【正文】
羅氏研發(fā)支持樓項目Roche Ramp。D Building Project施工方案Construction Scheme(消防系統(tǒng)部分) (FireProof System Part)編制人Maker:審核人Checker:批準人Approver:版本C Editon C江蘇省建設(shè)集團公司(滬)Jiangsu Construction Group Com73 / 74目 錄 Contents 第一章:編制說明及依據(jù) 2:preparation instructions 2 編制依據(jù): Develop basis 3:Construction goals: 4第二章 工程簡介及概況Chapter II Introduction and Overview of the project 5 Overview 5 Overview 6 System design Overview 6第三章 施工部署Chapter 3 Construction deployment 73.1人力資源分析及工具配備 human resources analysis and equipped tools 73.2 主要人員職責(zé) Major staff responsibilities 103.3安裝人員部署installation personnel deployment 153.4 施工順序安排 Construction sequencing 153.5施工管理措施 construction management measures 163.6施工技術(shù)準備 Construction technology preparation 173.7施工器具設(shè)備Construction machinery equipment 193.8工程施工協(xié)調(diào) construction coordination 203.9材料設(shè)備進場計劃:Materials and equipment site entering plan: 22第四章 施工方案construction program 24 火災(zāi)自動報警及聯(lián)動控制系統(tǒng)Automatic fire alarm and linkage control system 24(1).施工工藝流程Construction process 24(2).主要分項工程施工方法及技術(shù)要求 24Major sub engineering construction methods and technical requirements 24三、施工難點及相應(yīng)措施 construction difficulties and corresponding measures 36 自動噴水滅火噴淋系統(tǒng) Automatic sprinkling fire extinguishing system 38一、施工工藝流程:construction flow 38二、系統(tǒng)施工準備 system construction preparation 38三.主要分項工程施工方法及技術(shù)要求 41Major sub engineering construction methods and technical requirements 41 消火栓系統(tǒng)及消防設(shè)備安裝Fire hydrant system and fire equipment installation 56一.施工工藝流程 Construction process 56二、主要分項工程施工方法及技術(shù)要求 56Major subproject Construction methods and technical requirements 56 溝槽式連接管道專項方案 60一.施工工藝流程 Construction process 60二、主要分項工程施工方法及技術(shù)要求 60Major subproject Construction methods and technical requirements 60第五章、工程質(zhì)量保證措施engineering, quality assurance measures 65第六章、安全技術(shù)措施safety technical measures 66 、施工安全 construction safety………………………………………………………67 、材料、機械安全materials, machinery and safety……………………………67 。Fire safety measures……………………………………………68 job……………………………………………………………60 waste disposal measures………………………68 :Finished product protection …………………………………………68 construction of civilization…………………………………69 analysis……………………………………………………………70第一章:編制說明及依據(jù):preparation instructions本施工組織設(shè)計主要反映本專業(yè)的基本施工方法,采用經(jīng)濟、合理、安全可靠的施工方案編制而成的。The construction organization design reflects the professional construction methods, the use of economic, reasonable, safe and reliable construction program is piled.我們在認真分析了本工程的特點、難點、重點及各種影響施工的因素,充分融入了我們多年來對類似工程的經(jīng)驗和對業(yè)主招標文件、圖紙的充分理解,對給排水專業(yè)安裝部分的管理機構(gòu)設(shè)置、施工進度計劃、勞動力組織、機械設(shè)備配備、物料的采購供應(yīng)、主要分項工程的施工方法、進度控制措施、工程質(zhì)量控制措施、安全保證措施、文明施工及環(huán)境保護措施等諸多因素進行了綜合考慮和研究,以突出本施工組織設(shè)計在羅氏制藥研發(fā)支持樓項目電氣專業(yè)施工過程中對本專業(yè)目標系統(tǒng)控制的科學(xué)性、可行性和指導(dǎo)性。In a careful analysis of the characteristics of this project, the difficulties, the focus and the various factors affecting the construction, fully integrated into our many years of experience in similar projects and full understanding of the owners of tender documents, drawings, professional installation part of the water supply and drainage management structure, the construction schedule, labor organizations, machinery and equipment with procurement and supply of materials, construction methods of the major subproject, the progress of control measures, engineering, quality control measures, safety assurance measures, civilized construction and environmental protection measures, and many the factors considering and research, Roche R amp。 D support building project the electrical professional construction process of the scientific nature of the professional control of the target system, the feasibility and guidance designed to highlight this construction organization. 編制依據(jù): Develop basis羅氏制藥研發(fā)支持樓項目工程的招標文件;Roche pharmaceutical R amp。 D support building project tender documents。羅氏制藥研發(fā)支持樓項目機電工程的設(shè)計圖紙; Roche pharmaceutical R amp。 D support floor mechanical and electrical engineering design drawings?!督ㄖO(shè)計防火規(guī)范》GB500162006Architectural design code for fire protection GB500162006《高層民用建筑設(shè)計防火規(guī)范》GB5004595(2005年版)Tall Buildings design code for fire protection GB5004595 (2005)《自動噴水滅火系統(tǒng)設(shè)計規(guī)范》GB500842001(2005年版)Automatic sprinkler system design specifications GB500842001 (2005 edition)《火災(zāi)自動報警系統(tǒng)設(shè)計規(guī)范》GB5011698Automatic fire alarm system design specifications GB5011698《火災(zāi)自動報警系統(tǒng)施工及驗收規(guī)范》GB501662007Automatic fire alarm system construction and acceptance GB501662007《自動噴水滅火系統(tǒng)施工及驗收規(guī)范》GB502612005Automatic sprinkler system construction and acceptance GB502612005《建筑給水排水及采暖工程施工質(zhì)量驗收規(guī)范》GB502422002Building Water and Heating Engineering Quality Acceptance specifications GB502422002《建筑電氣工程施工質(zhì)量驗收規(guī)范》GB503032002Construction Quality Acceptance and electrical engineering specifications GB503032002《點型感煙火災(zāi)探測器》GB47152005Pointtype smoke detector GB47152005《點型感溫火災(zāi)探測器》GB47162005 Point type heat fire detectors, GB47162005《火災(zāi)報警控制器》GB47172005 Fire alarm control GB47172005《手動火災(zāi)報警按鈕》GB198802005Manual fire alarm button GB198802005《消防聯(lián)動控制系統(tǒng)》GB168062006Fire control system GB168062006《消防控制室通用技術(shù)要求》GA7672008General technical requirements for the fire control room GA7672008相應(yīng)的國家規(guī)范、標準;relative national norms and standard本專業(yè)歷史上類似工程的經(jīng)驗 ;similar to the major project experience 本專業(yè)質(zhì)量體系和健康環(huán)境體系文件;quality system and health environment document:Construction goals: Goals本專業(yè)安裝工程的質(zhì)量控制目標:交給業(yè)主一個既滿足國家規(guī)范要求又讓業(yè)主滿意的合格產(chǎn)品。The professional installation engineering quality control objectives: to the owners both satisfied with letting owners of qualified products meet national regulatory requirements. The duration targets 消防專業(yè)標段工程我們依假定開工日期為2013年6月1日,2013年12月15日結(jié)束,共計199個日歷天;驗收時間:—。Fire project, we due to start on June 1st ,and finish on December 15th ,2013, 199 calendar days in all . Acceptance time: —。 Security Goals施工工程中,本專業(yè)將采取切實可行的措施和充足的安全投入,建立完善的安全施工管理機制,確保本項目施工全過程無重大傷亡事故、無火災(zāi)事故和無