【正文】
D. Arnold. Turbo charging technologies to meet critical performance demands of ultralow emissions diesel engines. SAE Paper 2004011359. [17] . Baert, . Beckman, A. Veen. Efficient EGR technology for Future Efficient HD Diesels. SAE Paper 980190 .[18] 百度文庫 [19] Akira Shoji, Shiji Kamoshita, Tetsu Watanable. Development of a simultaneous reduction system of NOX and particulate matter for lightduty truck。SAE Paper 2004010579. [20] Keiichi Yamada, Hidekau Oshizawa. The Second generation of electronic diesel fuel injection systemsinvestigation with a rotary pump. SAE Paper 860145.[21] 徐健 ,李國棟, 沈林勇 ,龔振邦 ,.附錄1:系統(tǒng)界面VB源代碼主界面源代碼Private Sub Command1_Click()End SubPrivate Sub Command10_Click()End SubPrivate Sub Command11_Click()End SubPrivate Sub Command12_Click()End SubPrivate Sub Command13_Click()End SubPrivate Sub Command14_Click()End SubPrivate Sub Command15_Click()End SubPrivate Sub Command16_Click()End SubPrivate Sub Command17_Click()End SubPrivate Sub Command2_Click()End SubPrivate Sub Command3_Click()End SubPrivate Sub Command4_Click()End SubPrivate Sub Command5_Click()End SubPrivate Sub Command6_Click()End SubPrivate Sub Command7_Click()End SubPrivate Sub Command8_Click()End SubPrivate Sub Command9_Click()End SubPrivate Sub VScroll1_Change()a = = If = 350 ThenMsgBox 汽包水位過高! Else If = 100 Then MsgBox 汽包水位過低! Else End If End IfEnd SubPrivate Sub VScroll1_Scroll() a = = End Sub細節(jié)源代碼Private Sub Command3_Click()End SubPrivate Sub Command4_Click()If = 已關(guān) Then = = 已開Else = 已開End IfEnd SubOption ExplicitDim a As IntegerPrivate Sub HS1_Change() a = = End SubPrivate Sub HS1_Scroll() a = = End SubPrivate Sub Command1_Click() = 已開 = End SubPrivate Sub Command2_Click() = 已關(guān) = End SubOption ExplicitDim a As IntegerPrivate Sub VS1_Change() a = = End SubPrivate Sub VS1_Scroll() a = = End Sub Modbus 通訊協(xié)議源代碼Private Sub Msm1_Onm() 39。...通訊事件發(fā)生 Dim indata As Variant Dim bte(0) As Byte Select Case Case EvReceive 39。...有接受事件發(fā)生 indata = bte(0) = AscB(indata) = bte(0) = 0 39。...清空輸入寄存器 End Select End Sub Private Sub Command18_Click() 39。...發(fā)送數(shù)據(jù) Dim Num As Integer Dim outbte(0) As Byte Num = Val() outbte(0) = CByte(Num) = 0 39。...清空輸出寄存器 = outbte(0) 39。...發(fā)送數(shù)據(jù) End Sub Private Sub Command19_Click() 39。...退出 Unload Me End Sub Private Sub Form_Load() 39。...初始化 = 1 39。...使用Com1口 = 9600,n,8,1 39。...設(shè)置通訊參數(shù) = True 39。...打開串口 End Sub 4 單片機內(nèi)部源代碼PUSH PSW ;將程序狀態(tài)字壓入堆棧 PUSH ACC ;將累加器壓入堆棧 CLR EA ;關(guān)閉系統(tǒng)中斷CLR RI ;清除中斷標(biāo)志位 MOV A,SBUF ;從接收寄存器中讀取數(shù)據(jù) MOV 70H,A ;分解數(shù)據(jù)百、十、個位并顯示 MOV B,100DIV AB MOV 52H,A ;分解百位,送入存儲器52H MOV A,B MOV B,10 DIV AB MOV 51H,A ;分解十位,送入存儲器51H MOV 50H,B ;分解個位,送入存儲器50H MOV A,70H MOV B,2DIV AB 。將接受的數(shù)據(jù)除以2 MOV SBUF,A ;將得數(shù)發(fā)送到輸出寄存器 ACALL DL1 ;延時保證數(shù)據(jù)完整發(fā)送 ACALL DL1 CLR RI ;清除中斷標(biāo)志位 SETB EA ;打開系統(tǒng)中斷 POP ACC 。累加器出棧 POP PSW ;程序狀態(tài)字出棧 RETI ;中斷程序返回 翻譯英文原文A Method For Alarming Water Level of Boiler Drum on Nuclear Power Plant Based on BP Neural NetworkYalei Quan and Xuhong YangFaculty of Automation Engineering Shanghai University of Electric Power。Shanghai 。China water level is an important parameter for boilers on both thermal power plant and nuclear power plant. It is hard to measure the level correctly. So it brings some difficulties to the control based on the drum water level, even the alarm. Usually, more than three water gauges are installed for drum water level measurement. And it adopts twooutofthree strategy for obtaining the final alarm signal in distributed control system (DCS), which is often the false alarm. Without the right alarm, it is to result in very serious disaster on power plant. One approach based on BackPropagation (BP) Neural Network is proposed in this paper for solving the problem. The measurements from different water gauges are inputted into the BP Neural Network after fuzzy process and the output of the Network represents the type of alarm. Some data of the drum water level from a nuclear power plant is applied with the method of the paper. From the experiments, it can be seen that the alarm accuracy is increased rapidly.Keywords:drum water level。DCS。 BP Neural Network。 alarm。 nuclear power plantDrum water level is an important parameter for boilers, especially for highrunning condition and highcapacity boilers, to run safely during production in thermal power plants. It is very important to monitor the drum level accurately at all times. Drum level may change frequently because of changes in load, busting conditions and water supply.Based on this control system, the dry of boiler and the failure of water screen tube can be prevented. Besides, the system must be able to unfold the purge valve—or stop the boiler if necessary ——automatically when the boiler is full so as to avoid unexpected accidents and expansion of accidents . There are several different water gages