freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

外文翻譯---土石壩的特征及筑壩技術(shù)控制-在線瀏覽

2024-10-02 17:10本頁面
  

【正文】 3. top width The width of the earth dam top is generally controlled by the required width of fill for ease of construction using conventional equipment. In general, the top width should not be less than 30 ft. if a danger exists of an overtopping wave caused either by massive landslides in the pool or by seismic block tipping, then extra top width of erosion resistive fill will be required. The alignment of an earth fill dam should be such as to minimize construction costs but such alignment should not be such as to encourage sliding or cracking of the embankment. Normally the shortest straight line across the valley will be satisfactory, but local topographic and foundation conditions may dictate otherwise. Dams located in narrow valleys often are given an alignment which is arched upstream so that deflections of the embankment under pool load will put the embankment in pression thus minimizing transverse cracking.5. AbutmentsThree problems are generally associated with the abutments of earth dams: ① seepage, ②instability, and ③transverse cracking of the embankment. If the abutment consists of deposits of pervious soils it may be necessary to construct an upstream impervious blanket and downstream drainage measures to minimize and control abutment seepage. Where steep abutments exist, especially with sudden changes of slopes or with steep bluff, there exists a danger of transverse cracking of the embankment fills. This can be treated by excavation of the abutment to reduce the slope, especially in
點(diǎn)擊復(fù)制文檔內(nèi)容
研究報(bào)告相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1