【正文】
laim on October 20 and submitted a time, cost claim calculations and claim is the basis of the detailed materials on October 25.索賠程序:(claim procedures)Claim procedures: Claim events —— Claim application ——Submit claim report and the material ——Engineers audit —— Owner audit —— The contractor agree or disagree ——Treatment measures索賠報告書題目: 項目臨時停工索賠事件: 業(yè)主供應材料未到,以及現(xiàn)場停水停電。影響: 造成現(xiàn)場停工,雖然安排部分工人做其他工作,但是仍然有停工;機械造成停工。要求: 延長工期14天,費用索賠7875元。其中: 人工停工費在盡量安排工人從事其它工作之后,按補償?shù)墓ばР钣嬎?。機械停工費考慮是自有設備,僅按折舊臺班費計算。本索賠事項雙方同意不計取管理費和利潤.證據(jù): 相應的合同條款,施工現(xiàn)場情況記錄,工人工資單等證據(jù)資料附在索賠報告之后。Claims Report on Marine Pollution andDamage by Ship Claims ReportTopic: Project temporary shutdown claimEvents: The owner supply material did not arrive, and field water out