低了防洪能力,破壞了含水層結(jié)構(gòu),直接影響周邊地區(qū)對(duì)地下水資源的開發(fā)利用,給當(dāng)?shù)厝嗣袢罕姷纳a(chǎn)生活造成了一定危害。截 止 到 2022 年 底 塌 陷面 積 已 達(dá) 公 頃 , 塌 陷 深 度 — 米 不 等 , 絕 產(chǎn) 面 積 達(dá) 公 頃 。 為了徹底改變這一區(qū)域的農(nóng)業(yè)生產(chǎn)面貌,促進(jìn)農(nóng)業(yè)可持續(xù)發(fā)展和土地的可持續(xù)利用,確保農(nóng)業(yè)增產(chǎn)、農(nóng)民增收和農(nóng)村穩(wěn)定,微山縣 委、縣政府、國(guó)土局和微山縣歡城鎮(zhèn)政府決定用三年的時(shí)間,投入必要的人、財(cái)、物力,對(duì)這片塌陷地進(jìn)行復(fù)墾。對(duì)項(xiàng)目區(qū)進(jìn)行復(fù)墾時(shí),除了部分交通用地、排水設(shè)施和水域外均為耕地,面積 公頃,由田間道路和排水溝劃分而成方田。項(xiàng)目區(qū)因采煤塌陷,整體地勢(shì)較低,為達(dá)到耕作標(biāo)高要求,需要對(duì)有耕作要求的田塊墊土抬高其標(biāo)高, 項(xiàng)目區(qū)開挖水養(yǎng)地取土,墊至周圍相對(duì)標(biāo)高較低田塊,本著挖深填淺、總體土方量平衡的原則進(jìn)行此項(xiàng)工程。田塊內(nèi)部根據(jù)排水溝的走勢(shì)及方田內(nèi)部土方平衡的原則,確定各方田的設(shè)計(jì)高程,田塊內(nèi)按排水方向以 1/500 的坡降進(jìn)行平整。項(xiàng)目區(qū)修建村莊通往項(xiàng)目區(qū)的田間道和連接田塊與田間道的生產(chǎn)路。項(xiàng)目區(qū)的水源主要來自打井取水,采用低壓管灌的方式節(jié)水灌溉;結(jié)合道路布置斗排水溝和農(nóng)排水溝。沿田間道、生產(chǎn)路布置護(hù)路林帶。項(xiàng)目總投資 萬元,全部申請(qǐng)國(guó)家投資。項(xiàng)目完成后,新增耕地 公頃,新增耕地率 %將采煤塌陷地復(fù)墾成農(nóng)田、魚塘成方,綠化成行,排灌暢通、路渠配套,增強(qiáng)防洪、排澇、蓄水和灌溉能力,使昔日的采煤塌陷地,成為農(nóng)耕、養(yǎng)殖為一體的生態(tài)高效農(nóng)業(yè)園區(qū)。關(guān)鍵詞:塌陷 復(fù)墾 總投資 生 態(tài) 高 效 農(nóng) 業(yè) 園 區(qū)《微山縣歡城鎮(zhèn)采煤塌陷地復(fù)墾項(xiàng)目》規(guī)劃報(bào)告 2AbstractWeishan is located in Jining City, ground subsidence expanding the scope of the south, due to the largescale exploitation of coal resources, land subsidence has not only destroyed farmland, destruction of transportation, munication facilities, and changed the potential gradient of the flow of rivers, drainage ditches, reducing the The flood control capacity, undermining the structure of the aquifer, a direct impact on the surrounding areas on the development and utilization of groundwater resources, and caused some harm to the local people39。s production and life. The collapse area until the end of 2022 reached hectares, the collapse depth of meters, never produced an area of hectares. In order to pletely change the agricultural production in the face of this region, to promote sustainable agricultural development and sustainable use of land, to ensure that agricultural production, increasing farmers39。 ine and rural stability, Weishan County Commission, County Government, Land Bureau, and the town government decided to Weishan Huan three years, to invest the necessary financial, material, and this piece of subsided land reclamation.The reclamation project area, in addition to part of the transportation land, drainage facilities and water are arable land, an area of ha, divided by the field of roads and drains made of square fields.Project area due to coal mining subsidence, the overall lowlying reach farming elevation requirements, pad the soil to raise its elevation plots of farming requirements in the project area excavation of water to keep soil pad to the surrounding relative elevation lower plots, in line with the principle of deepened fill light, the overall balance of Earthwork for the project. The plots in accordance with the principles of the trend of the drainage ditch and earthwork balance within the square Tian within the design elevation to determine the parties to field plots within the drainage direction of 1/500 gradient formation.Project area is the construction of the village leading to the project area field Road and connecting terraces and field Road production road. The project area water supply mainly from drilling wells for water, the use of lowpressure pipe irrigation watersaving irrigation。 bination of road layout of the bucket drains and agricultural drains. Road along the field, the production of road layout and road protection forest.《微山縣歡城鎮(zhèn)采煤塌陷地復(fù)墾項(xiàng)目》規(guī)劃報(bào)告 3The total investment of million yuan, all applications for state investment.After the pletion of the project, hectares of arable land, new farmland rate was % Coal Mining Subsidence Land Reclamation farmland, fish ponds prescription, green lined, irrigation and drainage flow, Road Drainage supporting, enhance flood control, drainage, water storage and irrigation ability of the former coal mining subsidence area, into farming, farming as one of the ecoefficient agricultural park.Keywords: collapse of the reclamation of the total investment in ecoefficient agricultural park《微山縣歡城鎮(zhèn)采煤塌陷地復(fù)墾項(xiàng)目》規(guī)劃報(bào)告 4目 錄第一部分:規(guī)劃報(bào)告 ......................................................16第 1 章 前言 ............................................................17 項(xiàng)目建設(shè)背景 ....................................................17 項(xiàng)目建設(shè)的必要性 ............................................17 項(xiàng)目建設(shè)的意義 ..............................................18 項(xiàng)目建設(shè)目的 ....................................................19 項(xiàng)目規(guī)劃任務(wù) ....................................................19 項(xiàng)目規(guī)劃依據(jù) ....................................................19 國(guó)家的有關(guān)法律、法規(guī)、標(biāo)準(zhǔn)、文件 ............................20 地方有關(guān)文件、規(guī)劃、計(jì)劃 ....................................20 可行性研究報(bào)告及評(píng)估意見 ....................................21 行業(yè)技術(shù)標(biāo)準(zhǔn) ................................................21 項(xiàng)目規(guī)劃建設(shè)期限 ................................................21第 2 章 項(xiàng)目區(qū)概況 ......................................................21 微山縣基本概況 ..................................................21 項(xiàng)目區(qū)基本概況 ..................................................22 地理位置與范圍 ..............................................22 自然條件及自然資源 ..........................................22 社會(huì)經(jīng)濟(jì)條件 ................................................23 土地利用現(xiàn)狀 ................................................24 項(xiàng)目區(qū)基礎(chǔ)設(shè)施狀況 ..........................................25第 3 章 項(xiàng)目分析 ........................................................26 土地利用問題分析 ................................................26 自然因素 ....................................................26 社會(huì)因素 ....................................................27 公眾參與分析 ................................................27《微山縣歡城鎮(zhèn)采煤塌陷地復(fù)墾項(xiàng)目》規(guī)劃報(bào)告 5 項(xiàng)目區(qū)農(nóng)用地適宜性評(píng)價(jià) ...................................