【正文】
、陽角處及聚苯板接縫處必需加鋼絲網(wǎng) )。 保溫板上刷一層界面處置劑。 厚的 1: 3水泥砂漿打底 (水泥砂漿內(nèi)摻抗裂劑 )。 厚的 1: 3水泥砂漿找平 (水泥砂漿內(nèi)摻抗裂劑 )。 厚的聚合物抗裂砂漿,外表夾一層玻璃網(wǎng)格布,壓實趕光 (玻璃網(wǎng)格布為耐堿性 )。 噴涂外墻涂料。 結(jié)語在高層建筑 施工中,一定要純熟控制施工技術(shù)管理要點。只要控制好各種管理要點,才干控制了施工的主線。此外,還要應(yīng)用新技術(shù)、新工藝、新資料,控制高層剪力墻建筑的垂直度、剪力墻的平整度以及外墻裂痕等技術(shù)控制難點,節(jié)約資金投入,降低工程本錢,為企業(yè)取得更大的經(jīng)濟(jì)效益。 On the main points of the technical management of the highrise shear wall construction Introduction In the construction of highrise shear wall buildings, technology management is an important link in the process of construction management, construction quality, capital, peace,progress and technology management closely connected. Thus, as long as do a good job intechnology management, ability to control the highrise shear wall construction techniques. In this paper, the points of the technical management of highrise shear wall construction fora introductions. The purpose of construction management is indeed given the ordinary situation, the main purpose of building construction management table now the following aspects: The issues presented in the design drawings necessary for early treatment, so as not to affect the normal construction of the building works. Branch of the Ministry of works necessary prior to stop detailed, targeted technology safelytell smb. What one39。s real intentions are. The preparation of construction plans science, applicable to, economic, and stop thedynamic management, in order to facilitate timely optimization. Technical archival material to collect plete and collate a uniform, to achievesynchronization with the project. Implementation and application of new technologies, new processes, new information, making it the wrist to reduce project capital. Developed for the pletion of the purpose and management measures. Drawings reviewing the design changed their mind and signed a check on the construction plans,staffing, from the following aspects: First check the construction plans, preliminary understanding of the detailed position of thebroad engineering, engineering practice, the function of windows and doors. Review of building size, elevation, and so on. And then check the structural map, checking the size, elevation, and thinking can reasonably reinforcement. Built facilities map and statement Shi Figure control check. Check the map at the same time to think about the detailed construction plans. Timely munication with the designers. Well Hung real estate highrise residential building construction, the construction unit in thedrawings the Chinese Communists find I 8O at the problem, and promptly corrected theerror, to prevent economic losses do not want to. Technical tests to accurately place the contents of the technical disclosure of the Branch ofthe Ministry of project to be careful, in particular, is a key part of measures to deal with, construction and attention to matters, the quality of the project requests, etc. to write clearly. Good munication with the foreman, labor team squad, exchange, ensure precise Jiaodicontent. Selection and optimization of the construction plans