【正文】
of permitting to continue to use such certificate:1. Party A fails to clear any nonconformity identified in the process of audit within an agreed period。3. Party A plaint has been filed against Party A or an accident has occurred, due to Party A’s fault, without, however, causing serious consequences of product quality, environ mental impact or occupational health and safety, etc.。2. Party A fails to take corrective actions upon the expiry of the term as defined in Article 14 hereof。4. Party A has caused accident which lead to serious consequences。 if the loss is caused by Party A’s implementation violating the management system or party A’s fault, it will be Party A’s liability.Article 20 Any dispute arising out of or in connection with this contract will be resolved through amicable consultations, and shall, in the absence of a satisfactory award, be brought before a petent court of the People’s Republic of China.Article 21 The contract bees valid upon execution of signature and seal by both parties, and invalid when the certificate is abolished. Before the term of validity of certificate is due, Party B will implement reaudit for Party A, and the related fees shall be ensured by both parties through new quotation. Article 22 Any matter not contemplated herein shall be determined by both parties hereto upon mutual agreement by way of supplementary agreement. The supplementary agreement shall have the same effect and force as this contract.Article 23 This contract is made in triple, with each party holding one copy thereof, and one additional copy reserved for Party B for accounting purposes.Party A:Party B:Address:Account Name:Telephone:Opening Bank: Fax:Account Number:Authorized signer:Authorized signer:(seal)Signature(seal)SignatureDate:Date:Attachment to the general terms and conditions of contract for the QMS KBA certification1. Additional requirements according to KBAA prerequisite for the issue of these certificates is an existing system according to ISO 9001 and is being audited at the same time. The KBA requirements take into consideration the Road Traffic Laws according to RREGCertification is not identical with initial assessment granted by the approval authority.Interruptions of production for more than 12 months are to be notified to the CQC and the KBA.In case of changes of the standard forming the basis of the certificate it is to ensure by contract, that the certificates are adapted after expiration of a transitional period.The measures required from the manufacturer in the prescriptions of road traffic law (. monitoring of the product) are not effected by the certification.183