【正文】
........................................... 60 選擇主要通風機 ..................................................... 61 選擇電動機 ........................................................ 66 電費計算 .......................................................... 67 其它通風費用 ....................................................... 68 5礦井安全技術措施 ....................................................... 68 ....................................................... 69 礦井瓦斯及性質 .................................................... 69 瓦斯防治措施 ....................................................... 70 停風盲巷積聚瓦斯的處理 ............................................. 72 礦塵及其防治 ........................................................ 72 礦塵及其危害 ...................................................... 72 防塵措施 ........................................................... 73 ....................................................... 73 礦井防滅火 .......................................................... 74 礦井火災及其分類 .................................................. 74 目錄 礦井防滅火措施 ..................................................... 74 煤炭自燃的預防 ....................................................... 75 防止煤炭自燃的開采技術措施 ......................................... 75 預防性灌漿 ......................................................... 75 阻化劑防滅火 ....................................................... 76 惰性氣體防火 ....................................................... 76 6 結束語 ................................................................. 77 參考文獻 ................................................................ 78 致 謝 ................................................................... 79 設計總說明 劉家莊煤礦礦井通風安全設計 設計總說明: 本設計中的劉家莊煤礦是設計生產(chǎn)能力為 180萬 t/a的新型礦井設計,分為 6 章: 1 .礦區(qū)概況; ; ; ; 5.礦井安全技術措施; 。 井田內共有煤層 6層,平均總厚度為 ,有 3層可采煤層,平均總厚度為 ,傾角 15176。 設計井田的可采儲量為 ,服務年限為 65a,劃分兩個水平開采,第 一水平服務年限為 32 年。煤的容重為 噸 /米 3,各煤層回踩率為 80%。 本設計礦井采用雙立井 2水平上下山開采的開拓方式,配有主井、副井、風井等 3個井筒,井筒 采用混凝土、料石和錨桿噴射混凝土等永久支護。工作面長為 270m,每刀進度為 , 每日割 6 刀,后退式開采。 采煤機引進德國艾柯夫公司 SL500 型交流電牽引采煤機。 運輸設備為有軌礦車運輸方式。 采區(qū)工作面日產(chǎn)量為 4040 噸,采區(qū)日采能力為 4444 噸,采區(qū)回踩率為 %。 主井采用多繩摩擦箕斗提升,副井采用剛性組合罐道罐籠提升。礦井總風量為 ,其中回采工作面的通風量為 1211m3/min,掘進工作面的需風量為 620m3/min,硐室需風量為 240m3/min,其他用風巷道需風量為 。通風機的工作風阻,容易時期為 Rsdmin= m8。通風機風壓為: 容易時期Hsdmin=;困難時期 Hsdmax=。電費消耗為 元 /t。 所選電動機的輸入功率為:困難時期為 ,困難時期為 。 本設計對礦井的瓦斯防治,包括瓦斯的聚集規(guī)律、火源出現(xiàn)規(guī)律及瓦斯防治措施;礦塵防治,包括其危害和防塵措施;水患治理,包括地表水防治和地下水防治;防滅火措施的制定,包括防治外因火災和內因火災,特別是針對煤的自燃的預防及治理技術等方面做了詳細的分析和闡述。 2. Waida development。 4. Mine ventilation。 6. Conclusion. Coal mine, there were 6 layers, with an average total thickness of , Layer 3 coal seam, with an average total thickness of , angle 15176。s largest mining height , cut deep , traction speed of 0 ~ 。s advanced condition monitoring and fault diagnosis technology, with automatic memory function. Rail transportation equipment for the mine car modes of transport. Selection of the main roadway bolt steel mortar and shotcrete support. Face mining area to 4040 tons daily production, mining area on mining capacity of 4444 tons, mining area back foot for the % rate. The design of production systems on the mine, coal systems, ventilation systems, transport, waste materials scheduling system, the drainage system has done a detailed design. Main shaft skip the use of multirope friction increase the use of rigid bination of auxiliary cage upgrade guide. Ventilation shaft for the central border out of style. Mine the total air volume for , which the coal face of the ventilation capacity of 1211 m3/min, heading face of the required air volume for the 620 m3/min, chamber air volume required for 240 m3/min, others need to use the wind tunnel air flow for m3/min. Mine ventilation easy period for the total resistance of Pa, coal mine ventilation difficult period for the total resistance of Pa. Drag the work of Fan and easy period Rsdmin = Ns2 ? m8, a difficult time for Rsdmax = Ns2 ? m8. Fan Air Volume QfR = m3 / s. Fan air pressure is: easy time Hsdmin = 。 easy time Qfmax = m3 / s, Hsdmax = 1630 Pa. Selected motor input power as follows: difficult times for the kW, a difficult time for the kW. Due to the need for two motors, so his power Nemin = , Nemax = . The design of the mine gas control, including the accumulation of gas laws, the laws of fire appeared and gas control measures。 flood control, including prevention and treatment of surface water and groundwater control。mine roadway support。 methods of ventilation。 ( 1)本畢業(yè)設計是在完成了各類課程設計及實習報告的基礎上,結合安全工程專業(yè)的特點,綜合運用所學的安全技術知識來解決生產(chǎn)實際問 題,具有實際意義和教學意義。 ( 3) 本畢業(yè)設計將合理的 確定礦井開拓開采系統(tǒng), 再 經(jīng)過技術經(jīng)濟比較,合理選擇通風系統(tǒng)。對礦井通風系統(tǒng)進行簡明扼要的評價。 總之,要求設計數(shù)據(jù)真實可靠、 符合國家政策和我國的國情。南距馬家溝礦 6Km。行政屬開平區(qū)管轄。房屋五千三百余間。 交通條件 本 礦 的交通十分方便,鐵路:一條通往用煤大戶陡河電廠的專 用線,并與呂陡線在我井田上方交匯;另一條經(jīng)馬家溝礦業(yè)公司與老京山線的開平站相聯(lián)。由馬家溝磚廠貸物線接軌引出。公路:北距 10Km 與京沈高速公路、 102 國道相聯(lián),南距7Km經(jīng)開平與 205 國道、津秦高速公路相聯(lián),形成了比